Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Teddy Seah

Members
  • Content Count

    13
  • Joined

  • Last visited

Everything posted by Teddy Seah

  1. How i wish my new house like your...... Can i visit your house tomorrow as i will be at that area??? Uncle Soon came my house last wed to talk about quotation as well as Alan and ask me must go your house to see see.... He himself is very happy with the work done at your house.... If can, can u PM me your address??? as well as time to visit???
  2. i ok with it... all the stuff include 1st & 2nd storey.... some of the stuff are in good price but most of them are not......
  3. That's a study table with cabinet in the studyroom (utility room)...
  4. Is this quotation reasonable??? 1 Supply & lay Homo floor tiles in second storey (680). $3,740.00 2 Hack second storey existing floor tiles $500.00 3 Supply & lay master bedroom toilet wall tiles $1,485.00 4 Supply & lay master bedroom toilet floor tiles $400.00 5 Supply & install long bath in master bedroom toilet $200.00 6 Supply & construct hollow block for long bath $400.00 7 Supply labour to install two toilet sitting bowl $160.00 8 Supply labour to install two toilet wash basin $100.00 9 Supply & lay bath 2 wall tiles $1,500.00 10 Supply & lay bath 2 floor tiles $400.00 11 Supply install two toilet glass swing doors. $760.00 12 Supply & install wrought iron gate $400.00 13 Supply & labour to hack 2 toilet ,kitchen, wall & living floor tiles $1,400.00 14 Supply& labour clear all debris $1,600.00 15 Supply & install 2 toilet & kitchen stainless steel pipe $1,400.00 16 Re-wiring whole house $2,400.00 17 Supply & construct cabinet base $300.00 18 Supply & install laminate kitchen cabinet (20) $4,000.00 19 Supply & lay kitchen floor tiles $900.00 20 Supply & lay kitchen ceramic wall tiles (342) $1,881.00 21 Supply & lay Homo tiles in living ,dining hall & utility. $3,300.00 22 Supply & lay balcony floor tiles $550.00 23 Painting $1,600.00 24 Supply & install fixed panel tempered glass in between kitchen & dining hall.(10mm thk) $1,819.00 25 Supply & install glass swing door in kitchen entrance. $380.00 26 Relocate pvc pipe for toilet bowl in second floor toilet. $400.00 27 Supply & install five number door frame. $700.00 28 Supply & install four number vinner doors. $800.00 29 Supply & install main door. $400.00 30 Supply & construct hollow block in access balcony for main door. $400.00 31 Supply & install half height shoe cabinet 7 ft $910.00 32 Supply & install cabinet for utility room.(20 ft) $2,000.00 33 Supply & install master bedroom & bath room two shower screen. $900.00 34 Supply & install wardrobe in master bedroom (8 ft). $1,920.00 35 Supply & install wardrobe in bedroom three (8 ft). $1,920.00 36 Supply & install wardrobe in bedroom two (7 ft). $1,680.00 37 Supply & lay Homo tiles at stair case leading to second level (20 steps). $1,000.00 38 Railing with wooden top (std ht: < 36") 30 ft run $2,000.00 39 Supply & install sliding window white powder coating clear glass (256). $3,700.00 40 Supply & install casement window in kitchen (24). $424.00 41 Supply & install whole house window grill white powder coating. $2,546.00 42 Supply & install window louver in bath 1, bath 2, wash area & utility area. $560.00 43 Supply & install polycarbonate roofing (100 sq). $2,500.00 44 Supply & install kitchen cabinet with 3 pcs of black galaxy top.$1,500.00 45 Supply & install TV Console plus future wall in living hall.(5 ft)$750.00 46 Supply & install TV console & future wall in master bedroom (5ft). $750.00 47 Supply & install two bed side tables (2 sets) $600.00 48 Supply & install two solid surface vanity tops & suspended cabinet. $800.00 49 Supply & install two mirror (4 X 6). $400.00 50 Supply & install full height storage cabinet in balcony $600.00 51 Supply & install false ceiling $1,500.00 52 Supply labour to install 18 no lighting point. $700.00 53 Supply & install simple cornice in 3 bedroom + utility. $400.00 54 Supply & install stainless steel debris chute. $150.00 55 Supply & install bar counter (4 ft). $600.00 56 Supply & install L Box in living & dining hall ($1500) TOTAL $65,085.00
  5. Hi Bro, Can PM me the supplier's contact and address. By the way, the ceiling fan you have is without lights. Do you know how much is the one with lights + installation + remote? Thanks.
  6. Any fellow EM owners care to recommend good, reliable and not very exp contractors to me??? Looking for a completely make over for my resale EM with access area bought..... Condition of the EM is totally running down and not very high floor but the location is good... very excited looking forward for the renovation and the end result.... Is a major renovation.... Location at Bukit Batok.... Thanks.... Teddy's Family
  7. Is a major renovation..... Location at bukit batok....
  8. Any fellow EM owners care to recommend good, reliable and not very exp contractors to me??? Looking to make a completely make over for my resale EM with access area bought..... Condition of the EM is totally running down and not very high low but the location is good... very excited looking forward for the renovation and at the end result.... Thanks.... Teddy's Family
  9. Theme- BLACK AND WHITE, MODERN AND SIMPLE Things should be done:- A) Common Items 1 Re-wiring for whole house c/w new switches , socket outlets , SCV points and Tel points 2 Replace copper piping for whole house (Cold) 3 Re-painting of whole house using ICI paint 4 Chemical Wash of whole house 5 Supply labour for installation of lighting, WC, wash basin, ceiling fans and misc 6 Supply & installation of window & grill for whole house 7 To provide haulage and clear debris from site 8 To plaster the wall if necessary B) Recess Area 1 Hacking off the existing floor tiles 2 Remove existing main gate 3 Supply & lay heavy duty gross homogeneous/ marble floor tile 4 Design & construct hanging shoe cabinet 5 Supply & installation of Main gate 6 Supply & installation of fire proof main door C) Hall/Living/Dining Area 1 Hacking off the existing floor tiles ****/dining area 2 Supply & lay heavy duty gross homogeneous/ marble floor tile 3 Design & construct TV Console with feature wall 4 Design & construct 6" EOS Fish tank with full height display cabinet near dining area D) Balcony 1 Hacking off the existing floor tiles 2 Leveling the floor 3 Supply & lay heavy duty gross homogeneous/ marble floor tile 4 Design & construct full height of built in cabinet at the side 5 Supply & installation of temper glass sliding door E) Staircase 1 Hacking off the existing floor tiles 2 Supply & lay heavy duty gross homogeneous/ marble floor tile 3 Remove existing railing 4 Supply & installation of railing F) Kitchen 1 Hacking off the existing floor tiles & wall tiles 2 Remove existing kitchen cabinet, rubbish chute 3 Construct base for kitchen cabinet, fridge, washing machine 4 Apply Waterproofing 5 Supply & lay non-slip homogeneous floor tiles 6 Supply & lay wall tiles till ceiling high 7 Design & construct Kitchen Cabinet (L Shape)- Top and Bottom (with anti-slam mechanism) 8 Supply & installation of solid surface/ Granite for kitchen worktop area (L shape) 9 Supply & installation of stainless steel rubbish chute (flush to wall) 10 Install 1 set stainless steel Dish drainer 11 Supply & installation of temper glass sliding door G) Master Bedroom 1 Hacking off the existing floor tiles 2 Supply & lay heavy duty gross homogeneous/ marble floor tile 3 Remove existing built in wardrobe 4 Design & construct walk in wardrobe integrated with TV Console 5 Supply & installation of naytoh door & door frame with lock-set/ stopper finishing H) Bedroom 2 (Children Room) 1 Hacking off the existing floor tiles 2 Supply & lay heavy duty gross homogeneous/ marble floor tile 3 Remove existing built in wardrobe 4 Design & construct built in wardrobe 5 Supply & installation of naytoh door & door frame with lock-set/ stopper finishing I) Bedroom 3 (Guest Room) 1 Hacking off the existing floor tiles 2 Supply & lay heavy duty gross homogeneous/ marble floor tile 3 Remove existing built in wardrobe 4 Design & construct built in wardrobe 5 Supply & installation of naytoh door & door frame with lock-set/ stopper finishing J) Utility room (Study Room) 1 Hacking off the existing floor tiles 2 Supply & lay heavy duty gross homogeneous floor/ marble floor tile 3 Design & construct built in top cabinet & fold-able study table 4 Supply & installation of naytoh door & door frame with lock-set/ stopper finishing K) Toilets (Master & Common & Wash area) 1 Hacking of the existing floor tiles & wall tiles 2 Remove existing WC 3 Supply & lay non-slip homogeneous floor tiles 4 Supply & lay wall tiles till ceiling height 5 Design & construct top cabinet 6 Design & construct Solid surface/ Granite Vanity top with cabinet at the bottom 7 Supply & installation of tempered shower screen/ Half height Wall divider (subject to space) 8 Apply Waterproofing 9 Supply & installation of temper glass sliding door 10 Supply & installation for Louvre windows with wire glass panels 11 Install Bathtub at Master bedroom toilet 12 Installation of ventilation fan at toilet
  10. Presently, under going to purchase an EM at bukit batok with access area..... Need to find out how much to fully renovation an EM which is totally run down.... Need to tear down everything and redo.... Like flooring, windows, toilet, kitchen, gate, door, rewiring and etc.... And lastly, any good, reliable and budget id/ contractors to recommend???
×