Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

gaku70

Members
  • Content Count

    406
  • Joined

  • Last visited

Everything posted by gaku70

  1. Ok will keep an open mind and discuss with him my idea. I will request to go through the detail with the carpenter. Hope I can request for Ah wei's service as well.
  2. Ok will do, understand the carpenter will draw another round as well. If I am able to meet him, will go through the details with them. Cheers.
  3. I spoke to him in the morning and he insist that he will to talk to me first to finalise the design and laminate. Even if it is out of goodwill, I hope he will consult me before changing to adding things. As you said, it might not be what customer wanted. I would definitely wish to spend some time with the carpenter to discuss. From what he sounded, got a feeling I might not get a chance to talk to the carpenter.
  4. Yes he is. But you got to be fast because I think he was just there to instruct the aircon guy on the trunking. Don't think he will be there for long.
  5. Yes I feel better after knowing that Uncle is at my place. It is not common to find him there. Sat must buy 4D and Toto.
  6. Thanks for the offer. I am grateful many of the folks here are very helpful. For storage it is not too big a problem. Uncle has told me that 3 bedrooms will be ready except carpentry. So I can store those not important stuff there. Thanks again.
  7. I am planning to rent the place for a week in the same block in amk. As the rental place is in the same block and is currently empty, I would negotiate to shift in my stuff bit by bit everyday as I don't have to hire movers. Thanks for the offer. I cannot do that but I am grateful that you are offering help. familyof4: I am feeling better already. Uncle called me twice just now about the aircon location. Think either he forgot or lost my floorplan again. He called me the second time because 2 out of 3 locations have to be changed. Confirmed with him on the piping and he told me the guys just came. Uncle brother is also clearing the rubbish in the background. Have you call him on the rubbish? Next time must call uncle to get things moving.
  8. Carpentry fabricaton completion. The assembly will be only one day or two. That is after painting.
  9. familyof4: I will ask him who is the carpenter tonight. I hope to cheer up but find it difficult. I will try. I am not able to lay the mat due to the rubbish and tiles but if your rubbish is cleared, I think you should be able to do it yourself. Guess it is not too difficult. Remember to ask them to clear the rubbish today. Uncle brother is at my place now. Do you want to call uncle to get his brother to clear your place since he is here. Frankly I don't believe in the schedule that was given. I just check my notebook and this is why uncle told me and I wrote it down. Week 1 : Hacking 3 days and tiling 5 days. End of week 1: Must meet Jason on carpentry. Week 2: Piping, Electrical and carpentry. Week 3: Painting That is why based on the reno work, uncle initially told me he needed only 3 weeks but abit tight. So I gave him another week buffer since my current flat handover is on 1st June. Now I am into the end of Week 3. I saw the false ceiling boards on the floor but L-box was up on tuesday. After that no more progress. Not sure if Jason understand the drawing I gave him. This few evenings I could not check because there is no light. Probably will check tomorrow morning. Please do not ask uncle to stop your reno. I will feel very bad if you do. I have made the decision to use uncle's service and should accept the consequences. I can understand if the workers are overstretched and I can accept schedule to be push back a few days. But I could not take empty promises that I received almost everyday like this week. preciousjam: ok noted, will talk to the carpenter before work starts.
  10. familyof4: I do agree with you. I know it will be very dirty and messy if I move in before completion. My family is against the idea not because of the dirt but they don't like the idea of half naked men walking around when they are staying in the house. It is also poses other problems. On the rental, I have found cheaper rate but not at my block. I would need to pay for mover to shift to another block. The current offer I have is in the same block. So no choice higher rate. Need to push alot. Last few days not much activity and after call to uncle, things move. I called up uncle brother to make sure he clear the stuff and lay the mat. Just now he called me back to ask for my lock number. So I am sure he is at my place already. For the pipe guy, I do not have his number. If not will contact him directly. Jason told me he has arranged. I am quite sceptical. For aircon, have contacted in the morning to make sure he go install the trunking. preciousjam: Spoken to Jason but he refused to bring the carpenter. He mentiond he need to know the design and laminate first before he asked the carpenter to talk to me another time.
  11. Yes I have been keeping a lookout for flat for rental in my area. But because it is for short term, either one week or two, some are asking for ridiculous rate. I didn't know that I have to speak to the carpenter, will ask Jason to arrange.
  12. Didn't want to update anything yesterday due to foul mood. Firstly, tiling has been completed on 18th, I noticed that only a portion of floor in living is covered. Partial are by empty tiles boxes. All the bedroom, kitchen, store, balcony, not coverd. Two hugh rubbish hills are also sitting in the living room and bedroom and it is obstructing the path. Don't know why they don't want to clear since some parts are from hacking. Hightlighted to them to clear and put protective mat so that flooring will be damaged. Tuesday checked, rubbish not clear yet and floor not covered. Call Jason and he said will do it tomorrow. Checked on Wednesday, nothing done. He said not enough mat, will buy tomorrow. Called Thursday morning to remind him, said he is going to buy later. Checked in the evening still not done yet. Secondly the progress. Piping suppose to be done tuesday but not done. Jason said uncle didn't pass him drawing so cannot start and will start wednesday. Wednesday didn't start cos the piping guy busy and said will start thurday. Checked thursday nothing done. I don't know what is going on or when the piping is ever to get done. Called up uncle yesterday to express my unhappiness. I know the floor got lots of scratches because alu pipes, broken tiles lying around on the uncovered area. Bunch of alu are also in store room where floor is not covered. Uncle assured that Friday will clear and lay the protective mat. Explained to him that weekend all my stuff are coming in. By then the rubbish hill will not be able to go out. Lastly uncle admit that it might not be possible to HO end of month. But three rooms can be completed without carpentry. Told him not possible for me to move in my family when work is still being done. He asked me if 50-50 for my rental is alright or not. I am upset not because of paying the rental but the commitment and also the inactivity. I have found a flat in the same current block looking for rental. Will be meeting the landlord this sunday to see if can lower the rate and confirm the rental. There are some other smaller issues like forgetting this and that. Suppose to meet Jason yesterday to finalise the carpentry but he could not make it. He then told me that the detail will have to talk to the carpenter. I was wondering if that is the case, might as well talk to the carpenter direct.
  13. The one near the entrance is only one side rail. I thought that might not be sufficient and went to the extreme right of the shop. The one I look at is much better. I would need to bring measuring tape this time.
  14. I see. Maybe my carpentry job is not alot and simple and Jason can handle. Just hope he will discuss with me before doing anything.
  15. Ya might be true. Better safe than sorry. I also have chose the paint. Thought remember Jason say just sms him the number to buy. He called and ask me to write down on the floor plan and will collect this evening. By the way, I thought carpentry just talk to Jason. He didn't mentioned must meet the carpentry guy. I also have confirm what I want based on the sketch. Will tell him tonight.
  16. Pet: Sorry abit blurr, quite stress this few days. Christmas moss is very good for fries to hide. Angel: I prefer plants that are easy to maintain. So usually I go for moss or other floating plants. If you like to have forested landscape, you will need CO2 supplementation and fertilization. I find it very troublesome. What I do usually is to spread the moss on driftwoods or you can put on mesh vertically for background. By the way, you are talking about aquatic plants right?
  17. ok thanks for the info. If you do not mind, can pm the price as well. I will look for Lee. Eh..Lee 16, maybe there are 16 Lees there.
  18. My current place also using 3 in 1 and also a lot of touchup but I see only abit difference. Maybe the pro will find it very different.
  19. The aunty that served me also ai mai ai mai. I ask her what is the size and she pointed the rack and say "noh..this is the size". So I agar agar use my finger to judge the width is about 12 inches. Ask got anymore, she say all here. Do you know what is the exact model of the rack? Maybe if anyone knows the plump guys name can share with us. xiaobinbin, angel: can I know the exact size and current price of the rack that angel bought?
  20. No problem lah. Actually Jason told me only don't use 3 in 1. Think rest should be ok.
  21. Strange. Recently went to IMM Hoe Kee and check with them on the sauce rack, they said only got one type with both side rail, width is about 12". The price is $128. Can only give 5% discount.
  22. Update after visiting the flat in darkness. Electricity was cut off. Just call both Jason and Uncle why the stuff that they said are doing all not done. Piping suppose to be done yesterday. Jason said uncle didn't give him the diagram so cannot do. I pass the drawing 2 days ago. He say will take from uncle tomorrow. See the floor really heart pain. Have reminded Jason to place paper mat to protect the floor. This morning told me not enough, he will buy later. Just now ask him, he told me tomorrow will buy. The small mountain of waste is still sitting in the living room for many days. Don't know when they will clear. Hope when before my delivery come on Sat, the waste can be cleared. If not, I anticipate items damaged due to the clearing. Uncle has arranged aircon to do trunking. Don't know why not done. Uncle said today the aircon guy postponed to Friday. I asked him again can I arrange for mover next saturday. He told me need to check with Jason.
  23. I see. Thanks for the clarification. He abit lor soh right. Frankly I am not too happy after went to check. Will report in the tblog. ocheeng: Thanks for info on the paint mixing.
  24. familyof4: Just back from my place but no electricity so cannot see anything. Check with you something. If Nippon can use 3 in 1 or not?
  25. I already have the concept on what I want to do. Jason asked me to sketch on the drawing as well and guess he will pass to the carpentry guy. Didn't know that I have to meet him. Will Jason arrange or do I have to call him to explain what I want to do?
×