Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

kellogs

Members
  • Content Count

    104
  • Joined

  • Last visited

Everything posted by kellogs

  1. Hello, If you are hiring an architect, please make sure the deliverable is properly stated and timeline. Please make sure if your builder required autocad files your architects allow you to buy on behalf and able to release the autocad file to you. costs of rebuild is very hard to determine without looking what materials but please open eye big big if they are quoting you M&E like 700K even 500K! I had one quoted 800K in the tender! You might want to make sure your builder is a responsible person too.
  2. Anyone know if on level 2 would it be ok to have 1meter abutting wall from building line for fire safety purpose in case neighbour unit level 2 on fire?
  3. goto Alibaba or Taobao and find the supplier there ...you might be able to save some money. Always read the reviews and videos of the items before making purchase
  4. I think i am going with the same routes as well. Importing tiles, door, windows and glass directly from china and fit into a 20ft container.
  5. congrats! what is the land size? I am planning to rebuild a corner terrace as well.
  6. This is a working LG 55" (139cm) Full HD 3D LED LCD TV http://www.lg.com/au/tvs/lg-55LM6700-lcd-tv No Warranty and it is sold as is. (TV and remote control) Selling because of upgrading. SGD 1000 Cash and Carry 977 101 67
  7. Hi William, Did you manage to get a contractor to do this? If you did ... could you share your contact with me please? Thanks!
  8. Hi Stanley ... did your contractor apply the permission with URA?
  9. Dear members, I have got approval to build a 4 meter roof on my open terrace but it appears I need to apply permission from URA for anything more than 2M in length. May I know if any one has experience on this in regards with applying permit with URA? Where do i hire qualified person for the submission? Thanks!
  10. Maybe we can do a renotalk telok kurau BBQ
  11. Dear Members, If you know a reliable engineer or contractor whom can help me replace the wall with a glass please let me know the contact. Thanks Much!
  12. Hi HayateEin, Why not make a trip to the EL showroom and talk with Donovan? 5 Harper road http://www.el.com.sg/index.php?option=com_contact&view=contact&id=1 I am sure Donovan would be able to recommend something which matches your budget. I have bought 3 sensor recliners, with a theather box and with 1 long sofa and now watching 3D movies at home is never the same!
  13. Hi Just4fun My delivery was very good the product matches what i have paid for. I have been wanting to write a full review but has been busy ... this weekend I am going to snap some pictures post on this thread. executive summary: solid buying experience with EL including the products they delivered !!!! I hope that those not buying from EL nor EL existing customer - just stay away from this thread instead of messing with people business. If your product is better than EL and price is decent, why not start your own business thread?
  14. All the items which I bought from EL are slated to be delivered the upcoming weekend ... I am excited!!!
  15. That is awesome with a glass of single malt
  16. Hi, I have a buddy whom is running a furniture export/import in China - Guangzhou and he offered to send me the items using container all the way to Singapore - sea. It is cheap but due to busy schedule and unable to make a trip there, I have decided to support local business. If you have time and able to go onsite to see the items, it is worthwhile but if your charge out rate is higher from the saving, I would recommend that you support local business and drive the economy Cheers Kellogs
  17. that is correct ... those whom bought into this MM does not understand the real size of these units till it is TOP ... Once they got the key and open up the door ... the reality would sat it and by then it would be too late. good luck
  18. govt should bans all these MM units ... Singapore should not be made into another HK
  19. I have bought my recliners from Executing Living www.el.com.sg and I have to say it is damm comfortable! ... spent abt 4K on the L shaped ... no regret
  20. Hi Just4fun, So far I have received good service from Alvin, Kevin and Patsy. I am looking forward when the items are delivered and setup. Our unit is being renovated at the moment When is your delivery date?
  21. It seems like our unit is going to be decked out all on Executive Living items. So far we have purchased the following: 1. L shape recliner Sofa set 2. 1 Dining Table 3. 6 Dining Chair 4. 1 Coffee Table 5. 1 Carpet 6. our whole house wallpaper (EL has beautiful Korean wallpaper) 7. 1 queen divan Items would be delivered around May time and once everything has been setup nicely, I would take pictures and share with the members here Stay Tuned!
×