Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

user101

Members
  • Content Count

    60
  • Joined

  • Last visited

Everything posted by user101

  1. Hi All, Please take zhiz's advise, do your home works and ask for a few quotes. User101
  2. Not yet. Some have ask for quotation. Due to CNY, if any of them use him, it will be after CNY.
  3. 20 Jan, exactly 6 weeks: The "official" move in date, The same day the Sentosa hotels opening. although the metal gate will not be ready till 23 Jan, we choose to move in on the 20 Jan because it is consider a very good day for moving and opening. My custom make master bedroom's bed and TV console will not be ready too. However they are going to deliver the dinning table, coffee table and loan a King size bed and TV console on 20 Jan.
  4. Along Sungei Road, there is a shop there collecting scrap metal. You may want to try them.
  5. My reno is going to complete mid next week. I'm very happy with my contractor 老和, if you want his contact PM me.
  6. My Condo in Changi Court have a high ceiling in the living too. It come with 2 huge air-con blowers.
  7. HDB are design for single loading, so you can't build "another build up area". It is not truth that all condo can build "another build up area", it depend whether they are build for double loading.
  8. Wow! High ceiling, I like Don't create "another build up area", unless you ready need the space. High ceiling look majestic! Make full use of the ceiling, play with lighting. Create a "WOW" not a "EEH" effect.
  9. The contractor I'm using is good and one of the lowest quote I got for my own house renovation. If you are interested let me know.
  10. My 4 rms HDB flat cost me about $40k. See my T-blog for more detail. One of the lowest quote I got. Some quoted me as high as $57k Good luck
  11. Day 21 - All the tiles are lay. Currently the contractor are doing the wall patching.
  12. Seem like Alex is not a HDB Registered Renovation Contractors who can carry out Window works.
  13. Maybe you should post AS* picture here, so that everyone here know who AS* is. He may change his name, I don't think he will change his look.
  14. I have say this way back........................... in early Nov , no victim take the advise, at that time some "victim" even still recommending AS "The superstar" to other forumer. Call me Kaypo, but after reading this thread I ready can't stand it anymore. I feel sorry and angry even it is none of my business. First of all, let me clear up one thing. I'm not a contractor nor a client of Ah Soon too. I'm just a guy who just brought a HDB apartment looking for a contractor. If the exiting clients of Ah Soon want to get your reno complete soon. I feel that all of you should stand together. Boycott Ah Soon until the outstanding jobs are clear! Do yourself and other a favour by putting your renotalk ID, commencing date, status of the reno now. Update regularly in this tread till your reno is completed. eg: ID: User101 Commencing date: 01 Aug 09 Status: 50% done For those who had their home done by Ah Soon and want to help, please remove his name from your forum signature and STOP RECOMMENDING him to other. At lease until he competed the BACK LOG here. If you are meeting this Ah Soon, let him know he is being boycotted on renotalk till he completed the back log. Hope this help to push him to complete the jobs faster and good luck.
  15. If you read the thread right back from Nov 09. When AS stop answering call from his victim and start MIA and yet AS still "Call-up" one person. You will realized that this person is the only one, who is always in contact with AS. Sometime even as a messenger. At 1 point, I even thought that this person work for AS. When HO was delayed for 4 month this person are still talking about money saving from engaging AS. Go figure out ...........
  16. 经过那么多风风雨雨,我想你会更珍惜你的房子。
  17. Here's my tile selection from White horse. The kitchen wall tile is the one on the lower right, white base marble like tile.
  18. Day 4 - Tiling of kitchen 5 workers working on it, estimated 5 days to complete the tiling.
  19. NEVER NEVER NEVER NEVER NEVER trust a desperate man! He will go all out to get things he want.
×