Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

droplets

Members
  • Content Count

    114
  • Joined

  • Last visited

Everything posted by droplets

  1. I should be getting my keys soon too cos loan approved! Can't make it this Sun too. Another outing perhaps. : )
  2. my OIC lagi swee man. currently on leave and back on 9 Oct!! zanie, wat is the status of your flat? is it "HDB will invite you to take possession (ie collect keys) of your new flat in due course."? By right they should have a column on loan status (ie. in process, approved, pending etc) as least we will be able to know if our documents has reached them safely.
  3. Isn't we suppose to drop this topic. I think it's a little exaggerate... and I don't think it's true. Carelinwen, tat enci in tooth relic has 300 over postings. this enci(with a space) only has 2 postings.
  4. For your comparison. Living room 1) Homogenous floor tiles including shelter plus skirting - S$2450 2) Construct 10ft full ht laminate feature cabinet with shoe rack for shelter - S$2180 3) Construct 7ft full ht laminate feature wall for tv - S$1260 4) Construct 6ft half ht laminate tv console include drawer and doors - S$840 5) Construct 117sqft false ceiling and 23ft L box in foyer area using fibre board material - S$480 6) Construct 72sqft false ceiling and 17ft L box in passageway leading to bedroom using fibre board material - S$350 Kitchen 1) Construct 11ft bottom, 13ft top laminate w abs trimming suspended kitchen cabinet with handles - S$2650 2) Install 11ft solid surface table top for kitchen cabinet - S$780 3) Construct base for fridge and washing machine - S$150 4) Construct base for kitchen cabinet - S$180 5) Install 1no. 10mm thick clear frameless tempered swing door entrance for kitchen - S$480 6) Install kitchen sink and tap - FOC 7) Install cooker hod and hod - FOC Main bedroom 1) Homogenous tiles with skirting - S$1980 2) Construct 10ft full ht laminate feature wall swing door wardrobe - S$2180 3) Construct 7ft full ht false wall to level the beam using fibre board material - S$480 4) Construct 6ft ht laminate 2 sided feature wall for TV - S$2150 5) Construct 6ft half ht laminate tv console - S$840 6) Construct 9ft laminate half ht study table plus drawers and doors - S$1260 7) Hack off existing 15ft full L shape wall btw main bedroom and bedroom 2 plus plastering to smoothen the sides - S$480 8) Hack off existing main bedroom and bedroom 2 door and door frame plus plastering to smoothen the sides - FOC 9) Install 1no. nyatoh wood door frame for main bedroom new entrance - S$180 10) Install 1no. nyatoh wood sliding door for main bedroom new entrance plus lock, keys, handle, thread and box up thread - S$950 11) Construct 60sqft false ceiling in main bedroom plus 24ft L box coffer lights using fibre board material - S$350 Bedroom 3 1) Homogenous tiles plus skirting - S$880 Main bedroom toilet 1) Construct shower kerb - S$80 2) Install 1no. 10mm thick frameless tempered clear glass shower screen with swing door - S$480 3) Construct 5ft vanity top using solid surface, plus bottom suspended laminate swing door cabinet and full length mirror - S$1150 General items 1) Supply labour and material to lay protection sheet for flooring - S$150 2) Supply labour and acid wash for whole house including cleaning of windows - S$180 3) Supply labour to clear all renovation debris - S$380 4) Supply and connect copper piping from existing hdb pipe to kitchen sink and vanity top in main toilet and washing machine inlet and outlet point - S$1380 5) Supply labour to install all sanitary items - S$350 Payment: 1) 10% to be paid upon confirmation 2) 40% to be paid when received all materials (ie. tiles, sand, cement etc) 3) 40% to be paid on confirmation of all Design & Color on all woodworks 4) 10% to be paid upon hand over of project. Total : S$27,680
  5. doremi, sent him an email then. M&M was saying that it takes about 3weeks to receive a letter from HDB, since your dateline to submit the loan application was on 21 Aug so you'll probably received it soon.
  6. hi doremi, why not u call up the officer to check?
  7. Agree with ML too, was trying to delete my post on the *** issue but unable to. Happy to know tat the contractor has handed the keys of blk D to HDB. I managed to get a quotation from a ID and was given 2 options but in hard copy. If i've the time, i'll scan or type and post it.
  8. tat's wat i've heard. anyone staying near our block can clarify this?? Think i must make a trip down one of these days to check with the tenants nearby.
  9. Our block... no link.. i heard from a resident there.
  10. anyone heard of the suicidal case yesterday at one of the block!
  11. Hi, my friend took the keys to her new flat, produce her ROM cert only a year later. She keep giving excuse to HDB that she can't find an auspicious date to customery. So within a year should be fine. Hi, anyone has any idea on HLE? Do we have to apply ourselves or upon receiving of letter for key collection from HDB but wouldn't this be too late as they need time to approve.
  12. Hi Hi, may I know wat is the PCD (Prob Completion Date)? Like maybe 2nd Qtr but you got the keys earlier which is in mar. So tat I can have an idea and it will not clash with my wedding. TIA!
×