Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

coco_mybibi

Members
  • Content Count

    109
  • Joined

  • Last visited

Everything posted by coco_mybibi

  1. I think you can try Hitachi financial company. I heard that it offers the lowest interest rates among all. Do call them to find out more.
  2. They will turn on the electricity and water for 3-4 days from the day you collected your keys without activating it. This is for testing any defects. After you activate your account, they will start to charge. Activation can be done via the internet and it takes 3-5 working days to be activated. Hope this helps Another thing I want to highlight is pls do check each and every of the tiles. I found quite a number of hollow tiles in my kitchen and both toilets including the floor tiles. I reported my first defect on Sat and they replaced it on the same day. That's fast of them.
  3. finally collected my keys, so many keys... I only check if there are cracked tiles and all the door locks. What else should I need to check for defects? Anyone can advice?
  4. Finally the wait is over. Will be getting my keys later in the morning at 10am Happy Valentine to everyone.
  5. Wishing everyone a happy and prosperous year ahead. May everyone njoy your new life, in your new flat, in the new year
  6. An ID proposed the same thing to me too... to cover up the window with a feature wall. However, my current ID said it will be good to leave the window there cos it will be good if you are eating steamboat and the room will not be too smelly, which I think is quite true too.
  7. Yeah, my turn now. I will be collecting my keys on Feb 14 morning. A good valentine present for us !! Managed to get hold of my OIC yesterday and today I got to see a collection date liao BTW, for those who have installed 2 air-con compressors, did you fill in the form and apply for approval to install a second compressor from HDB? My HB checked with HDB and the officer said that there is a need to apply for installation of the second compressor else they have the right to ask you to remove it. So something to take note here.
  8. I called HDB liao. Confirmed that all the keys are with HDB alr. Advised to call your OIC and tell them u need the key urgently if you want to collect the key earlier. I have a hard time calling my OIC, no one picked up the call.
  9. think I should call HDB and push them for a date for key collection. wat is the number to call huh?
  10. I got the same status too. Congrats Shivan...you are the first few from Blk A to collect the key
  11. mine is also 5 rm but I am from Blk A. The ledge looks small to me and it seems like I can only have 1 compressor.
  12. your aircon ledge is very small too? is there a window near your aircon ledge? do you have a pic? I wanted to have 2 compressors but the ledge is too small. If I stack 1 on top of the other, the small window at my living room cannot be open.
  13. anyone here install 2 air-con compressors?
  14. Hi M&M, Thanks for your clear explaination. I get the picture now. My ID did include the haulage fee in the quote but it is lower than the amount you mentioned. So he will absorb the remainder...
  15. I am rather confused over the haulage and debris fees. Our ID will have their own contractors. Aren't their contractors going to carry and clear away the debris? The haulage and debris fee supposed to be included or not in the quote?
  16. My ID is from Blink23, not Cistern
  17. Hi Yeoman, Is yours 5rm? My quote is around 40k plus excluding those you mentioned too. I have alot of carpentry work and glass works and that's why the quote is high. I find the pricing is reasonable based on so many items in my quote. The best part is I get to see the 3d graphics before I signed up.
  18. I went to summit too and the ID din get back to me after that. I din bother to call and just drop them.
  19. so yours is about 1.5k for each toilet...does it include shower screen? about 2k is quite exp...does it comes with shower screen too?
  20. wanna check with those who overlay your toilets, do you also overlay the floor tiles? How much is it for each toilet to overlay both the wall and floor tiles?
  21. Congrats to you Are you from Blk B?
  22. anyone here can intro me a cheap PE cos I need to hack a wall. thanks.
  23. Hi shivan, I stay at lower floors. Ya, I sneak in to see my unit and found that the ledge is small. I'm not sure about 79E but I find the ledge for A is small. Think not big enough for 2 compressors.
  24. hey alister, mine is 5 room. erm, what is isolator huh? Dangerous to stack or not? I intend to get inverter aircon but think I need 2 compressor cos all rooms will have no air con if the only compressor breaks down. Hi Redwyrm, thanks for the info End Jan will be the last audit isit? Sigh, wait till the neck long long liao. Heard that it will be better to get the items for the home during xmas or cny sales cos the prices are more attractive than the gss sales. hi droplets, my id is jolson. you engaged them too? really got to say my id is good cos he helps us to save some money and also give alot of good and practical advices to us.
  25. Happy New Year Everyone...finally is Jan now. Hopefully can collect the keys at the end of this month or next month for Blk 79A. I finally found my ID after meeting up with a few IDs as well as those recommended by some neighbours here. My ID is from Blink23 and appreciate his patience as I have been undecisive with some of the designs ;P Want to ask how many air con compressors do you have as I saw that the aircon ledge looks quite small for 2.
×