  1. Entrance Kitchen Kitchen-left side Kitchen-right side Common toilet Went to check the house just now and all tiling is done. The tile that we reported chipped off had also been replaced. The ID seems to be more perfectionist than we are which is a good thing. haha....
  2. Now i finally get the thrill over the new house. The feeling of witnessing the house becoming nicer is unexplainable! The tiling of the house is almost done. Plastering also mostly done up except for the the living room bcoz all the "stock" are still stored there. Have to wait till all the tiling done so that the can clear the space. Some photos: MBR (last part of floor tiling!) Think this part will be done by tmr then all the tiling is done! BR2 BR3 Living area Dining area
  3. We are going to sleep by roadside by end of this month........ The reno cannot complete in time and the HO will postpone to early Jan, but we already told our current landlord we will only stay until end of this month. And we have to called up all our suppliers (bed, furniture,.appliances) to postpone all the delivery! Our new person in charge, Amy is really nice and trying her best to chase up all the ppl to rush the job. She also complained that the tilers took a long time to do the tiling work. Tsk tsk tsk..... Coming week will be completion of tiling work, electrical/ plumbing work and ceiling work. Bcoz we have to move in soon, she will have to make sure that at least everything in the MBR is done so that we have a place to sleep..... Yesterday we had a super long discussion with Amy in her office to finalise all the designs....discussed until we got dizzy.....so many things to finalise, the design of all the carpentry work, electrical points, laminates for all the carpentry work, colours of paints....bla bla bla.... We are making changes to some of the designs, especially the kitchen. Hopefully will get the finalized 3D by tmr. To summarize: 1) no more bar counter in the kitchen. We are doing a normal L-shape kitchen, with one of the "column" of the lower cabinet able to be pulled out and acts as a make shift small table. 2) No more black and white kitchen. Hubby is very extra and he thinks black and white too common so he chose silver colour laminates. I hope it will look nice. and some colour changes on the shoe cabinets, wardrobe etc.
  4. Hi peeps, I'm trying to search for those retractable laundry system for HDB. Anyone has any contacts?
  5. Oops....i haven't posted any pictures yet. Was away from Singapore last weekend and all the site-banning in my company makes it inconvenient to update often. In any case, we have gotten the revised 3D from ID. Quite happy with it. We initially planned to moved in by 20th but now looks like it has to be end of the month. Went to check to house on Wednesday night and the wall tiles for kitchen and 2 bathrooms are already up, but haven't done any tiling of floor yet. We sort of foreseen that as the application to hack wall and all the ding-dong took up a few days.... Have talked to the staff from ID firm and got assurance that things will keep moving on keeping our finger cross that nothing else will come in the way and we can move in by Xmas. If not we are going to be homeless! Haha..coz we are renting now and already inform the landlord we will move out by end of this month. by the way, anyone has any contact on those laundry system where you hang all your clothes indoor and then swing the rack out the window? What is it called actually?
  6. yeah....i have gotten over the disappointment. Our Id help to design a bar counter within the kitchen! hehe....a bit "mian2 qiang3" but i don't care! haha ..... Will post the 3D over the weekend. Office computer cannot access many sites
  7. It has been confirmed......CANNOT HACK!!! Was very disappointed when received the news....oh well....we are changing the design. looking into either having a bar counter against the wall or make a breakfast counter within the kitchen....
  8. yes. we are changing the orientation to sth like tat. but not diamond shape. just a rectangular one, extending to the wc side. haven't talked in details with ID bcoz he's very busy that day but i think he say make square one then can still use frameless screen. And he didn't mention about extra cost wor....hopefully no extra charge?
  9. Some more updates: Over the past few weeks we have made many many trips to retailers to compare prices and have also made some purchases. 1) mattress and bedframe 2) sofa, dining table, coffee table 3) fridge, washer, water heaters 4) hob, hood and oven Things that we have viewed a few times but still pending: 1) air-con (probably getting from Gain City) 2) lightings 3) ceiling fans 4) bedside table 5) WC, basins, kitchen sink, taps etc Am happy that we are slowly getting there......buying things is such a pain when you have a tight budget! I think all the salesperson handling us are scared of us now.....haha
  10. We are keeping our finger crossed..... The PE had come down to inspect. Hopefully it will be approved! I am dying to have the kitchen like that....if not approve i will be very very very sad.......
  11. Hehe....it's not mosaic. It's tiles with "checked" effect. Anyway, the orientation of the MBR bathroom had to change. I am a bit disappointed but no choice. If we follow the original plan, the shower screen will block the window, hence the window can't be opened! so we cannot divide the shower area like that and have to do a ugly "box" for the shower area instead. sad
  12. Master bedroom not doing much for the bedroom except the wardrobe. MBR bathroom kinda like the wall....looks like the Matrix. Hopefully it turns out nice.
  13. 3Ds from the ID: Living room We don't like the green colour though..... Green + purple looks like........ Living room view from kitchen kitchen Dining + kitchen view from living room
  14. Week 1 of reno have passed. Tmr morning we'll be meeting up with Jackson (boss of the ID firm we engaged) to sign the invoice officially. Come to think of it, maybe he sort of knows my hubby, he never take the first 10% and never wait for us to sign the invoice but already started with the job. In the quotation it was stated must pay 10%+40% by 1st day of work de.... hehe....So far he's still scoring points. Let's hope the project management and workmanship will be as promising!
  15. Pre-fabricated flat means the house is made from pre-made "blocks". In hokkien they call it "dau chu". they just put all the square squares together and cement together to become a house. not sure this explanation is clear. haha.. It's a bit like lego.... You can directly call up HDB to ask if the block is pre-fab, or if you see your floor plan there is a lot of thick black lines means it's pre-fab. Check out my floor plan then you can see. Hope this helps.
  16. Yes! The excitement started this week! Hacking work for floor tiles have started, we have selected our tiles, and ID have sent us the designs after our feedback from the 1st round, which we are quite happy with. Just need to do some minor changes and also colours of wall. Hopefully can post some photos this weekend. till then.
  17. We just got our keys this Monday! Kind of excited but we know this is where all the worries and troubles come before we can move officially. Last weekend when to choose tiles at Soon Bee Huat but they don't have stock for the tiles that we want. Then went to another shop recommended by ID on Monday. But they don't even have it on display. We are difficult...haha...because we want white tiles for living area but actually there is no while colour homogeneous tile in the market. We can only choose the "whitest" off-white.We will end up using tiles from both shop for different area of the house. ID have helped us to apply for permit for hacking and hopefully everything goes smoothly and hacking can start next Monday! Btw, i realised they are a lot of forumers from Tampines. No?
  18. thanks, wakzool. Where did you get your Ariston hob and hood + oven? the prices look good.
  19. We have fixed our ID. The uncle quite nice and many things are negotiable...... Now finalising designs and looking around for furniture and electricals..... Very excited now. Second appointment next Monday!
  20. Hi, hope someone with experience can help. What is the exact statement in your quotation when you ID quote for re-wiring? My quote says sth like this: Labor & material to install new electrical distribution board complete with ELCB, MCB & circuit breaker.(Ht 1800mm) Does this mean re-wiring already? Or he only wants to change the DB but not intending to re-run all the wires?
  21. Hi, hope someone with experience can help. What is the exact statement in your quotation when you ID quote for re-wiring? My quote says sth like this: Labor & material to install new electrical distribution board complete with ELCB, MCB & circuit breaker.(Ht 1800mm) Does this mean re-wiring already? Or he only wants to change the DB but not intending to re-run all the wires?
  22. Hi Gobii, Are you an engineer/ scheduler? I saw your items table i can't help to relate....haha....it looks like BOM to me! Maybe i should start doing one for my house.
  23. We talked to the 2nd ID on our shortlisted list. This uncle sounds better. He used to be a contractor and now own an ID firmwith 2 designers helping him. His quotation was at the same range as the other 2 shortlisted candidates. What i feel confortable is when we ask for additional things that is considered "small", eg: a 2 ft vanity in MBR toilet, he say he can do for free, unlike the rest who immediately bring out calculator to add cost to the quote. He also offered to give us a rounded off figure and throw in electrical work with rewiring for us. But he also admitted that they won't use branded stuf like BLUM or Legrand. They use "in-house" brand aka made in China. IF we want to upgrade to blum or legrand must top up accordingly. We calculated if we want to top up to Legrand for the main switches in the house it's about $200 more? OK. Digress, actually i want to ask, if rewiring the house, normally what is the line quoted in the quotation? This one says something like install new switches and electrical distribution board. Does that mean rewiring? or he just change to DB for us only?
  24. We did ask for many quotes.....abt 8-10 then shortlisted 3.... Very tiring..... thinking of going to another one in the shortlisted list lo....some of the quotes we get are from contractors too...but their price not very much less.... maybe bcoz we are doing all the basic things only... ID and contractor won't make much difference? from the shortlisted ID/ contractor, their quotation are all around the same region. Now we only choose whose design is better and who is easier to work with.
×