jacksonsoh09
Members-
Content Count
5 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout jacksonsoh09
-
Rank
Member
Previous Fields
-
Gender
Male
-
Me Too, Just bought from Desmond too. Really a very nice guy. His service is great. He have give me a package way below my buget
-
Anybody In Yung Sheng Rd? (july 07 Ballot)
jacksonsoh09 replied to kingzkong's topic in Neighbourhood Networking
Hi Guy, just got my keys. My Blk is 179 I have ask for a number of quote and this following one seem the best But i do not have a budget like this. Need all your kindly advise for this I have only a budget of 30K or MAX 32K. 1) Hacking Work - To supply labour to hack wall and door opening between master and bedroom 2 and make good - S$450.00 2) Masonry Works - To supply and lay 60cm by 60cm homogeneous floor tiles for living, dining and storeroom - S$2900.00 - To supply and lay 30cm by 30cm heavy duty homogeneous floor tiles for kitchen c/w water proofing membrane - S$1100.00 - To supply and overlay 30cm by 30cm homogeneous floor tiles and wall tiles (up to ceiling) for master toilet - S$2100.00 - To supply and construct shower kerb at master toilet and concrete base for fribge, cabinet and washing machine - S$330.00 - To supply and box up piping with water proof ply at master toilet - S$200.00 - To supply and lay laminate flooring for 3 bedrooms and platform in living room c/w skirting (Cement screed by HDB) - S$2400.00 3) Plumbing Works - To supply and run stainless steel piping at Kitchen (cold) and 2 toilet (Hot & Cold) - S$680.00 - To supply labour to install kitchen sink with drainage piping - S$60.00 - To supply labour to install wash basin to master toilet - S$60.00 - To supply labour to install 1no of storage heater at kitchen area - S$80.00 4) Cornices/Painting Works - To supply and install false ceiling for living, dining, master bedroom passage and foyer area - S$1200.00 - To supply and install decorative light holder **** area - S$700.00 - To supply and paint wall, ceiling, piping and door for whole house - S$1300.00 5) Electrical Works - To supply and run 20nos of downlight for living, dining and passageway - S$440.00 - To supply labour to install 20nos downlight fitting for living, dining and passageway - S$160.00 - To supply labour to install 10nos ceiling light fitting for whole house - S$80.00 - To supply and run 2nos of SCV socket for master bedroom and living room TV area - S$200.00 - To supply and run 3nos of 13amp double socket for master bedroom and living TV area - S$135.00 6) Carpentry Works - To supply and fabricate 35ft kitchen cabinet with laminate finish and ABS trimmings - S$3500.00 - To supply and install solid surface at kitchen cabinet counter top (15ft) - S$1050.00 - To supply and fabricate full height shoe cabinet in laminate finish (5ft) - S$900.00 - To supply and fabricate full height feature wall with storage cabinet at storeroom area with laminate finish (10ft) - S$1800.00 - To supply and fabricate storage cabinet with PVC finish in storeroom (13ft) - S$680.00 - To supply and fabricate feature wall for LCD TV **** room with laminate finish (10ft) - S$1200.00 - To supply and fabricate low TV cabinet in laminate finish **** room (3ft) - S$300.00 - To supply and fabricate full height mirror wall at dining area with wooden backing (88ft square) - S$1320.00 - To supply and construct 5" height platform **** room - S$300.00 - To supply and fabricate low height seatie in laminate finish at master bedroom - S$900.00 - To supply and construct 5" height platform with recess in for bed at master bedroom - S$780.00 - To supply and fabricate feature wall for LCD TV at master bedroom in laminate finish (4ft) - S$480.00 - To supply and fabricate2nos bedside table in laminate finish at master bedroom - S$400.00 - To supply and fabricate single panel wooden sliding doors with glass panel at walk-in-wardrobe entrance (3ft) - S$780.00 - To supply and fabricate full height wardrobe without doors in PVC finish (15ft) - S$2400.00 - To supply and fabricate suspended dressing/study table top in laminate finish (9ft) - S$800.00 - To supply and fabricate suspended vanity cabinet in laminate finish at master toilet (5ft) - S$450.00 - To supply and install solid surface for vanity top at master toilet (5ft) - S$350.00 - To supply and fabricate full length mirror at master toilet (20ft square) - S$300.00 - To supply and fabricate display island cabinet at walk-in-wardrobe area in laminate finish - S$680.00 - To supply and install 2nos bedroom doors in laminate finish - S$500.00 - To supply and install aluminium sliding window grilles for 3 bedrooms - S$480.00 - To supply and construct false wall with display opening at entrance area - S$480.00 7) Misc - To supply and acid wash for whole house - S$250.00 - To supply and install 10mm tempered glass shower screen for master toilet - S$500.00 Total about S$37K Need you guys kindly advise is this quotation whether it is justifiable? Is there any hidden cost not included in this quotation? anyway to furhter reduce it Thanks -
Hi Guys, This is my first post to this forum I am considering this quotation list for my new 5rm standard flat but would appreciate if I can get a any final opinion on the list below. Thanks for reading. Need advise. I have only a budget of 30K or MAX 32K. 1) Hacking Work - To supply labour to hack wall and door opening between master and bedroom 2 and make good - S$450.00 2) Masonry Works - To supply and lay 60cm by 60cm homogeneous floor tiles for living, dining and storeroom - S$2900.00 - To supply and lay 30cm by 30cm heavy duty homogeneous floor tiles for kitchen c/w water proofing membrane - S$1100.00 - To supply and overlay 30cm by 30cm homogeneous floor tiles and wall tiles (up to ceiling) for master toilet - S$2100.00 - To supply and construct shower kerb at master toilet and concrete base for fribge, cabinet and washing machine - S$330.00 - To supply and box up piping with water proof ply at master toilet - S$200.00 - To supply and lay laminate flooring for 3 bedrooms and platform in living room c/w skirting (Cement screed by HDB) - S$2400.00 3) Plumbing Works - To supply and run stainless steel piping at Kitchen (cold) and 2 toilet (Hot & Cold) - S$680.00 - To supply labour to install kitchen sink with drainage piping - S$60.00 - To supply labour to install wash basin to master toilet - S$60.00 - To supply labour to install 1no of storage heater at kitchen area - S$80.00 4) Cornices/Painting Works - To supply and install false ceiling for living, dining, master bedroom passage and foyer area - S$1200.00 - To supply and install decorative light holder **** area - S$700.00 - To supply and paint wall, ceiling, piping and door for whole house - S$1300.00 5) Electrical Works - To supply and run 20nos of downlight for living, dining and passageway - S$440.00 - To supply labour to install 20nos downlight fitting for living, dining and passageway - S$160.00 - To supply labour to install 10nos ceiling light fitting for whole house - S$80.00 - To supply and run 2nos of SCV socket for master bedroom and living room TV area - S$200.00 - To supply and run 3nos of 13amp double socket for master bedroom and living TV area - S$135.00 6) Carpentry Works - To supply and fabricate 35ft kitchen cabinet with laminate finish and ABS trimmings - S$3500.00 - To supply and install solid surface at kitchen cabinet counter top (15ft) - S$1050.00 - To supply and fabricate full height shoe cabinet in laminate finish (5ft) - S$900.00 - To supply and fabricate full height feature wall with storage cabinet at storeroom area with laminate finish (10ft) - S$1800.00 - To supply and fabricate storage cabinet with PVC finish in storeroom (13ft) - S$680.00 - To supply and fabricate feature wall for LCD TV **** room with laminate finish (10ft) - S$1200.00 - To supply and fabricate low TV cabinet in laminate finish **** room (3ft) - S$300.00 - To supply and fabricate full height mirror wall at dining area with wooden backing (88ft square) - S$1320.00 - To supply and construct 5" height platform **** room - S$300.00 - To supply and fabricate low height seatie in laminate finish at master bedroom - S$900.00 - To supply and construct 5" height platform with recess in for bed at master bedroom - S$780.00 - To supply and fabricate feature wall for LCD TV at master bedroom in laminate finish (4ft) - S$480.00 - To supply and fabricate2nos bedside table in laminate finish at master bedroom - S$400.00 - To supply and fabricate single panel wooden sliding doors with glass panel at walk-in-wardrobe entrance (3ft) - S$780.00 - To supply and fabricate full height wardrobe without doors in PVC finish (15ft) - S$2400.00 - To supply and fabricate suspended dressing/study table top in laminate finish (9ft) - S$800.00 - To supply and fabricate suspended vanity cabinet in laminate finish at master toilet (5ft) - S$450.00 - To supply and install solid surface for vanity top at master toilet (5ft) - S$350.00 - To supply and fabricate full length mirror at master toilet (20ft square) - S$300.00 - To supply and fabricate display island cabinet at walk-in-wardrobe area in laminate finish - S$680.00 - To supply and install 2nos bedroom doors in laminate finish - S$500.00 - To supply and install aluminium sliding window grilles for 3 bedrooms - S$480.00 - To supply and construct false wall with display opening at entrance area - S$480.00 7) Misc - To supply and acid wash for whole house - S$250.00 - To supply and install 10mm tempered glass shower screen for master toilet - S$500.00 Total about S$37K Need you guys kindly advise is this quotation whether it is justifiable? Is there any hidden cost not included in this quotation? Thanks
-
Hi Guys, This is my first post to this forum I am considering this quotation list for my new 5rm standard flat but would appreciate if I can get a any final opinion on the list below. Thanks for reading. Need advise. I have only a budget of 30K or MAX 32K. 1) Hacking Work - To supply labour to hack wall and door opening between master and bedroom 2 and make good - S$450.00 2) Masonry Works - To supply and lay 60cm by 60cm homogeneous floor tiles for living, dining and storeroom - S$2900.00 - To supply and lay 30cm by 30cm heavy duty homogeneous floor tiles for kitchen c/w water proofing membrane - S$1100.00 - To supply and overlay 30cm by 30cm homogeneous floor tiles and wall tiles (up to ceiling) for master toilet - S$2100.00 - To supply and construct shower kerb at master toilet and concrete base for fribge, cabinet and washing machine - S$330.00 - To supply and box up piping with water proof ply at master toilet - S$200.00 - To supply and lay laminate flooring for 3 bedrooms and platform in living room c/w skirting (Cement screed by HDB) - S$2400.00 3) Plumbing Works - To supply and run stainless steel piping at Kitchen (cold) and 2 toilet (Hot & Cold) - S$680.00 - To supply labour to install kitchen sink with drainage piping - S$60.00 - To supply labour to install wash basin to master toilet - S$60.00 - To supply labour to install 1no of storage heater at kitchen area - S$80.00 4) Cornices/Painting Works - To supply and install false ceiling for living, dining, master bedroom passage and foyer area - S$1200.00 - To supply and install decorative light holder **** area - S$700.00 - To supply and paint wall, ceiling, piping and door for whole house - S$1300.00 5) Electrical Works - To supply and run 20nos of downlight for living, dining and passageway - S$440.00 - To supply labour to install 20nos downlight fitting for living, dining and passageway - S$160.00 - To supply labour to install 10nos ceiling light fitting for whole house - S$80.00 - To supply and run 2nos of SCV socket for master bedroom and living room TV area - S$200.00 - To supply and run 3nos of 13amp double socket for master bedroom and living TV area - S$135.00 6) Carpentry Works - To supply and fabricate 35ft kitchen cabinet with laminate finish and ABS trimmings - S$3500.00 - To supply and install solid surface at kitchen cabinet counter top (15ft) - S$1050.00 - To supply and fabricate full height shoe cabinet in laminate finish (5ft) - S$900.00 - To supply and fabricate full height feature wall with storage cabinet at storeroom area with laminate finish (10ft) - S$1800.00 - To supply and fabricate storage cabinet with PVC finish in storeroom (13ft) - S$680.00 - To supply and fabricate feature wall for LCD TV **** room with laminate finish (10ft) - S$1200.00 - To supply and fabricate low TV cabinet in laminate finish **** room (3ft) - S$300.00 - To supply and fabricate full height mirror wall at dining area with wooden backing (88ft square) - S$1320.00 - To supply and construct 5" height platform **** room - S$300.00 - To supply and fabricate low height seatie in laminate finish at master bedroom - S$900.00 - To supply and construct 5" height platform with recess in for bed at master bedroom - S$780.00 - To supply and fabricate feature wall for LCD TV at master bedroom in laminate finish (4ft) - S$480.00 - To supply and fabricate2nos bedside table in laminate finish at master bedroom - S$400.00 - To supply and fabricate single panel wooden sliding doors with glass panel at walk-in-wardrobe entrance (3ft) - S$780.00 - To supply and fabricate full height wardrobe without doors in PVC finish (15ft) - S$2400.00 - To supply and fabricate suspended dressing/study table top in laminate finish (9ft) - S$800.00 - To supply and fabricate suspended vanity cabinet in laminate finish at master toilet (5ft) - S$450.00 - To supply and install solid surface for vanity top at master toilet (5ft) - S$350.00 - To supply and fabricate full length mirror at master toilet (20ft square) - S$300.00 - To supply and fabricate display island cabinet at walk-in-wardrobe area in laminate finish - S$680.00 - To supply and install 2nos bedroom doors in laminate finish - S$500.00 - To supply and install aluminium sliding window grilles for 3 bedrooms - S$480.00 - To supply and construct false wall with display opening at entrance area - S$480.00 7) Misc - To supply and acid wash for whole house - S$250.00 - To supply and install 10mm tempered glass shower screen for master toilet - S$500.00 Total about S$37K Need you guys kindly advise is this quotation whether it is justifiable? Is there any hidden cost not included in this quotation? Thanks