Hi All,
Could you kindly comment on the renovation quote I received. I'm planning on knocking down the 2 bedrooms on the 3rd floor and converting the current attic into a usable space. There would mean making the floor on the attic walkable and also building a staircase up. Here's the quotation I got for general contracting. Only the 3rd story and Attic would be worked on.
1 Preliminaries and Insurance $4,300
2 Demolition. Hack and Clear Debris Incl MOE Fee $4,800
3 Hoarding and Protection works $1,300
4 Structure Works $18,300
5 Staircase and Railing $7,800
6 Tiling work for 2 toilets $5,600
7 Brickworks and Plastering $7,300
8 Toilets waterproofing 2 toilets $1,200
9 Plumbing works for 2 toilets $3,200
10 Ceiling works $4,300
11 Electrical Works (Lighting Not Included) $3,800
12 Painting Internal $5,300
13 Painting External $4,500
14 Scaffolding and QP Fees $5,200
15 Shower Beneer(?) for 2 toilets $1,900
16 Floor and Staircase Seneeding (?) (Floor finishes not included) $2,800
17 Aircon Not included
Total Cost $81,600