Can Some Kind soul help me see If my quotation is ok. Thanks
ALTERATION AND ADDITIONAL WORK
A.WETWORK
1.To supply and lay selected homogenous/ceramic wall S$2930.00
tiles to master and common toilet area up to ceiling ht.
2.To construct low ledge with hollow block and wall S$200.00
Tiles and both toilet.
3.To supply and lay selected floor tiles to both S$980.00
toilet c/w water proofing.
4.To construct shower curb to both toilet. S$160.00
5*.To supply and lay selected homogenous floor tiles S$6000.00
to Living, Dining, walk way to rooms, store & 3 x
Bedrooms include skirting.
6*.To supply and overlay selected homogenous floor S$680.00
tiles to kitchen floor include skirting.
7*.To cement plaster kitchen wall to receive skim coat S$590.00
plastering.
8*.To supply & lay wall tiles between top and base unit S$530.00
At kitchen area.
9*.To supply and lay feature wall at balcony area. S$860.00
B. SANITARY & PLUMBING WORK
1.To provide material & labour to run stainless
steel piping to:
a. both toilets-WC, basin, and shower mixer }
b. kitchen sink and washing machine area } S$1150.00
}
2. To provide labour to install the following items}
a. kitchen and both toilet sink tap }
c. toilet accessories }
d. 1 x central heater. }
3.To supply labour to install mixer tap and shower S$200.00
Set for both master and common toilets.
4.To supply labour to install wash basin and tap S$160.00
for master and common toilets.
5.To supply labour to install WC for master and S$180.00
common toilets.
*.All accessories and fitting supply by client
C.PAINTING WORK
1.To provide labour and paint (ICI) to paint whole internal S$1350.00
wall and ceiling in emulsion paint.
(Include room 2 and kitchen)
D.SKIM COAT PLASTER WORK
1.To supply labour & material to skim coat plaster S$1900.00
Whole house internal wall and ceiling.
(Include kitchen expose wall)
E.ALUMINIUM AND WROUGH IRON WORK
1.To install selected aluminium bi-fold door with S$360.00
acrylic panel to master & common toilet.
H. FASLE CEILING WORKS
1.To supply and install false ceiling to: S$2300.00
a. Living hall
c. Box-up master toilet PVC pipe(master board)
d. Box-up common toilet PVC pipe(master board)
e. Box-up kitchen PVC pipe above the basin.
f. Box-up kitchen PVC pipe next to cooking hob
(master board).
2.To do general cleaning to whole house- FOC S$200.00
CARPENTERY WORK
A.LIVING AND DINNG HALL.
1*.To proposed laminated flooring to balcony area. S$620.00
2.To proposed design divider feature in selected S$960.00
Timber strip finish between balcony and dining hall.
B.KITCHEN
1a*.To proposed top hung and base unit cabinet c/w S$2730.00
swing door, drawers, shelves, box-up PVC piping
in selected laminate finish with ABS trimming.
C. MASTER ROOM
1*. To proposed wardrobe c/w swing door, hang S$1950.00
rods shelves and drawers in selected veneer ply
or laminate finish with ABS trimming.
(base on new proposal)
ELECTRICAL WORK (Provisional sum)
DISCRIPTION
--------------------------------------------------------------------------------------------------
1. 13A x 1 power point
2. 13A x 2 power point
3. Telephone point
4. TV point SCV
5. 5A lighting point 1 way
6. 5A lighting point 2 way
7. Dimmer switch control
8. Install (simple) light fitting
9. Install ceiling fan
10. Door bell point & installation
11. To run speaker cable
(inclusive of cable)
12. To run earth point
13. Cooker hob and hook point
14. 15A air-con point
16. New DB box
=============================================================
TOTAL SUM: S$2,796.00
=============================================================