UPDATED WITH QUOTATION 2
I just got a quotation from a ID/contractor... Current flat is about 25 years old... It's time to change all the wiring, paint the house and reno the kitchen...
Quotation 1
1. General & Wet Work
1.1 Supply labor & materials to hack existing kitchen and 2 bathroom $1950
1.2 Supply labor & materials to lay new selected ceramic wall tiles for 2 bathroom $2550
1.3 Supply labor & materials to lay new selected floor tiles for 2 bathroom $1250
1.4 Supply labor & materials to lay new selected floor tiles for kitchen,include waterproofing $1350
1.5 Supply labor & materials to sand & cement with smooth cement plastering at kitchen wall $1800
1.6 Supply labor & materials to construct 50 mm high concrete kitcehn cabinet base $380
1.7 Supply labor & materials to construct concrete door kerb for both toilet entrance $90
1.8 Supply labor & materials to change new stainless steel refuse chute with lock level $200
2 Electrical Work
2.1 Supply labor & materials to re wire and install (everything required in the house) $1800
3 Plumbing work
3.1 Supply labor & materials to change & install new copper piping works for whole house $680
3.2 Supply labor & materials to install outgoing PVC waste for kitchen and 2 toilet $150
3.3 Supply labor & materials to convert squatting pan to seating WC bowl $220
3.4 Supply labor & materials to change new UPVC main waste pipe at common toilet $550
3.5 Supply labor only to install all sanitary ware
4. Aluminium Works
4.1 Supply labor & materials to install white powder coated bi-fold door for both toilets S500
5. Carpentry Works
5.1 Supply labor & materials to install low portion kitchen cabinet with works table top in laminated finishes $2800
5.2 Supply labor & materials to install storage cabinet at kitchen in laminated finished $1650
6. Painting Works
6.1 Supply labor & materials to paint the whole house wall & ceiling including kitchen wall $1500
Total: $19870
Quotation 2
1. Toilet (Common Room and Master BedRoom)
1.1 Hack off existing flooring tiles for both toilets
1.2 Supply and lay homogeneous non-slip design for both toilets flooring
1.3 Supply and lay water proofing for both toilets flooring
1.4 Hack off existing wall tiles for both toilets
1.5 Supply and lay wall with design tiles up to ceiling height for both toliets
1.6 Supply manpower to install 2 toliets sitting bowl with dual flush
1.7 Supply and install 1 aluminuim bi-fold door for master toliet
1.8 Supply and install 1 aluminuim bi-fold door for common toliet
1.9 Dismantle and dispose sitting bowl and wash basin for 2 toilets
1.10 Dismantle and dispose toilet door for both toilets
No. 1 - No. 10 : $4880 (package)
1.11 Supply manpower to convert squatting to sitting bowl for common toliet $150
1.12 Supply manpower to install 1 instant heater for toilet $100
1.13 Supply labour and materials to hack all santiary ware for 2 bathroom FOC
1.14 Supply labor and materials to construct concrete door kerb for both toliet entrance FOC
1.15 Supply labor only to install all sanitary wares (e.g. sink & mixer, shower and mixer, spray gun) FOC
2. StoreRoom
2.1 Construct new storeroom with hollock block and cement finishing $500
2.2 Supply and install 1 new door frame for storeroom $180
2.3 Supply and install 1 classic door for storeroom $200
3. Kitchen
3.1 Supply and lay kitchen flooring with water proofing $180
3.2 Supply and lay kitchen flooring with tiles $750
3.3 Construct kitchen base with tiles FOC
3.4 Hack off exisiting kitchen wall tiles $400
3.5 Supply and lay kitchen wall tiles up to ceiling height $2300
3.6 Hack off exisiting sink support $50
3.7 Fabricate and design kitchen cabinet with laminate finish. Est 25ft $2500
3.8 Supply and install solid surface kitchen table top. Est 15ft $1050
3.9 Supply and install stainless steel pipes for kitchen and toilets $580
3.10 Supply labour and materials to hack kitchen caninet set FOC
4. Wiring
4.1 13 amp double point @ 8 pts X $55
4.2 Heater point @ 1 pt X $90
4.3 Telephone point @ 1pt X $45
4.4 SCV point @ 1pt X $90
4.5 Lighting point @ 9pts X $45 (including install of lighting)
4.6 D/B $350
4.7 Fanpoint @ 1 pts X $55
4.8 Earth point @ 2 pts X $40
5.Others
5.1 Hack off exisiting rubbish chute and re-install 1 new stainless steel rubbish chute $160
5.2 Acid wash for kitchen and toilets flooring and wall tiles $100
5.3 Painting for whole house with ICI or Nippon emulsion paint included ceiling and pipes $850
5.4 Haulage Charges $520
5.5 HDB permit fees FOC
5.6 In-outlet for sink FOC
5.7 In outlet for washing machine FOC
5.8 Arrangement fot PUB gas FOC
5.9 Supply manpower to install stainless steel bowl for kitchen FOC
5.10 Supply manpower to install sink level tap for kitchen FOC
5.11 Supply manpower to install cooker hob FOC
5.12 Construct fridge base with tiles FOC
5.13 Construct washing machine with tiles FOC
5.14 Supply manpower to install 1 ceiling fan for living hall FOC
5.15 Supply and install dish tray for kitchen cabinet FOC
5.16 Supply and install dABS trimming for kitchen cabinet FOC
Total : 17K
As compared to my first quotation, the second quotation is cheaper? What you all think? Did I miss out anything? Any hidden cost that I might overlooked... Please comment k? THANKS