All jobs done within 2months except for some minor rectifications. So far can say "stastified" with the transformation. Tested my DIY network point and considerd useable. Some pics to update the reno works Dining Area MBR Toilet Living Area
-
Kaki Bukit Rd 3, if not wrong somewhere near Empire Technocentre the industrial area there have a unit selling a lot of doors just beside the main road.
-
Just installed yesterday. Not fully moved in yet so did not really try out the hood yet.
-
I too juz installed my fx900 today. Did you try ur unit yet?
-
Usually IMM those shops got carry their product.
-
Maybe i bought a lot of stuff from him, that's why he gave me this price. At first he quoted 240 for the 25L , I counter offer him if same price for the 35L I'll take without consideration. He took about 5mins and some calculations before he can confirm the deal. So I presume it's a goodwill offer since I bought ard 2K+ worth of items from him. You can try and see if he can give you special offer, I'll PM you his place.
-
My contractor provide the installation.
-
YUP, thats what you need to punch in the cable and if you thought of buying it DON'T,can use a normal testpen to insert the wires. Follow instructions on the keystone label will do. Need any help let me know.
-
Did my own CAT6 termination on weekends. Checked and tested with cable tester, so far so good for a first timer. Borowed tools Faceplate bought at SLT Termination done by me. Finish :D
-
Confirm Joven. I'm was quoted 240 for 25L and 35L for 280 at some places. End up buying the 35L @ 240 at the place my contractor recomended.
-
So far so good due to most of the coordination I do myself. Workmanship for tiles seems OK but maybe it's still dirty and I can't seems to see clearly, need to do final inspection after cleaning. Woodworks I've no comments, cabinets have not come yet as of today. Appointment with HDB officer and Town Council on Monday, seems like the rubbish chute area is leaking, the Town Council sent their contractor on the very same day to inject the wall with sealant. My contractor will monitor for me the situation. Keep my fingers crossed. How's your network point plan? Need any help let me know.
-
I've just installed the solar film, for my 4rm, all windows except kitchen. I do agree with Batman it's the " x " amount of time and the amount paid( justified ). Even for cars they provide lifetime warranty but after 3-4years you can notice the colour starts to fade.
-
Just finish window film today. Op for the black 10% with mirror finish. For 4rm total of 4x large panes and 10x smaller panes $700 Mirror effect After effect They do carry privacy film but a bit ex for me. Got sample to see also. Before After
-
Bro, where can i get that.?? and If now got water dripping drop by drop, can seal or not??
-
Less than 10 more days to dateline. Balance of : Doors Fittings Lightings Piping Hot and Cold Kitchen Cabinet And the most important thing is the leaking ceiling, have to wait till HDB techinical officer visit on Monday then only know the outcome.
-
But my water proofing cannot be till ceiling rite, my contractor only give me till 3ft above ground level. :unsure:
-
I'll talk to my contractor later.
-
I know, i'm ****ed up big time. I'm chasing for handover in another 1week+ and then this problem come into the picture. Sienz half already.
-
Just asking coz this is my 1st home, HDB settle or the neighbour above settle this leaking problem?? Can't do my ceiling last, coz last week just finish plastering the whole unit. Can consider 80% finish, and now leaking problem.
-
Today went over to see the progress and to my suprise upstairs neighbour kitchen side wall near water outlet got water mark.. Juz called my contractor, have to go down with him to discuss about the problem.
-
Need some advise on the above situation. Before reno did not notice due to white walls with white caramic tiles and furthermore it's boxed up by previous owner. Now that I've decided with the natural look, I've notice water seepage mark and worried about the cabinet that I'm going to install. :help: kitchen MBR also have but not too obvious. Anyone can advise??? :help:
-
I'm using bank's reno loan and banks need HDB approve contractor before approving any loan.
-
Plastering works just started , quite stastified with the results. Much better to look at from the original state.
-
ADDITIONAL DEMOLITION & WET WORKS Erect half height wall with hollow blocks in kitchen for L shaped kitchen cabinets $150.00 This item can ask them to waive off should be able too. And then to save some cost if budget a bit tight change the doors to classic should be able to cut 40% off the price. Just 2cents opinion.