  1. Even have time, must also know how to coordinate all the works.
  2. I think he looking for package that give free air-con, lighting, etc...those u can see in every sat ST classified section for renovation.
  3. To other forumers, pls do not send me any more PM asking for quotation as I already full of projects till end of sept. I'll not be taking anymore projects till after that. Regardless u r rich or poor, doing more or less, to me all are equal, its 1st come, 1st serve. To ID/contractor, dont bother to pose as hse owner to ask me for a quote just to keep me busy. Cos if I do found out.....heeheehee. To my friends, pls do not set up a club for me. I prefer to keep as low profile as possible. Thks. I'm still prefer to advise in this forum rather than advertise or sell my service. I want to use more time to concentrate on doing my current and future confirmed projects than neglected them. I have my own principal of view towards business, if you are good, words of mouth will help you spread ard, if you are bad so will ppl spread for u. I been here for so long, and so is being in the trade. There reasons for me able to survive without doing forumers job.
  4. To other forumers, pls do not send me any more PM asking for quotation as I already full of projects till end of sept. I'll not be taking anymore projects till after that. Regardless u r rich or poor, doing more or less, to me all are equal, its 1st come, 1st serve. To ID/contractor, dont bother to pose as hse owner to ask me for a quote just to keep me busy. Cos if I do found out.....heeheehee. To my friends, pls do not set up a club for me. I prefer to keep as low profile as possible. Thks. I'm still prefer to advise in this forum rather than advertise or sell my service. I want to use more time to concentrate on doing my current and future confirmed projects than neglected them. I have my own principal of view towards business, if you are good, words of mouth will help you spread ard, if you are bad so will ppl spread for u. I been here for so long, and so is being in the trade. There reasons for me able to survive without doing forumers job.
  5. This few days there will be no works done. Next week will up your air-con, still waiting for the time slot. Measurement of carpentry work and also installation of your vinyl flooring on monday. Tomorrow will complete your floor tiling work, and also continue of your plumbling works. Today the window grille came to install but they do took the wrong design so ask them bring back. Your master bath sliding glass door had installed. So your see, after monday, is all waiting for the carpentry work to be up. But during the waiting time, painter will come in to paint your whole hse. And the last part will be the installation of the carpentry work....then I HO to u. Next week you will see me running your site again. This few weeks, Alex and Keith are at your site doing the coordination and monitor the progress.
  6. The end part of the cornice is not inside the quote, although u didn't request for it, but I feel its not nice to left out that part, so I ask my ceiling guys to complete it up for u, of course is FOC.
  7. Don't worry, reno must do it slowly then will see good results.
  8. Start with your floor plan and your ideas on what u intend to do. Doing false ceiling in the bath will cost much more than doing it in the bedrooms or living. The material for the bathroom is totally different and also there must have a manhole at the false ceiling. U can consider about it.
  9. Actually Dr. booked me before I even met u.
  10. Oh dear...need to take panadol already...
  11. More pressure means the piping using will be bigger than those standard type. Hmmm...need to charge extra liao ...got to check the spec. on the storage heater and also the spec. for the rain shower so that the pressure will be big enough.
  12. Rain shower...hmm...need to note it down
  13. Can't at all, cos quotation already signed b4 starting of work. Now work completed still haven collect the 50% balance yet.
  14. Maybe it was the time to coordinate and the transportation, thats why, they rather take a bigger project than to do this small project.
  15. Actually, I had completed the urgent job....but as the owner unable to coordinate the rest of the works, I will continue helping them to coordinate their sub-cons till the hse is ready. This week will be a busy week for me again.
  16. Kitchen One of the tube defective.
  17. The lighting. Although some of the lighting didn't work well, will get it change for the defective part. Common Bath Master Bath Bedroom 3 - One of the light tube defective Bedroom 2 Dining - last light tube defective
  18. There is a pull string pipe where the feature wall is. Prepare for the opennet as by the time they come to install, reno already completed long ago, so as not to see their ugly trunking running everywhere, we had planned the route for them first.
  19. New 10 downlight installed, old 16 downlight for sale....anyone? Had patched up the false ceiling in the living room also.
  20. Still remember this at the master bedroom ceiling and walls? It was all gone and patch up nicely.
  21. Yesterday the false ceiling had completed. A small L -box for the master bedroom. And the lighting was up today.
  22. This pic shown is the pressure test they do to prove to me that the gas piping that they had installed didn't leak at all. It was only on the 3rd times after tightening on all the connection piping then stop the leakage. There will be another pressure test when install the gas meter.
×