Wet work in progress...
-
Electrical work in process...
-
Don't worry, Be Happy....Best wishes for your reno.
-
HO...ho....ho.... X'mas is coming
-
Yes...there is..price hor...
-
Quote is ready....
-
Beside casper, those who used Xiao Chen can also feedback regard is good or bad.
-
Wet works material had arrived.........
-
Oh...relax...your walls all gone.... Aiya....next time should post me taking the hammer and knock down the walls
-
Wah...U just scared me by giving such a short short notice and I was hoping that my demo guys able to make it for me cos I knew they have another job site to hack too. Think, treating the workers well all the times they can help me when I needed it urgently.
-
3k Plus To 4k For Hacking, Is This The Norm Now?!
jaskel replied to cinderella's topic in RENOVATION WORKS
Its hacking + haulage + debris fees all added together. Now levy goes up...so is the cost... -
Oh...think I under charged u... ....ppl charge $4.8k without hacking the floor, just skirting only.
-
"jaskel jaskel lean on the walls, jaskel jaskel too heavy and the walls fall"
-
During QC check, required to change ard 9 cabinet doors...3 laminate supplier faults, 1 scratched (don't know by who), 5 solid surface workers faults. So need to wait for another week before everything sui sui.. Painting touch up completed today. Lighting all up. Mon bedroom doors will be installed too. Moving really close to the end already....
-
"That the way they work, they work ah huh, and we don't like it"....."Just follow Law" hor, A said its B, B said its C, C said didn't received it and need to check with A... Better clear by mon cos that the last day of hacking....its already the 3rd times pushing them for it...I don't want to do tiling works then this approved and have to do hacking, wait the cement and tiles all drop down...then u will at me.
-
Actually, they already kana b4, their neighbor below complaint water leakage and they pay 50-50....now water leak from above, in order not to pay 50-50 again, they waited for 4-5yrs before the owner sold their unit and also take the advantage to repair all their cracks and ceiling works, moreover want me to change their cracked tiles somemore which luckily, HDB officer rejected, Tech. officer also rejected it. Hahaha...I believe in karma, whatever I pay now will in return get 10 times back from them, may it be directly or indirectly. God is fair.
-
No not yet, me got to do final QC check and any defects will ask them to redo it first before HO to u all. Can ask them to delivery and install anytime. They whack my things, I whack them hahaha....just let me know the time and date will do. Today citygas came and install your meter and connect the hob already....now I can cook some proper meal at your place
-
Enlighten u in private...
-
Not only hse owners face some hiccups during reno, contractor/ID also will face it sometimes if not most of the times. Don't worry, Be happy
-
Quick-step Laminate Flooring
jaskel replied to khengjoo's topic in Ceiling, Walls and Flooring Works
Most of the laminate flooring already using the click on type..no more glueing. -
QC checking now............
-
Not easy to be a contractor.....haiz....life is tough..
-
Loss the case.. ....not as cunning as the couple...They actually scape off the plaster and when the HDB officer and Tech. officer came...it was only left rockstone....Asked to patch up all the hairline cracks (more than 50% are old cracks) of the whole hse walls and ceilings, then paint it....but not the patched part only but the whole walls and ceilings....looking at it was...painting the whole hse lor...like that where got earn doing your hse.. Asked me to do rockstone for their kitchen ceiling then repaint it...I was like huh...what the F...cos they want the same texture be it plaster flat or else rockstone...even the tech. officer don't want me to do plastering and where got company doing rockstone now? So went down told to HDB officer that I rather paid them and they find their own contractor to do it or not lor.....cos from they attitude talking to us was not satisfy, come back and do again.