Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

bubbli

Members
  • Content Count

    32
  • Joined

  • Last visited

Everything posted by bubbli

  1. Yup it did...we had made the rite decision when hacking the wall...now waiting for the whole place to be done up soon...
  2. Access Area Tiling Ceiling Fan Switches
  3. Up to date...painting is 100% completed except for the access area...Love the colours...pastel colours...Lights & Fan r up too..except for the L-box lites and the access area lite...Electrical Switches all done up as well... Access area tiles r also done up...Like the design...(Initially wanted the pebble wash more...but decided against it as it will wear off with frequent wash..)..But still the end result is good.. Internal Doors are changed...Didn't take any pic until the touch up work r done.. On Sunday..went to Poh Joo to buy the toilet bowls...washing basins...sink..toiletries stuff (mirrors....the towel racks...n etc..etc..) Spent $$$ but still within our budget... Overall we are satisfied with the work...so now waiting for more finishes to be up... Living, Dining & Kitchen Common Room Master Room Master Room Toilet Common Room Toilet
  4. Reno update as at 27.04.09: All tiling works is completed except for the laminate flooring in the rooms....Pipings all done up as well..Met up with ID to mark the power point for the electrical works...Also bought all lights for the whole house...Ceiling fan & the instant heater...$$$...Now waiting for the painting to commence this week...The progress of work is smooth flowing and on schedule... Plastering work completion for Living, Dining & Kitchen Area Plastering work completion for Common Room Plastering work completion for Master Room Tiling Work for Steps - Completed
  5. Kitchen overhaul is also completed...all tiling is done...we have opted out to do the wall tiling cos the $$...kitchen, washing base is also done..except for the fridge base...which will be done later...Windows for the kitchen will be change to the sliding one..We also got the new chute... Kitchen overhaul (Complete) Cabinet Base in Kitchen New windows for the master room As for now...all tiling work has been completed...plastering should be done by these 2 days...will be going down to our new abode soon...to see the work done so far...now waiting anxiously for the whole process to complete...New home here we come...
  6. Toilet Overhaul & Tiling has been completed as at 19.4.09...very hepi with the outcome...the only thing is both toilets doesn't have the same style of tiling work...but we still love it... Toilet Overhaul Master Room Toilet (Completed) Common Toilet (Completed) New Window Louvre for both toilets
  7. Thank you...yes whole house is overhaul...we r just hoping everything will be smooth flowing without any hiccups...our ID has been a great help...so everything is k...so now waiting for the reno to complete...
  8. Hacking of floor tiles had been completed so far...The wall between the living and the kitchen had been hacked too..For both bedrooms we have decided to overlay laminate flooring (save $$$)..At the moment the flooring tiles is still being laid and yet to complete.. This pic is taken on 3rd day of reno: Will upload others soon...Life has been ver busy so far...with the current reno and Sis wedding is up next mth too at the same time when reno complete...Wat a rush...
  9. Dining & Kitchen Floor Tiles Master Room Toilet Wall Tiles Master Room Toilet Part Wall & Flooring Tiles
  10. Tile Selected: Common Toilet Wall Tiles Common Toilet Floor Tiles Living Room Tiles
  11. I think my T-blog has gone to sleep for a long time....After alot of ho...ha...and many many more...our reno has started since 01/04/2009...Everything is so far on schedule...But we have cut alot of things to save cost...it has been difficult to get reno loan nowadays...so we have decided to cut back on some cost and do those unnecessary ones at a later part...as long as the necessity is there...we will make do...;-) 1st start...Current condition of the house:
  12. Well m reno has not started...everything is delayed..onli getting the keys in end of March...Quite upsetting as things didn't go as plan...Yup I have engaged an ID...now waiting till I get my keys...and also applying for the reno loan...might make some changes to the revamp of the house...will go on tighter budget as with this year recession ...alot of things can happen...scary...Will hope for the best... U can try Ah Soon, Ideal House, Gplan, Darwin, U-home...this r a few we approach n confirm one of them...Hope u will have a smooth ride with the quotes..it's kinda of confusing so many uotes..different prices..Phew... Hopefully in April..cos we onli getting the keys next end mth...
  13. Elo was reading tru...and saw that u have bought lights in JB...can pm or email me @ bubbli26@gmail.com on the address in JB that you bought the lights from.... Thanks alot..
  14. We have been pretty quiet lately...cos of all the packing of our current home...Last day will be on 7/2/09...Sob!! Sob!!.. We r selling our computer table..Still in good condition...Selling at $100..Cash & Carry before 7/2/09... Table Measurement: W : 2'8" / 80cm L : 4'12" / 150cm H: 2'5" / 72cm UPDATE: SOLD!
  15. Yup ...I think we know wat we wan...so hopefully the choosing of tiles will be fast...hope to select everything before reno starts...it will be easier that way...everything selected and confirm...reno start immediately upon seller's agreement...chop..chop...hopefully...
  16. Ya lor...so sad ...from 1st week of jan now changed to mid feb...only 1st appt somemore...hai hai... oic..that's gd to hear..so who have u signed up woth...mine include wiring...(estimated) kekke..divider is not that ex but the bar counter is a little...double the amt of the divider...but it's still k...we do want to separate the dining from the living...n the dining from the kitchen... Thank u...Hope the reno will go smoothly....
  17. Ya lor...agent has to play the part...esp when we depend on it...But my Ixxxx Agent..don't understand or simply being very ignorant..Argh...Oh ya toking abt windows...dun know whether can salvage mine...still have yet to go down to the place n take a look...Is it ex to change the windows? Yup we wanted the place to be more spacious in look...3 room flat can be small...especially comparing my current place...kekek... Yup we plan to start reno in Feb actually...now we dun think it's possible since the 1st appt is pushed to 13/2/09...hai very upset with the outcome...so our onli hope is if onli the seller can agree to move out before 13/2/09 so our reno can start rite away...we need to move in fast..imagine 6 pple in the hse...and staying at relative's place...that's alot of pple for a flat...Well we r just waiting for a miracle...
  18. Yup very true...but my Ixxxx Agent...haven't got back to me...I dun know wat's he's up to...Will wait till this week & c the outcome Thanks...Oh ya have u selected ur reno contractor... Mine is at 30K for now...still got plus..cos added some items...It gg over our budget....
  19. 3D Design of Our New Box...But of cos some amendments need to be made... Master Bedroom Kitchen Kitchen with Bar Counter View Living Area Common Room
  20. Ya i heard of some stories too...i always pray that mine will not go haywire ...at last mine will turn out like this...cos of negligence...my 1st appt is pushed...i wouldn't recommend the agent to anyone...Oh no!! Never... Ya lor luckily the agent dun dare...if the agent did...the story will be very different... hmm gd advise...will take note of it..hopefully the seller can compromise and work with us to get a gd solution...thanks
  21. ur agent gd...understanding...my agent is really dot...dot...dot...got no words to describe him...Yes it's Kenneth...gonna meet him this week for the 3D design...kekek Ya lor my agent really....argh... I am holding back his payment... n during my postpone 1st appt...he didn't dare to ask any payment from us...cos me n hubbie were very angry... We r asking the seller to move out early cos he's not buying any flat...hopefully he agree...yup true have to sign the imdenity letter...of cos with risk...we r waiting for any gd news to come... Just find that agents r never to be trusted no matter how gd they sound...
  22. Well this Agent of mine...is so clever on asking for $$$...but without doing his work...very pissed with him...Well the only worry for us...is staying at temp place for along time...our current home 2nd appt is 12/2..so have to move out before then...Our new home...2n appt will be in Mar..by the time reno kicks in...maybe we can shift in only in Apr or May...that's long....argh.... Well hoping all will go smoothly...this new home is really giving us a big headache ...so many problems...hopefully everything will be k soon....
  23. K some photos of new home...(existing condition)...not much cos photos taken from valuation report....Sadly our 1st appt has been postponed to mid Feb cos of our S***** Agent....Really frustrated...
  24. Congrats on moving to Pasir Ris... We r residing at the roundabout too...But unfortunately..we sold our flat and moving away to Tampines.. Nice area to live in..very quiet...nice environment...u can smell the sea breeze at times... Welcome aboard..!!Hope ur reno goes smoothly...Merry Christmas..!!
×