gaku70
Members-
Content Count
406 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by gaku70
-
Thanks for the lobang fondue, your info very fast.
-
Extreme lighting is in 371 Balestier rd, near mandalay rd. 1) Usually will ask Uncle's electrical guy to do the installation. 2) Can do your planning and then discuss with electrical guy. If not, bring your floorplan to the shop and they can estimate for you. 3) Kitchen accessories can ask the carpenter to bring their catalogue for you to choose. If not, can check with them the cabinet size and buy in accessories shop. For the toilet, will have to get accessories yourself. Label the items on the wall where you want to install and uncle's man will do it for you.
-
Ok, so you will have doors to cover up the storage space right. For the bookshelves, any glass door to keep out dust?
-
Blue_diamond: If you already know what you want and the pricing, you can look for George. I got quite a good deal from him as he is able to match the lower prices of other shops. Remember to ask for better ballast (atco) and osram or philips bulbs.
-
Thanks Angel. Quite true will be too heavy for big boxes. And I will be taking the stairs because current block doesn't have lift at every level. Lucky just moving to lower level and not higher at the same block. Ok nearly forgot to buy a trolley, maybe those plastic type.
-
Yes, I think it is good that uncle go take a look and be aware of what's happening on the ground. Below is a picture of solid ply just for anyone insterested. By the way, can pm me who is your carpenter.
-
aubrey: If my memory serve me correctly, carpentry done with solid plywood is more expensive. I know some id or contractor try to use cheaper material. The one in your picture looks like composite plywood. It is not a solid plywood because it is more expensive. Anyway after edge trimmed, you will not see what is inside. So usually thin pieces of plywood will be composited together with the particles, fiber board (those you see in the middle) with resin. It is cheaper to have thicker composite with lesser plywood. Ok I shall not go any further. Haha...got to edit some sensitive information here. Already got sms coming in.
-
I would suggest you talk to the people doing the installation. Do you want Ah Hock's hp?
-
I see. If that is the case, then there are chances that the carpentry will be damaged by the acid.
-
During my discussion, I was told that if the person using is not familiar example guest, he might not slide the door fully and then force the door to be opened. That will cause some of the parts to break. I forgotten the term he used. He told me he changed until scared.
-
The model is Alpha S100. Just got mine black and silver as well. Haven't installed yet. But the sales man warned me that this heater will not last as long as 707. You can talk a look at the pipe and they are plastic. 707 is brass. So if spoilt, cannot repair got to change the unit. But no choice, it's slim and nice.
-
Frankly, PD door is nicer but must be gentle to it. Can check with Ah Hock on some spare parts to buy in case got problem.
-
$700 price is a good deal considering the pull out trays and book shelves. Length of the cabinet is 7ft I presume?
-
If you are using rainshower, definitely there will be more pipes. Important thing is to plan where is the location of your heater as well. It is best to discuss with the plumber on the layout. My finalised discussion with the pm and the result after plumber installed is totally different.
-
Got a question regarding the acid wash. Is it done after the carpentry is up. If it is, then will the acid damage the carpentry especially if it comes into contact with the acid.
-
Materials That U Regret Using/ Installing
gaku70 replied to st002's topic in Home Maintenance & Repairs
Can pm me what is the quote. For my stuff, I think one trip might not be enough. -
Heard that there is many maintainance problem with PD door . If you insist of PD door, he will ask you to purchase direct from PD door and ask them to install. Problem of PD door is whenever you have guest coming, you will have to explain how to use it. If not it is easily damaged. Bi-fold door will not trap water. The rail is a inverter "T". Have been using for more than 10 years and no algae yet. Only problem sometime the rail not smooth and got to use sandpaper to smoothen and apply WD40.
-
company don't really have big carton boxes. No problem will go see if anywhere can find. Worst case, hand carry. Just a few storey below, should be ok.
-
Congrats for moving in on Sat. Didn't know must inform the citygas guy to turn on. Thought when they do installation of the pipe, should have done a check. Might be during cabinet installation, there is some knock on the pipe. For the rectification, did you arrange weekend when you are around or still using the number lock?
-
Ok, confirmed shifting to rented flat this weekend. Anyone know where I can get boxes for shifting? Not getting movers as shifting to a unit in the same block, so no free boxes from them. Thank you.
-
I would prefer if there is any changes in contractor, Jason can let me know. If not, I will be talking to the wrong guy. I have been talking to Ah Liu and only today know about the change when i called Jason. Things are not that smooth as always. I only managed to inspect in daylight on the weekend. For weekday by the time I reach I can only inspect with a torchlight. Some of the hiccups were like: One of my pipes which was supposed to use cabinet was fully boxed up. So I have to ask them to tear down. Missing electrical lights in bathroom. Light point not at the correct location. Electrical point and scv location at the middle of wall. (I prefer side) Now I perfer to talk to the 3rd party directly to prevent any hiccups.
-
Update for the day. Saturday was delivery day. WC got chipped problem and lucky they got baron to change on the same day. Got the wrong hob and I quickly tell the uncle that he sent the wrong one. Actually he deliver the more expensive. Will resend only on Monday. Forgot to charge my phone and manage to make only one call out to Jason. Carpenter fly aeroplane in the afternoon but I cannot call out. Waited till evening and finally gave up and went home. Electrical point quite a number to be rectified. Painting of two rooms completed. Called Jason on today to find out what happen. Was told Ah Liu also overloaded now change to Ah Hong. Don't know about his workmanship. Should have told me then I don't need to wait for him the whole afternoon doing nothing and he asked me to contact the electrician and carpenter directly. Hopefully, this week can complete electrical. New HO set by Jason is 3rd June. Just to check, installation of the sink, wc is done only after carpentry right?
-
Unfortunately change again, now become Ah Hong. Sian, keep changing.
-
familyof4: Was told Ah Wei is up to his neck. So my carpenter will be Ah Liu. Told Jason I want to meet him to discuss. He told me it's not necessary unless there some problem with the design. I insisted on his hp number if any problem and finally got it. Don't know who is from Blk 428, maybe can advise the workmanship.
-
Metal: Just got my bill for this month yesterday and it was closed to $30. There were two occasions when I have to switch off the lights in the bathroom and one occasion was the water didnt turn off fully. I do not know if it's the worker or some visitor and so didn't mentioned to uncle. I was reading your blog and share your sentiments. I was having problems on the progress and spoken to uncle. Immediately today my place has many activities. I also mentioned about my problem of renting a place. May I suggest you talk to him to expedite.