gaku70
Members-
Content Count
406 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout gaku70
-
Rank
Super Platinum Member
Previous Fields
-
Gender
Male
-
Hi, Please pm henry contact to me as well. thks.
-
Sorry to hear that uncle fly your aeroplane. ashes02, trust me he is not at my house. I have not seen him since 13th June. Don't know why he keep saying he is at my place when he isn't. Even if he is, he cannot enter the house as he already took back the number lock long ago. Don't tell me he got spare keys to my house!! After 2 months still have not complete rectification? That is quite bad. Maybe you can ask Joseph to help (think he is not a pilot yet!)
-
When you have more rectification, you will see more problems like dirty wall, scratch etc. So if you can, be around during the rectification. For me, I personally see the workers drag the metal toolbox with a string on my tiles and really heartpain. Just to give you an example, the expense of second rectification after partial shift in cost me 2 floor mats, 2 shower towels, some scratches to the tv console and vanity top. Damaged toilet bowl don't count because I made them pay for it. So I will try to accept those little problem and reduce rectification.
-
I hope your reno will complete soon and you don't have to waste anymore of your weekends. Weekend should be spent resting and enjoying quality time with your family instead of facing the workers, right. I want to learn how to fill up the grouting as well. But mine is coloured grout, so should will ask the workers for advise how to do it and where to buy them. On the laminates, I will ask them to bring it back to the factory to rectify and bring back when it is done. Will be meeting the carpenter boss this evening. Talked about sink, mine also got scratches and they look like a second hand sink. The worker didn't use my towel to freshen up. They use it for tiling work because I found my white colour towel became brown and full of cement and dirt. Went to check another towel in the common bath room and same fate. But actually it will be more scary if they use it to freshen up without you knowing... For the scratches, actually the carpenter boss ask me to talk to him direct. I will see how it goes this evening. I am feeling much better these days. Thanks. So you also don't be too angry or upset ok cos it is bad for your health.
-
No need sad lah. Next time just take it with a pinch of salt. I will take your advise to see if the laminate with scratches can be changed. I was suppose to meet the carpenter boss on Monday after work to discuss. But he could not make it at the stipulated time, so postponed. Hopefully can meet him this evening. You might want to ask for the "guys" number and call them instead. Most proactive. Sekali they learnt fast and become pilots, you can still call them up to direct them to your place.
-
If the carpenter who is an expert does not know what stuff he is suppose to use, then I really doubt their capability and expertise. For the edges, I also told them cuttings are not even and they merely use the paint pen. Aubrey you must be an expert already after spending the sat patching the door frame. So now I know who to ask for help to patch my cabinets. Just kidding. You are right about the trimmed edges. Laminate is the easy way out. I will talk to the carpenter boss to see if they can do it in the factory. I have 3 carpenters doing my carpentry. I only know the good one and his name is Ah Meng who did my MBR wardrobe. The other two I do not know their names. Usually I only talk to the carpenter boss. If the hollow tiles are few, I will just close one eyes. But for my case, it is about 30-40%hollow. So no choice got to rectify. I am really tired of cleaning the house again after few rounds of rectification to the tiles. They also created more problems like damaging the toilet bowl, scratching the carpentry, solid surface and the flooring and using also using my stuff w/o permission. Remember I mentioned about them using my shower towels, floor mat, vacuum cleaning. I also do not like them to search my store room. Unfortunately at that time, I could not lock it because the floor in the storeroom also need to rectify. I told uncle how the worker can open up my present and use them (vacuum cleaner was a gift from my brother for the new flat). So now after I have shift in, I am really hesistant to let them rectify unless I am around to oversee. Actually moving new house should be a happy event. I have given up arguing about the reno esp on money matter. As you might be aware, I have spent unneccesary money on shifting and rental due to delay in HO. So in short, we have to bear part of the responsibility for choosing our own contractor, whether it is good or bad.
-
If you are not in a hurry to shift, then should not be a problem. Unlike me, got to shift many times and the endless problems and rectification cause me to fall sick. From the lesson learnt, please give some buffer to the committed HO date(s). If you have noticed from my t-blog, the committed dates have been moved several times. I think some parts of the carpentry that is blocking the gas pipe got to be taken out first. I thought the layout of the pipes have to be communicated with the carpenter first.
-
Ivy, quite true, higher it is more potential energy. Will feel more pressure. Do let us know how you feel after trying the shower.
-
Don't worry about me, I am feeling much better these days after not having to talk to the contractors that often. I am actually happy that the reno is coming to an end. Now I will be busy again planning my mini herb garden.
-
Tell you lah, uncle smoked you a few times already. Uncle called me up in the morning and told me will come to rectifiy. I told him I will only be in after noon. I didn't want to call him and see if he will call. If he call early, can rectify. If late, then cannot rectify cos I got visitors. In the end, no news from him. But I did called him yesterday to arrange for the Sat after next cos this weekend going north. The previous saturday on the 13th morning also told you he is at my place right but actually he is in woodlands. If scratches cannot accept, then think you might have alot of rectifications. If you can, do be around during rectification, if not they will suka suka knock here and there and create more problems.
-
MBR cabinet should be ok to change. But console will be difficult. I will talk to the carpenter boss to hear if it can be changed. Think Ah Wei can change things easily cos he is in uncle's good book. My carpenter is otherwise.
-
Ivy, the rainshower looks very high. Think mine is about one foot lower. Can the height be adjusted? But then again, functional wise should not be any issue.
-
From my understanding with the carpenter, it's actually not very simple. For shoe rack, due the trimmed edges. I was told they will use another laminate to paste on top of it. For tv console, to change the laminate, need to dismantle some of the wall features. Then again, it might cause damaged to other laminate on the features. Another easier way will be to cut out the damaged laminate and glue a new one. Then you will see a separation between two laminates. Still in a dilema to change to not to change.