![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_pattern.png)
![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_default_photo.png)
yingsan
Members-
Content Count
53 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by yingsan
-
hi pink_sea79.. congrats ! u r in Blk D?? when did u submit ur loan application? hdb is really taking their own sweet time...
-
hi yel, why nt call hdb to enquire? coz me already submitted my loan application on 1sep liao.. i juz called hdb, the officer say our keys are ready le.. but my loan still processing and i ask for expedite and i told her i wan my keys in early oct..
-
yippee shall take a look one of these days.. i went last week, but cant access.. anyone in blk D getting key soon??
-
hw did u manage to enter blk D? we tried but all entrance are locked..
-
Hi rainbow04, i submitted on 1st Sep leh.. more than 2 weeks liao lor..
-
i went there yday evening, got one ID told us HDB is releasing keys to Blk D on 20th lor.. but so far, my status still remain as "due course".....
-
hi my status is still the same.. anybody consider putting dining table into kitchen? We are considering it.. is it feasible?
-
Hi all, i actually input the quotation in excel.. but so many of u asking for it, so i might as well post in here.. but i shall nt put the company name (too sensitive?) hehe.. later contractor sue me? mayb can juz treat it as a guide so that u know how to bargain.. But i still find it abit expensive and got some hidden cost.. 1 Demolition Work 1.1 Existing concrete wall @ MBR b/w BR 2 1 lot 1.2 Existing door and door frame @ MBR & BR 2 1 lot 1.3 Existing w/c & basin @ both bathroom 1 lot 460.00 2 Masonry 2.1 Homogeuoues tiles 600mm x 600mm to L/R D/R & H/S 350sf 2,400.00 2.2 Matching skirting to L/R, D/R & H/S Ls 350.00 2.3 Cement seceding to 3 BR 2.4 New Laminated flooring to 3 BR 430 sf 1,668.00 2.5 Laminated skirting to all area Ls 280.00 2.6 Kitchen cabinet base 1 lot 180.00 2.7 Fridge & washing machine base 1 lot 250.00 2.8 Make good to affected area after hacking of wall Ls 250.00 2.9 Construct new wooden door frame to MBR entrance 1 nos 180.00 2.10 Construct shower kerb to MBR 60.00 3 Electrical Works (12 points) KIV 4 Ceiling Works 4.1 False ceiling to L/R, D/R & passage way 300sf 880.00 5 Painting Works 5.1 Under coating oil base sealer to all ceiling 1 lot 200.00 5.2 Paint whole house using ICI/Nippon emulsion paint 1 lot 980.00 6 Plumbing Works 6.1 Connection water point to sink and washing machine 1 lot 250.00 6.2 Installation of w/c & basin @ both bathroom 350.00 6.3 Installation of central heater & bathroom accessories 1 lot 260.00 7 Sundries 7.1 Build in t/p glass frameless shower screen @ MBR Ls 550.00 8 Carpentry Works Foyer 8.1 Shoe & storage cabinet (1800mm x 400mm x 500mm) 1 lot 800.00 Living & Dining 8.2 TV console c/w mirror feature @ family area (3000mm x 2650mm x 50mm) 1 lot 1,800.00 8.3 Timber strip with veneer finish @ D/R entrance area (60mm x 100mm x 2650mm) 3 nos 350.00 8.4 Wooden divider with laminated finish @ new dining area b/w kitchen (80mm x 900mm x 2650mm) 1 lot 350.00 8.5 Wooden feature wall c/w mirror with laminated finish @ dining area (2400mm x 2650mm x 50mm) 1,380.00 Master bedroom 8.6 Bed head board c/w bedside table (Queen size) (2500mm x 1300mm x 80mm) 1 lot 850.00 8.7 TV consolde c/w feature wall (1500mm x 700mm x 2650mm) 1 lot 1,450.00 8.8 Wardrode with sliding door in laminated finish (2750mm x 650mm x 2650mm) 1 lot 2,470.00 8.9 Writing table c/w top hung cabinet and divider 1 lot 1,380.00 8.10 Wooden ledge in laminated finish @ window area (300mm x 3200mm x 80mm) 1 lot 680.00 8.11 Vanity design c/w solid surface top, low cabinet, mirror & light pal met (1500mm x 500mm x 600mm) Ls 1,450.00 Kitchen 8.12 Kitchen cabinet with laminated finish top & bottom 16fr 1,850.00 8.13 Solid surface work top to new kitchen cabinet 12fr 840.00 9 Miscellaneous 9.1 To do acid wash & general cleaning works FOC 9.2 To supply labour for haulage & removal of debris FOC Total 25,198.00 After discount 23,800.00 Term of payment : 15% down payment upon confirmation as deposit 40% progession payment upon masonry works 40% progession payment upon carpentary works 5% final payment upon completion
-
i got one quotation with all the breakdown of the cost, its abt 23k... seems reasonable but i still tik it can be lower coz there are alot of carpentary with i dun really like.. if u like to compare, pls drop me ur email add..
-
hi doremi i tik the ID shld provide at least a basic and simply design of your hse. For me, i din source for IDs opp our blk coz actually i dun stay near TPY at the moment. But i got a quote from one ID from IMM and he actually provide me with a design and breakdown of the quotation..
-
hi yel, urs is under SERS rite? mayb different? coz im from balloting one.. but still we are collecting keys in due course.. !!
-
I juz check my hdb website, it change to : HDB will invite you to take possession (ie collect keys) of your new flat in due course" yippee
-
hi M&M, can u email me ur photos too? my email syying_sim@hotmailcom thanks! doremi, u submitted ur application on 21aug and u r collecting key on 20sep! congrats! that means i will get my key roughly on 1st week of oct coz i submitted on 1sep.
-
Hi strawberry pear, can i hv the list too? thanks
-
i got the loan letter already, will be submitting tomorrow.. i called HDB but the officer told me contractor have not release blk D key to HDB yet...
-
hi yel.. wow tat is very long leh.. 1-2 mths to take key.. i need my home to be ready before dec.. tik tomolo gog to call hdb to check whether can expedite.. haha..
-
u oso in blk D? im getting more n more excited.. hopefully i will receive mine this week.. if nt im gog to call HDB... normally hw long does the loan take to approve? and after approval, how long we still need to wait to collect our key?
-
hopefully so.. so anxious.. which level u staying?
-
hi rainbow04, im in Blk D!! but i hvnt receive letter regarding HDB loan..
-
hi do we need to apply for HDB loan eligibility (HLE) letter from HDB first? I saw from HDB website we need to get the HLE letter 1st if we wish to get HDB concessionary loan..
-
hi, so happy to hear that ur MIL is getting the key soon.. Shld be quite fast after they assess the loan.. yippeee... i hope to receive mine soon too! i called the officer in charge to let me be the first batch to collect my key as my wedding is in dec..
-
hi just came across singaporebrides forum and saw one posting by one of the forumer: Common Toilet i) Walls Tiles are White Top, Bluish Grey (something like that) ii) Floor is Grey Mast Toilet: i) Walls Tiles Same ii) Floor is a darker Grey Cant dismantle for 3 yrs Kitchen: i) Walls Full White Tiles ii) Floor Also White (Darker) http://www.singaporebrides.com/forumboard/...html?1174900696
-
Thanks maple for uploading the pics.. Thanks carelinwen for the updated list.
-
Hi all I tik not all ID firm require the appointment fee.. some can give free quotations, but nt sure whether it is base on those material u chose.. or just an indicatively quotation.. i only found out recently.. But what my ID will do is: provide design, furniture layout and colour proposal and base on my requirement and material i choose give me an actual quotation.. we quite like their design, so we sign up with them lor..
-
Hi Jen, yes i enjoy the process.. the most enjoying part is gog for gown selection.. trying all the gowns makes me wish that my wedding is near.. haha... oh yes, btw, i just engage an ID yday... hehe.. Gog to meet her this sat to discuss abt floorplan and quotation.. They are very flexible (nt sure abt other ID firm), we just need to pay an appointment fee and they will provide us with space planning, furniture layout, design, material, colour proposal and also showflat viewing.. then after that they will give us the final quotation.. Oh yes, they will work within my budget.. ANd if in the end, i dun intend to engage them, the appointment fee can be used to exchange for vouchers or selected item from them.. So, tik it is a win-win situation ba.. From her experience, she say our flats gog to be ready soon.. roughly ard 3rd or last quarter of this year.. lets pray hard.. hehe