Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

fz599

Members
  • Content Count

    37
  • Joined

  • Last visited

Everything posted by fz599

  1. thks all. tv will be our existing 40inch and installed on the wall beside br2. guess shd be alright. ya, pretty longish living rm. decent size but the bedrms are small. hence we r hacking wall to built wardrobe. yes, it's opp joo chiat complex and it's a new one. bought during the bto in 2006 n some blocks have taken the keys. we chose the bs to open in kitchen as we thought dat the corridor shd look nicer. we'll see how it goes when we move in.
  2. hi hi, we are likely to get our keys nx mth and we are currently in the midst of shortlisting. the things we are doing (as of now!) KITCHEN & SERVICE BALCONY To construct cabinet base in matching tiles finishes (tiles by owner from HDB) To construct washing machine base in matching tiles finishes (tiles by owner from HDB) To fabricate and install top and bottom kitchen cabinet in laminate finishes with ABS trimming *Blum soft close system drawers and doors *internal color PVC To install solid surface work top for bottom kitchen cabinets To provide labor to install kitchen sink, cooker hood and hob To install sliding windows at service balcony *Black / Silver / Bronze frame with Clear glass To install 1nos additional water point LIVING / DINING ROOM To fabricate 1nos full height shoe cabinet in laminate finishes (5ft) with BLUM hinges *internal color PVC To fabricate and install 1nos TV feature wall in laminate finishes with stainless steel inlays (5ft) To fabricate and install 1nos suspended TV console in laminate finishes (5ft) with BLUM hinges *internal color PVC MBR & BEDROOM 3 To hack wall between MBR and Bedroom 3 To make good wall and floor due to hacking (floor tiles by owner from HDB) To fabricate and install 1nos casement door wardrobe in laminate finishes in MBR (9FT) *backing with laminate as well *with BLUM system To install 1nos casement door cabinet in Bedroom 3 (3FT) *backing with laminate as well *with BLUM system MBR AND COMMON TOILET To erect shower kerb in matching tiles finishes (tiles by owner from HDB) in MBR toilet To fabricate and install glass shower screen in MBR toilet To provide labor to install bidet sprayers for 2 toilets To hack and remove 2nos existing basin To provide labor to install 2nos new counter top basin To fabricate and install 2nos vanity cabinet in laminate finishes (with BLUM system hinges) To fabricate and install solid surface worktop for vanity cabinet for MBR vanity cabinet To install new inlet / outlet piping for 2nos new basins CEILING WORKS To install false ceilling for living and dining area with side cove lighting MISCELLANEOUS To carry out painting for whole house To carry out industrial cleaning for whole house To provide haulage of debris and materials (including floor protection) To provide labor to install accessories To install window grilles for kitchen, service yard, living room and 3nos bedrooms *Bronze, black, silver
  3. good buy... best is having promo and still able to pay using installment. hope i can get similar offer on jun
  4. sorry for the long silent, currently contacting id n contractors. basically we have, more or less, the theme and idea wat to do. now is to come out a 3d plan which is likely to be done by me. wanna save the $$.. haha also waiting for the flat to be ready, which estimate to be mar/apr2010 can't wait to chk it out and hopefully i'll post some pics
  5. hi, can i have henry's contact? thks
  6. thks for all the welcome... it's a hdb 4rm which cost 285k then btw, what's spam chop ah??
  7. our headache is the wardrobe as we try not to hack walls (save cost) and yet have a decent size
  8. our floor plan. squarish, long but small mbr
×