All items mentioned above were purchased.
-
Agreed. He knows what he needs to do if the trunking is ugly.
-
Today the re-wiring will finish. Tomorrow will be cornice and it is about 2-3 days job. Tink by this weekend, painting will start also
-
The washing machine is more to the left. Measurement taken and still got space; no problem to open the rubbish chute. Yes, our home will paint in light colour.
-
Kitchen sink Kitchen sink tap There were some other items not pictured.
-
Sanitarywares we have bought and delivered. We have bought it from Heritage. For both toilet MBR Vanity sink MBR Vanity sink tap
-
Aircon installed last Friday. Workmanship is and thks Yeak assistance. Compressor in MBR and Yeak will box it up. Aircon trunking on ceiling. The ceiling will be cover. Blower in my daughter's room. Overall, we are happy with their works.
-
Our new study room [ MBR, bedroom 2 and 3
-
Plastering has completed. It make the whole house looked bright and spacious. Below are pictures taken after plastering completed Living Room 1 and Dining Room Living room 2 and rooms walkway
-
Foyer view from Living Room 2 Finally MBR walls were up. Can see the new layout of the MBR The W/M base.
-
Picture Update Pictures before plastering Close look on foyer floor tiles Foyer walkway to Living Room (View from main door)
-
No, it is the foyer floor tile. The surface is like wood grain texture. ya, we are going to put a water feature and some plants at the foyer.
-
Floor Skirting To save $$, we used tile as skirting.
-
Thanks. All tiles selected are ok except the foyer. We didn't expect it to be so uneven
-
Hopefully can update more picture this weekend when all the debris are clear. Hope to see a neat house after plastering. The sanitarywares will deliver this Saturday and air con next Friday
-
After tiling, next will be plastering liao. Now the walls and ceiling are full of holes. It will take at least a few days to plaster whole house.
-
Kitchen My big storeroom
-
After disappearing for coupling weeks. now to update some photos:- MBR toilet Common toilet window Foyer wall feature
-
our tiling is after ur commencing on 23/11. i believe ur hacking was done earlier
-
A Simple House For A Simple Couple In Old Airport Road
upnorth replied to Chinchye's topic in Reno t-Blog Chat
ya, agree with you. For my house, he said it need 5 days to hack and clear. Who know, it only took 3 days to hack and clear. Somemore, we have so many walls to hack. -
Kitchen Cabinet- Dun know which one but will match the kitchen wall tile when up. due to poor techni in taking picture, the laminates look like same colour but in actual the left is more to off-white colour. MBR Children Room
-
went to laminate company to see the laminates that we have selected. In the end, we re-selected all the laminates. Below are the laminate selected:- Living hall wall feature Shoe cabinet & low cabinet at dining area
-
actually 7 walls to take down. that way, hdb technical officer has to go down to our place to assess the walls before he approve. luckily it approved. if not
-
We are tearing down the whole house . all windows change including the toilets.
-
Toilet The hacking progress very . Monday they will start to hack down those walls as HDB has just given their approval today Hurray!!