Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

powder blue

Members
  • Content Count

    57
  • Joined

  • Last visited

Everything posted by powder blue

  1. Hi does anyone know where to buy metal netting , thinking of DIY screen that will keep out insects and rats.
  2. Hi I'm also thinking of making the insect screen, can you let me know which company did you engage and how much did it cost. Thanks
  3. Hi I wonder if any baking shifu can share their recipe for crispy thin pizza dough? Tried so many recipes but none like the ones we eat outside.
  4. my master bathroom has no window but we made lourve windows above the door, added a wall fan and a ventilating fan on the false ceiling that is vented to the outside. Moved in for 2 months already still ok.
  5. Just sold my condo, it's 1 % to obtain option to purchase and 4% to exercise option 14 days later
  6. Hi just want to ask for any feedback on this company, Imperial Stones, that does granite top. They are offering $65 per foot run for granite top.
  7. Any feedback on Imperial Stones Pte Ltd? They are offering Granite top at $65 per ft run, but not sure of their quality, so I would like to ask if anyone have done their counter top with them. Thanks
  8. We paid $2000 for ours and took them a few weeks to come out with the drawings. That's only the beginning of fees that you will have to pay like submission to URA, BCA, Architect, engineer, Clerk of works, builder, ID etc not to mention the preliminaries before work to start like notice board, boarding up the premise, temp toilet, temp electricity etc.
  9. the surveyor only survey the boundaries to make sure they are correct, the level of the ground,house dimension, i didn't do soil test as we paid our neighbour to share his result of his soil test. It will be good to get all the paper work done and approved b4 sale completion that will save you time. I find the contractors and builders are all very busy ,they may promse you 6 months but you have to be prepared for delays.
  10. Where can I buy Maclaire or Johnson S toilet bowls? Any comment on Baron or Saniton toilet bowls
  11. Looks like you want alot to be done, don't think 6 mths is possible, as getting the plans out and approval might take quite a few months, my A and A took more than 9mths and still didn't get approved, in the end we gave up and just decided to change the roof and simple reno and it has been 4mths and still not completed, might need another 1 to 2 mths b4 we can shift in.
  12. Hi I am deciding between Fujioh 800MK2 and FX900, will appreciate any feedback on either of the models. Thanks
  13. Hi just want to find out if anyone used Hup Gay Civil engineering to rebuild their house. Was considering letting him rebuild my house since my A and A is not approved.
  14. Hi does the vinyl flooring feel sticky when walking on it? Thanks
  15. Hi may I know what brand of vinyl flooring did you lay and how much do they cost? I love the flooring in your rooms. Any comments on your vinyl flooring? Thanks
  16. In my opinion I think they are the cause of the delay, but they will justify their delay as having to do calculations, etc ,etc. But some of my friends said that it is good to spend more time in the planning then to rush thro it and then when it is build, then to find things don't turn out as well as expected.
  17. I can hear it as i leave my window and sliding door open as the rain doesn't get in. But this roof which I'm going to replace is rather old.
  18. Roof tile insulate heat better , metal roof is noisy when it rains, hence changing all my metal roof to tile.
  19. We have been planning our A and A since feb, only got URA approval in early sept, Enginner took 2 weeks to apply and BCA replied by end of sept with some queries, engineer took another month to resubmit now have been waiting for BCA more than a week already. I think it's easier to get approvals for rebulid then for A and A, that's why many builders would rather do rebuild than A and A. We almost throw in the towel last week and told the architect if the engineer still doesn't resubmit we will abandon the whole project, and he submited that afternoon! Doing A and A is such a test of patience., sigh
  20. Any feedback on using vinyl floor tiles in the house?
  21. Like the wood-like tiles in your foyer. Could you let me know where did you get them and how much are they? thanks
×