nobody
Members-
Content Count
129 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout nobody
-
Rank
Gold Member
Previous Fields
-
Renovator Engaged
-
-
Gender
Male
-
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Overlaying tiles require bonding agent. If whole unit it total hack , tat will depend % of cement and % of sand. I may be wrong. -
Cabinet not ready not aproblem. As long all reno works complete can let human stay then no issue. I also shift in without kitchen sliding door not ready and other minor things , Bo bian Buyer for the old flat chasing liao .
-
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
It depends. If sand more than cements it will also result in hollow tiles or only cement on the perimeter(side) of the tiles also can result hollow tiles too. -
How To Maintain Marble Tiles?
nobody replied to goodman123's topic in Ceiling, Walls and Flooring Works
Hi, Wow the shine should be kim kim . Ok can use Stone care lab from Homefix or Terra care from NTUC. if warm water will also do the job. If care is taken think 10yrs shine no problem. Enjoy yr very Class flooring. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Polish Homo tiles ? Unless it is scratches or change in color. Wax should not be remove as it serve as a protection on new tiles. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Min kicking effect , leveling -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Ya this I agreed. My friend is an ID from 1 big player in SG. According to him that good tiler usually booked by Big Player. Tat y my tiler need to book 1.5 month in advance. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
it depend on ID or the main con whether he willing to pay more a get a good tiler as it will eat into his cost. My tiler is a local 50+ uncle with superb skill. When Lian Hin ppl came to remove some of the hairline scratches of the granite flooring , they can't believe the super b workmanship. They told me they have not seem such a good workmanship for so long. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Thanks you at least I admit. Haiz not like some ppl. -
D'amour ~ A Home With Peace,love ,happiness And Good Blessing.
nobody replied to doremon2009's topic in Reno t-Blog Chat
Like wat u said not on lowest price but yr pricing still abit not fair. My friend also alot of carpentry. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Thanks for the understanding as well. Of cos i will no worries as I had mention earlier reporting to media or go by legal means as a way to push Ah soon. Not like ppl show how much he can save. Anyway I will stop all these as to some people think he will be always the winner , jus let it be. No problem or disgrace , at least I am willing to be a loser. . -
D'amour ~ A Home With Peace,love ,happiness And Good Blessing.
nobody replied to doremon2009's topic in Reno t-Blog Chat
My friend bought an resale EA. Whole unit complete overhaul . From 1 ID company , he got more stuff than you, hack here hack there , shift the wall here shift wall there. Even toilet also false ceiling. Include electrical installation coming to 43K . IMO yr quote is already on the high side esp yr is new flat i suppose. -
Ah Soon
nobody replied to juz_me's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Ok sorry lor . Ya I agreed I am a loser cos i did not manage to save jus tat a few Ks not 10K tat y stay HDB lor but at least done up by a reputable company. I envy you cos u are a winner can save 10k can stay condo ..... got it ..... hoho -
My 0.01 cents suggestion
-
My HO complete in 6 weeks. Including all bedroom and storeroom all granite take 2 weeks to complete . Done by a local uncle take his time to lay the tile so during the 2 weeks no other reno is being done as he dun like to be disturb.