yo man, no problem.. Jason drove us there as we are quite nearby....so we went together to kpo a bit..I hope u and your wife wouldn't mind.. I think our flat are in the same condition when we take over.. but your is pretty challenging esp the staircase's area. That beam...ya man...my wife say cannot remove the beam..but can beautify it.. We will find some pic see if it can help u. My design are simple lah... By all mean, take watever design u feel suit u. haha. The door are customised thru Jason. Goodrich installation initally was 300.00 which Jason quoted us.. But, we need to install it on another wall today...so they charge us an additional 100.00 but Jason manage to call them and negotiate to 50.00... Initally, Jason wanted to bear the cost of 50.00, but we think is not fair...Thus, we pay ourselves. the total cost for installation is 350.00 The wallpapers we bought from China.
-
thanks.
-
15-Oct-2009 Glue used... We left some carpentry which is not up yet....lightings....and misc.... Getting closer to end of our reno. That all folks.
-
15-Oct-2009 Dining area wallpaper completed. Shot from kitchen.
-
15-Oct-2009 Study room - Wallpaper completed. But, we have to wait for the joint line to dry out. Jason mentioned he wanted to add lighting to the room as currently we have only 2 downlights in this room. He say "Swee leh, but too dark lah!" Don't ask me which one is mirror, which one is reflection..and taken from which angle..I listen to my wife explanation....I still cannot figure out..
-
15-Oct-2009 Completion of wallpaper for the living room.
-
15-Oct-2009 We mis-calculated our wall's size...So end up there are 2 more rolls of wallpapers.. Thus, we decided to paste it on our dining area.
-
15-Oct-2009 Study room - Wallpaper. WIP.
-
15-Oct-2009 Living room - keeping the end of the wallpaper.
-
15-Oct-2009 Goodrich guys (*bunch of six*) came and start singing? haha. Must be a good day for them I suppose. And they start all the measuring, gluing and pasting. They are very responsible accordingly to my wife as I wasn't there.
-
15-Oct-2009 Checking the "water balance" for the mirror doors.
-
15-Oct-2009 Third day of work on the doors. difficult doors. Hinges use for the door..Wife say "this hinge is good, compare to the traditional one...." <- I don't understand.... But har.... I understand now after starring at it. Tracks for the doors...Hmm..no comments on it yet; have to use the door before we know it durability.
-
15-Oct-2009 These are my MBR's side table/drawers. Wife requested the back of the table to be paint black...so that the mirror reflection will not reflect out as white. But, contractor is nice enough to laminate instead for us.
-
D'amour ~ A Home With Peace,love ,happiness And Good Blessing.
red_devil replied to doremon2009's topic in Reno t-Blog Chat
This is based on my guess/assumption/speculation ya? As I didn't do cement screed before...prior zero experience on that to me. From a client which is from your point of view, I rather trust and place 100% answers from HDB instead. I can't really judge is HDB or your contractor is right....but I know HDB is law by law....very inflexible...so if is me I rather work by their so called rules and regulations... 1. Could be they rather let HDB's contractor take the responsibility of the levelling...since if your renovator finish all the floor tiling...and HDB then start cement screed...then is the HDB's contractor job to make sure is level.. Therefore, renovator does not have to be responsible for that? Hmm.. Whoever do the levelling perhaps, need more man-hours or man-days...your renovator thus need to absorb the cost... 2. This could be true. Take longer to dry up and there are certain height for tiles flooring to adhere to. 3. Hmm....I thought if you are doing the wooden flooring....then don't need to do cement screed? Renovator's job to cement it even then do wooden flooring? 4. Hmm...I read this several times, could it be your renovator misunderstand you? He/she thought u are doing cement screed for the whole unit.....then I presume levelling indeed pose a problem... I have the impression, u are just doing only cement screed for your living room, the rest of the rooms will be either tiles or paraquet or laminate...then levelling doesn't seems to be a problem. All these are just my guess ya? Hmm...why don't u called up any contractors and give them a call and ask them about it? I think is safer. -
Jason U&b Home Reno
red_devil replied to yvonho's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi guys, you can get his info from here: http://ubreno.blogspot.com/ -
D'amour ~ A Home With Peace,love ,happiness And Good Blessing.
red_devil replied to doremon2009's topic in Reno t-Blog Chat
HDB is definitely right especially on point 3. HDB engage external contractors to do cement screed and the list of rectification u requested. And yes, renovator should not come in until all rectification is done to your satisfaction. Which mean... perhaps, you should tell your contractor or ID he/she will be liable if any damage is done to the cement screed and rectification which was done by HDB? Your renovator is right on the long waiting list.. But really depends...perhaps, u can check with HDB on that and get a date/time? Hmm..can't advise u on part 1 and 2... -> This is based on my own asumption, the levelling will only be a issue if you are overlaying tiles? If you are hacking and then laying the tiles...hmm..doesn't seems to be a problem. -
I am reading the tong su myself ...but I think I still need to go down to check with the shop who sell us to confirm whether my finding is right or not; it is kinda of interesting... I am drafting my list of attendees now...is a headache..to invite or not to invite. How many tables... Ya lor....I think the June slot might be very tight for next year. I think I better finalised the list soon....or should I choose a date first and call the hotel.. Oh..the pipe is a distance away from your main gate.. So are you going to buy some plants to deco the area? The sofa, my damage is 2180. They wanted us to buy the package; but the rest of the items isn't to our liking. 2180 included resizing the sofa to 3m and 2 sets of covers. Not sure whether is worth a not, but I did negotiate with the boss for a while. Perhaps, slightly more ex, as I didn't take their package.
-
hahaha.. He is more than willingly to do it... Power up his Vitamin M and decrease our Vitamin M.
-
Welcome to renotalk. hahaha.
-
u don't "jia jia" hor.... U got staircase major revamp one hor.....
-
Not many carpentry la... I just left one more for the balcony... then all my carpentry is done.
-
13-Oct-2009 The deadly door that has took the carpenter 3 days to install.. I think it needs another day. We like the door very much. I think the carpenter did a very good job. That all folk.