Hi All,
Its been sometime since i got a renovation quote for my apartment. I'm hoping to seek advice whether the following quote I received is reasonable for re-doing the whole of my existing 2 toilets (master bedroom toilet and common toilet) for an apartment. The total charges is about SGD19K, with following works. Appreciate your valuable feedbacks.
HACKING/DEMOLITION WORK
Supply labour and tools to hack/dismantle wall, floor tile,
1 bathtub, low wall, shower screen, toilet bowl and attach low wall at master toilet
Supply labour and tools to hack/dismantle wall, floor tile, toilet
2 bowl, shower screen, vanity cabinet, false ceiling, shower screen and toilet fitting at common toilet
WET WORK (Ceramic/Homogeneous Tiles up to $3.00 psf)
1 Supply labour and material to lay 300 x 600 designer's type wall tile up to ceiling height at common toilet
2 Supply labour and material to lay 300 x 300 designer's type floor tile at common toilet
3 Supply labour and material to construct shower kerb c/w full tile at toilet
4 Supply labour and material to lay 300 x 600 designer's type wall tile up to ceiling height at master toilet
5 Supply labour and material to lay est 150mm thick floor cement screeding after hacking of bathtub at master toilet
6 Supply labour and material to lay 300 x 300 designer's type floor tile at master toilet
7 Supply labour and material to do water-proofing for master and common toilet
PLUMBING WORKS
1 Supply labour and material to install conceal piping c/w 2 hot point at 2 toilets
3 Supply labour to install toilet bowl
4 Supply labour to install shower set
5 Supply labour to install vanity sink
6 Supply labour to install toilet accessories
CARPENTRY WORKS (All carpentry is using solid plywood c/w internal white PVC finish, ABS trimmings, soft -closing hinges for doors)
1 Design, fabricate and install vanity cabinet c/w selected laminate finished at master toilet
2 Design, fabricate and install vanity cabinet c/w selected laminate finished at common toilet
3 Design, fabricate and install mirror cabinet c/w selected laminate finished at master toilet
4 Design, fabricate and install mirror cabinet c/w selected laminate finished at common toilet
Design, fabricate and install selected solid surface work top
5 c/w standard 50mm backsplash, 1 side semi curb at master toilet
6 Design, fabricate and install selected solid surface work top c/w standard 50mm backsplash at common toilet
ALUMINIUM/DOOR/GLASS WORKS
1 Supply labour and material to install 10mm thick clear tempered glass shower screen at toilet (1 fix, 1 swing)
2 Supply labour and material to install matching ply wood door c/w vanishing walnut colour, lever lock
3 Supply labour and material to install matching door trimming c/w $ vanishing walnut colour
CEILING/PARTITION WORKS
1 Supply labour and material to install false ceiling c/w main hole at common toilet
2 Supply labour and material to install false ceiling c/w main hole at master toilet
MISC WORKS
1 Supply and material to lay corrugated floor protection sheet prior to renovation
2 Supply labour and material to do chemical washing and $ general cleaning after renovation
3 Haulage fees- uploading of materials and disposing of debris $ after renovation