

feimei
Members-
Content Count
552 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by feimei
-
only manage to go on site this evening to take a look....all things need to be hacked, already done!!!! yeah~~~yeah~~~coming mon will be laying the tiles...hope to come back with more fotos to share here.....
-
ID brought his contractor over to look c look c the living room celling top.... hubby wan to remove the 'silly' corning.....this corning make the whole room look very lower... will convert into like dinning area one....so that the celling will appear higher....
-
bye bye ugly cabinet.... bye bye ugly toilet....
-
Hmmm~~yalo...it can be easy, depend how u c it but hor...for me...sq area quite limited area and cannot go for big size item....hahahaha....soo i can imagine if my sofa going in....half the area will be gone.... ya~all homes i went....the bedrooms r usually at the same place...for mine...one of it on the other side....being isolated...hahahaha...actually, i got k-po...when walked pasted neighbour hse, when their doors open, i got peek in n c...the isolated bedroom was hack to be smaller to make the living room looks bigger.... actually hor...jason was doing a over-haul above my unit...that time searching for ID/contractor for reno, i did went up to find jason.... so, that unit oso got that bedroom hacked into smaller area n the living room.... looks soo much BIGGER....too bad...we hv budget constrain, no choice....
-
Very nice already, just some minor touch up here and there and will be Perfect lol~
-
Hmmmm~~~~yalol...maybe will get hubby to chk it out after work.... yalol....start hacking must pay 50% oledi worr...anyway...if they do the job, payment shld not be a prob...i oso think to hold back 10% is better....@ least got abit of 'power'.... no wor....top AND bottom, 20ft leh....tat's y lol....soo i 狠下心 not to hv top cabinets lol....no choice....hv to change my hoob to chimney and top up $$....
-
yeah...yeah....i read ur t-blog...u oso in the west...we r the 'Westerner'... but hor...not sure will the ID really start work today leh....he told us that the day start hacking, we need to pay 50% ler worrr...but today, me n hubby will not be on site...hahaahha....see no $$$, will they do the work? but...after hacking...next wk laying tiles n flooring, need another 45% and last payment to be 5% but i told him we will need to hold 10% for last payment leh, is that the usual practice? next will be cabinet issue....the package only come with 20ft cabinet, which i noe is 'very limited'...so i decided not to hv top cabinet....called ytd to change the hoob to chimney design.....
-
hahahaha....yalol...finally this day reaching lol...can't wait to complete the reno asap.... chk w u...how is ur reno payment like?
-
reno starting tmr~~~ can't wait to see those ugly cabinets being whack off....hahahaha~~
-
i c...i c...yalol...if wan the slow-closing add-on...u oso need to add on $$$ lol.... will those little plastic 'cushion' find-able outside or it mus come from carpenter?
-
issit....hahahaha...i tink is common choice leh... we bot from Hafary tiles @ Balestier worrr....very popular place leh....becos whole place was crowed with ppl...i think the wall tiles is $2.20 or $2.40 leh...
-
ok, tink thats all for the foto for now.... as this thur will be hacking...too bad...i can't be present becos can't take leave....hubby oso cannot be present... i can only go up this sat....i tink by dan...the whole place will be 'flat' already....hahahahaha.... dan following working day, they will start to lay the tiles n flooring and it will take approx one wk....but hubby will be on site when they start to lay becos Hamed wan to confirm everything is correct and with customer ack before his men really proceed...
-
MBR bathroom floor (got blink blink effect leh, i luv it!!!!) MBR bathroom tiles and mosac (for deco):
-
Common bathroom floor: common bathroom tiles and mosac (for deco):
-
here r the tiles selected for floor n bathrooms: kitchen wall tiles (as supplier run out of sample, so we just took foto of it ) kitchen flooring (abit smooth surface for easy mopping...)
-
let me upload the pic ltr...i think office blocked it.
-
thats i think he quite good for this area becos we kind of quite tight in budget and only hv abit for buffer, not much and seems like bits n pcs will add up to one whole lump sum.... oohh....i think u got it wrong...the rect box-in will be for the living rm celling which is the 'mushroom' will be totally + completely removed....
-
rasp, do ur kitchen cabinets come with slow-closing?
-
thanks, rasp hahahaha...'country' style mah.... no leh...her kids all grown up...according to her lah....her contractor wan to add 'some' deco to the room lol....so do this 'silly mushroom'....hahaahhaaha...anyway....'auntie-taste'...
-
ytd Hamed came to look c look c the house and do those neccessary marking for this thur hacking.... haiz~~~need to add in $$ for the bathrooms...becos previous owner got the air-con tranking construct in the bathroom n the tranking soo ugly... No CHOICE, if got to make it 'less visible', he will ask his air-con guy to sort of 'hide' it....not sure how he gg to do it but he told hubby already....i dun really understand wat they toking....so long hubby noe, can already....and that's go the cost of $180 for each bathroom.... handed the keys over to him in order for him to bring his workings in on thur.... Rem the silly 'big hole' corning in my living room? hubby decide to remove it and cut a bigger hole, make it a rect shape....same as dinning area celling....so that the celling wun looks that low....again...this not in the package...it's a add on...again, EXTRA cost...very considerate Hamed, he say he will let us alias with his contractor 'Directly' so that it will 'save abit'.....
-
hahahaha....ya..maybe that time ur PM full lol... actually it's painting....like during our sch time....on our art class...we do those 'artistic painting'....
-
hihi butters...u r here!!! aiyaa...told u before lol...previous owner veri complicated leh....'international' theme in the hse...this dinning area...think she wan it to be country style...actually, there's 3 wood-like (made fr softboard) logs...being put across the celling, hubby n FIL removed it away...so left with this big rect box-in area...will paint it of with white while thinking how to deco it lol....
-
Common bathroom: MBR bathroom: Wardrobe in MBR (will hack off) Will also remove this silly 'mushroom' partition: that's all for the fotos..... when to select the floor n wall tiles this noon for kitchen n toilets....will post the foto soon... oso went to bot the lightings just now but forgotten to take foto of the lights that we bot...
-
Dinning Area: dinning area celling:
-
got good n bad lol....all sq but area is small leh...soo furniture wise....cannot buy big items...