  1. Oh, u mean HDB may not approve? actually during my viewings i actually saw one house who did that and I think it's looks gd
  2. it's meant for the balcony...i love the opened up area, but if it rains, that area will be wet. I dun really like awning, so roller shutter is my next best alternative i guess.
  3. i went poh joo too...the sales lady was following us and asking whta we want and we say we'll discuss...then a guy (not sure if he's the boss) says "go serve them better". then she walked off to serve another couple buying basins. @^#(%&(% In the end, Hubby was pissed and walked off...he said never to go there again cos service was bad.
  4. Ivy, 2ft cabinet for the boys? no wardrobe?
  5. mrs piglet, i see that you are using closet design for your wardrobe which I am also considering. Do you mind telling me how big is your wardrobe and how much did they quote? I saw at modern living ehibition that they hv promo at $2k for 8ft nett...
  6. mind sharing your quote? I am interested to know th price too
  7. your house condition looks really good. I will also be doing veneer doors, they look nicer and classy enough. Wish everything will go smoothly
  8. ponytail, left a note on ur t-blog anyone has any ideas if a roller shutter is difficult to maintain?
  9. Thanks for sharing with me, ponytail I have always wanted pebblewash flooring for my access area...the only worry is the durability and practical maintenance.
  10. We got this inverter multi split from Toshiba. My mom is using this, and it is really quiet and the electric consumption is not too high too. Got this from All Best at IMM.
  11. I wana see the gorgeous photos too!
  12. pinkpetter, I am a very visual person. So, I will pdate with many photos! Easier also right I may be changing the bi-fold to tempered glass door on level 2 too. Level 1 still unsure. I am not sure if I want to use pebble wash flooring. I am afraid of the maintenance and durability compared to tiles.
  13. These are what I intend to do, but subjected to minor changes. DEMOLITION WORKS To provide labour to do chipping at access balcony. To provide labour to demolish existing floor tiles ****,dining room & balcony. To provide labour to demolish existing skirting ****,dining, study room & balcony. (Include plaster smooth affected area) To provide labour to demolish existing floor tiles at kitchen & 3 bathrooms. To provide labour to demolish existing wall tiles at kitchen, bathrooms 1 & 2. To provide labour to dismantle 1 set of existing wardrobe at master bedroom. To provide labour to dismantle 1 set of existing kitchen cabinet. To provide labour to dismantle existing wires & lightings at kitchen & 3 bathrooms. To provide labour to dismantle all existing sanitary wares at kitchen & 3 bathrooms. To provide labour to dismantle all existing ceiling work for whole house. To provide labour to demolish existing 1 panel of half-height wall with windows between study room & access balcony. To provide labour to hack existing round arch to square edge for all doors. To provide haulage services. (Loading of goods & materials) To clear & disposal of renovation debris. To supply & over-lay white pebbles with black polished homogenous steps at centre at access balcony. To supply & lay 600 by 600mm, polished, super gloss, anti stain, imported homogeneous floor tiles ****, dining room & balcony. To supply & lay 600 by 600mm, polished, super gloss, anti stain, imported homogeneous skirting ****,dining room & balcony. To supply & over-lay HDF laminate floor with skirting at study room. To supply & lay 300 by 300mm, matt, non-slip, imported homogeneous floor tiles at kitchen & 3 bathrooms. To supply & lay 300 by 450mm, polished, imported ceramic wall tiles at kitchen, bath- rooms 1 & 2. - 2 tones & up to ceiling height To supply & lay 2 layers of quic-seal 104 water proofing membrane at kitchen & 3 bathrooms. (HDB approved water proofing membrane) To supply & lay 1 layer of 3 in 1 water proofing cement screed at kitchen & 3 bathrooms. To raise up 1 no. of 50mm fridge & washing machine base with tiles finished at kitchen. To raise up 4 nos. of 50mm door kerbs with tiles finished at entrance of 3 bathrooms & kitchen. To raise up 2 nos. of 50mm shower kerbs with tiles finished at bathrooms 1 & 2. To supply & over-lay white pebbles with cement at entrance of bathrooms 1 & 2. To plaster smooth affected areas after demolished of walls at 3 bedrooms & study room. To provide labour to grind & varnish existing parquet flooring at 3 bedrooms & passageway. To provide labour to grind & varnish existing parquet flooring at steps to level 2. PLUMBING WORKS To supply & install stainless steel pipes for whole unit. (Cold points only) To supply & install inlet/outlet pipes for sink, washing machine & 3 nos. of wash basins. To provide labour to install 1 no. of sink at kitchen. To provide labour to install 3 nos. of wash basins at 3 bathrooms. To provide labour to install 3 nos. of sitting toilet bowls at 3 bathrooms. To provide labour to install 3 nos. of instant water heaters at 3 bathrooms. To provide labour to install taps & bathroom accessories at 3 bathrooms. ELECTRICAL WORKS (Exclude applying of PUB testing) To re-run existing wiring at kitchen & 3 bathrooms. To run wiring & install 30 nos. of lightings points. CEILING WORKS To supply & construct light pelmet & false ceiling **** & dining room. To supply & construct false ceiling at master bedroom. DOORS / GATE / WINDOW GRILLES / SHOWER SCREENS / ROLLER SHUTTLE To supply & install 3 nos. of 3 by 7 feet veneer doors with locksets at 3 bedrooms. To supply & install 2 nos. of 3 by 7 feet aluminium belglass doors at bathrooms 2 & 3. To supply & install 1 no. of 3 by 7 feet 10mm tempered clear glass swing door with handles at bathroom 1. To supply & install 1 no. of two-leaves solid nyatoh doors at storeroom. To supply & install 1 no. of 4 by 7 feet veneer main door with lockset & long handles. To supply & install 1 set of aluminium bi-fold doors with clear glass at balcony. To supply & install 1 no. of 4 by 7 feet design wrought iron main gate. (3 panels) To supply & install aluminium bronze/silver sliding window grilles ****, dining, balcony, access balcony & 3 bedrooms. To supply & install 1 set of wall to wall 10mm tempered clear glass shower screen at bath- room 2. (1 fixed & 1 swing panel) To supply & install 1 set of L-shaped 10mm tempered clear glass shower screen at bath- room 1. (1 fixed & 1 swing panel) To supply & install atuomated roller shuttle at balcony. CARPENTRY WORKS Access Balcony To design & fabricate 2 sets of 10 feet suspended bottom shoes cabinet c/w solid plywood, & laminate finished. Living & Dining Rooms To supply & construct 1 panel of 6 feet by full-height partition wall for TV area. To supply & install 2 pcs. of 4 feet wooden shelvings at partition wall for TV area. To design & fabricate 1 set of 5 feet bottom altar. Study Room To design & fabricate 11 feet full height storage cabinet c/w solid plywood, sliding doors & laminate finished. ($210 pfr) Bedrooms To design & fabricate 9 feet full height sliding wardrobe with glass & mirror c/w solid plywood & laminate finished at master bedroom. To design & fabricate 7 feet full height sliding wardrobe c/w solid plywood & laminate finished at bedroom 2. To design & fabricate 9 feet full height sliding wardrobe c/w solid plywood & laminate finished at bedroom 3. Kitchen To design & fabricate 35 feet top & bottom kitchen cabinet c/w solid plywood & laminate finished. ABS trimmings Design handles 1 chest of 4 sliding drawers 2 panels of sand-blasted glass doors 1 no. of 2 tier stainless steel dish rack To supply & install 15 feet L-shaped solid surface worktop. To provide labour to install 1 set of cooker hood & hob. Bathrooms To design & fabricate 4 feet suspended bottom vanity cabinet at bathroom 1. To design & fabricate 5 feet suspended bottom vanity cabinet at bathroom 2. GENERAL WORKS To furnish whole unit wall & ceiling with ICI or Nippon pentalite emulsion paint. (Up to 5 colours) Ceiling white colour. 3 coats with 1 white base coat & 2 colour coats. Include painting of all pipes, doors & door frames with gloss finish paint. To furnish oil base or water base sealant. (Depend on existing wall condition) HDB permit submission. To provide chemical washing & general cleaning for whole unit upon completion. ( x 2 ) To supply & lay paper roll protection on homogeneous floor tiles at level 1. To supply & install 1 no. of stainless steel flat-faced rubbish chute hopper at kitchen. Hehe...I wish to have...but I intend to have a play area for my kids too...so i will use the space on the balcony Yah...I was shocked when he told me 34k. That is why i printed a whole list for him to quote me. Hehe...if it's really 34k, I may add more things
  14. Ah Soon actually says mine shld be ard 34k. I really waiting to see if its so good to be true! haha...he called me today and says my quote will be ready in these 2 days...so shall see
  15. If it's really under 40k, I'll really be surprised. the total area is 154sqm, and i love the access balcony as it was quite long and spacious enough
  16. Hi Angel, I didn't call Mr Yeak in the end cos i am too tired sourcing le. So far 4 IDs, 2 contractors only...I will look at Ah soon's quote and decide from there.
  17. this is very nice...I hope ur contractor can meet the dateline.
  18. Over the weekend, we went to IMM to get the cooker hob, hood and oven from Mayer. Here's our buy.
  19. Yah...I thought the deal was pretty good too. But I will know when the official quote comes in. the flooring if from stairs to the 2nd floor...the parquet is well maintained and it was polished too, so i'll retain.
  20. Hi mister molly, true on the design, but the reno dollars also high too but the old design was 9 years old, so i intend to change almost everything to suit ourselves. ya...I contacted Ah Soon and hoping to hear from him soon. He says I can do my house with less than 40K, I am really anxious to see his quote
  21. We just had our first appointment last friday, and we are getting our keys on 13 April. Can't wait for that day! We have been sourcing around for quotes and buying items needed in the new home. Let's share our floor plan. Pics of the house we bought: The old house pics: Basically, all needs to go except the WI railings and the parquet on stairs and #2.
  22. Hi Angel, got your PM and will contact them soon I will do major on the first floor and redo bathrooms and MBR on #2.
  23. Hi Angel, I am also reading the blogs and chats...but due to the workload, i can't really go through slowly...so just trying to see if there are any recommendations. I have so far started contacting 4 since yesterday to ask for quotes...hope the outcome is positive.
  24. It's looks bright and airy nice views too! The house does look different when it is vacated...
×