Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

MTlot

Members
  • Content Count

    114
  • Joined

  • Last visited

Everything posted by MTlot

  1. Thanks bro, at least now i know he din made much from my kitchen
  2. Definately not pierre acrylic panels = sounds like a good idea and an upcoming DIY project. Thanks bro.
  3. That incoming water supply to my unit above does not look good. I wanted to conceal it but according to my contractor HDB dun allow this lah that lah... so have to bear with the pipe. Anyone knows what to do with piece of pipe??
  4. This week will be plastering works. Toilets and basins will arrive today. Currently still sourcing for window film contractor or someone to do up the windows.
  5. Bro, Thanks will check out 3M website.
  6. If not wrong tiles at $3.00 - $3.20 is already above average type.
  7. My reno too was a major overhaul. Imagine 20years flat in almost original condition, everything must go kinda flat. With a tight budget and manage to get a contractor's quote of 25k rather than those >35k from ID's. Bad point is every now and then need to coordinate and tell the contractor what I want , best point is I save 10K. So all and all depends if you want to " spend " and let others do the tiring work for you or " save " and do the tiring work yourself.
  8. possible to pass me contact by PM? PMed you.
  9. Hi Zhiz, Can you send me the list, I sort of kaypoh a bit, need to know how much my contractor made from my reno. He keep complaining $$$ very low already no further discount lah blah blah...
  10. You need shipping contacts?? Or ?? If shipping contacts I have a fren who owns a shipping CO but not sure if he can help you.
  11. I don't think have "those that can see out but cannot see in regardless of light in the room" kinda films. I've ask around most to most I've got is the " solar films and those that can't see in only if there is no light inside " only ( was quoted ard $3psf ). If you have the contact pls PM me.
  12. My contractor did ask me if I wanted this type of window. But when I heard my master alone can cost beyond $500 already out of my budget.
  13. Update on the Reno works. This week both toilets and kitchen tiles.
  14. Do you want to try my contractor?? I can PM you his contacts. Get a quote from him to compare with others.
  15. Factory price inclusive of labour to install?? or just the items only??
  16. I have a friend, maybe he can help. PM me for his contacts if intrested.
  17. Yeah, he's a contractor and not ID so no 3D drawings. All depends on me for the ideas and he'll do his best to match what i want. So mething good bou't this guy is he will give a lot of suggestion too be it on the cost saving side or on the reno works. For the tiles he bought us to the warehouse to get the tiles and he have a lot of ideas but beyond my budget. I get to choose the tiles but i give him freedom to do both my toilets. I'll go take some pics later and post here.
  18. ossify, why 49ft of walls?? Don't really understand?
  19. Yeah, just met up with contractor and he did mention bou't the wall ( not just the master wall , all walls ). He did assured me he will try the best to cover up everything. We'll have to wait to see the outcome.
  20. I suppose so.Now see budget if enough then do, not enough then put the bed there and save cost.
  21. Nope from contractor, that is what he quoted me. Mine is hack whole hse no walls. What i believe is there is always a price difference when we breakdown our quotation i.e contractor A might be cheaper in hacking works but carpentry works expensive and on the other hand contractor B charge more on the hacking works but carpentry cheaper a lot. So it still depends on what is our priorities before signing on the dotted line. At the end, I believe all of us still want to see workmanship quality.
  22. Depends on length i guess. For me I'm using 10ft stainless steel. 1)Tiles - included in your reno quotation. 2)Glass - tempered , additional cost ( usually not included in quotation and expensive for tempered glass ) 3)Stainless Steel - additional cost ( usually cheaper due to different grades ) Above explaination is advise from my contractor. For maintenance wise, I'm not too sure for no 1 and 2 as I've never used before. For no 3 currently using at my in law's hse so far quite easy to wipe off any oil stains after cooking.
  23. DEMOLITION WORKS To supply labour to hack whole house wall & floor tiles incl skirting To supply labour to hack existing sink & stove support To supply labour to dismantle bathroom & kitchen fittings To supply labour to dismantle kitchen cabinet $ 3,050.00 My contractor quoted me lump sum as above for my 4rm. This should give you a rough guide on the market rate for the demolition works.
  24. At last, 1st day of hacking in progress. Genaral view of progress Master bedroom Kitchen
  25. hi Zhiz,\ not very sure is on the high side though but all together was quoted 25k after discount.
×