Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

freddyprince

Members
  • Content Count

    344
  • Joined

  • Last visited

Everything posted by freddyprince

  1. my carpentry olso dunno firm one anot.say friday. high chances of njd my parents hse will hand over aug 13 so before that i got to go in le.
  2. me left with carpentry ganite top 5x veneer door 2 bi fold door 1 glass sliding door electrical stuffs false ceiling L box mbr toilet bowl both toilet pipe boxing up tiling for boxing up painting wah urs sept i tink mine sure gone case le. got to slp hotel how long sia like that? garbage shoot cover
  3. u left with carpentry and painting right? i tink urs will be faster
  4. i tink i call him olso no use now, becuase cabinet not ready yet, he cant ask ppl come and take measurenment olso.
  5. granite top ordering 2weeks.. i am going to faintz le..
  6. btw got picture of ya granite top mah? really excited to see the end product leh,and how long you waited for the granite top to arrive after capentry is completed.
  7. dunno leh,mine oni kitchen cabinet only.they will paste the laminate in thier factory or over at my place? wah.. really hope my ceiling work dun play me aeroplane tomolo leh... pray for me guys...
  8. hmm from my understanding joseph is olso the sub con for ah soon false ceiling work, meaning to say he works for ah soon as well as his ah soon sub contracter for false ceiling. i just phone ah di , he say now still frabricating, friday loose piece shd be up at my hse, but he say can be done on the actual day to fix up, do you tink its possible?
  9. ivy, BD wan to ask you huh? the false ceiling and Lbox etc at you guys hse olso done by joseph group of ppl right? he say mine will start tomolo, dunno will start anot leh. then the carpenter mr liew, i still dun see him olso leh.could it be still frabricating at the factory?
  10. thks ivy..so yours fully settled le mah? BD, how? any job done todae?
  11. haiz.. bo bian lor.. ming tian hui gen hao..
  12. ya i understand, but at least let me know he cant make it mah.
  13. no idea olso.. i tink they will fabricate le then come down fix up bah..
  14. ya comfirm liao, mine will do L box and false ceiling 1st then paint. **** fustrasting, last week sat ah soon say everything will start on today (false ceiling and kitchen cabinet etc) so i purposely take leave so i can be there to coordinate what i want as i dun wan double job, then morning about 10plus 11 i send me daughter to infant care then i fone ah soon, i ask him what time is he and the ppl coming down, he replied me 1pm. then i was tinking since i am aready at yishun i might as well hang around there walk walk and have lunch. then 1p, i fone him where is he, he say he will be here only at 3pm. then i sian half liao lor because i know even if he come down olso NJD liao. but still i tink i better wait for him and discuss with him what i exactly want mah. at 3pm i still dun see him and i keeping bombing his hp, until 4pm he finally pick up the call and BEST PART. he say he cant come down now.i was so fustrated i told him off thru the phone and hang up.then 5min later joseph aka bo gay phone up my wife say he will come down in 20mins time. then i met him and we discuss on the false ceiling etc and he took measurenment. and he say wed will start work... faintz... such a long day waiting and waiting after that we go straight to infant care to pick our baby ...
  15. amk market hawker center beside blk 338 has a famous bak kut teh stall
  16. anione know where to get simple or modern looking altar table? prefer simple design, maybe just a high top table with one drawer.
  17. your left with what huh? actually hor i tprefer paint le then do L box then top corners olso covered mah..hehe
  18. hmm.. i expect NJD tomolo olso lah, but normally false ceiling and L box need how many days? can painting be done before installing Lbox etc? my wall system ppl say they will come up on friday to fix up le.so at least i would want my painting and carpentry to be done by this week bah. I tink i will start to LOAD Missile to BOMB him again
  19. i olso bought a sofa there like what wakzool has , but black color. see alot of furniture there that i like but cannot buy. because my parents got to shift over my place for 1mth plus while waiting for 2nd appt. then they have to bring thier furniture along.
  20. guys, u all got get anithing from nova furniture? went there this afternoon, all their bed frame 50% before 6pm leh. and i saw alot of nice sofa on discount price olso.
  21. initially he though that we arrange with ah soon that those ppl who do false ceiling to box up, then ah soon talk to him to use carpentry box up .
  22. i intend to remove the aircon casing and spray color
  23. after plaster, see liao olso happy hehe, NO MORE ROCK STONE
×