Everything posted by jaskel

  1. Material Normal cement, plastering, floor protection paper 2 different types of sand used for different purposes Another type of cement for tiles only Another type of cement for waterproofing only Quick Seal 104 for waterproofing of 2 bathrooms & kitchen flooring and upturn 100mm on walls There are different brands of cement so is not necessary that other contractors/IDs must used the one I posted. There is another bag of waterproofing material that will be use also but I will not post it here. ...if not those newbie contractor or ID will know too much info for free.
  2. Day 6 (Mon 17/05/2010) - Day 10 ~ Tiling of 2 Bathroom walls and Cement plastering of Kitchen walls Master bath Master bath Master bath Kitchen walls
  3. Day 1(Mon 10/05/2010) - Day 5 ~ Hacking and clearing of debris Common Bath Kitchen Kitchen Kitchen Master Bedroom False ceiling and Bathroom door frame
  4. Actually its 3D sketch up. Normally contractors won't be providing this to customers. Doing this as a hobby first before purchasing the real 3D software which cost thousand of bucks and also better space planning as it will give me a est. measurement.
  5. Phase 2 Design - Wardrobe (Modify)
  6. Unless u want an inspection by SP Services to certify your whole hse electrical works. And it can only be apply by LEW only.
  7. Choose something light, like shade of white and not too strong colour for your bedrooms as the flooring is already quite dark.
  8. Is that the carpenter that Ah Soon & Jason Goh used?
  9. There nothing u can do as everything had already done up less to ask for a discount only. Should know the pricing before done up in the 1st place.
  10. As for Largo range, they've just imported 5 models only. Choice maybe limited but if u like the design, it'll be well worth it.
  11. Ya...the drawings is the 1st time we met and discussed on what u want to do. Phase 2 drawings (what I proposed to u n your hubby and we discussed on modifing to both your liking and requirement) will post later... , then later follow by phase 3 drawings when the laminates, flooring will be all in.
  12. Positive and happy mindset will change the "qi" ard u and make u feel better and things will change to a better position.
×