Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

LQSL

Members
  • Content Count

    53
  • Joined

  • Last visited

Everything posted by LQSL

  1. Supreme Laminated Flooring Up + 1st coat of painting done, very dusty.. Bedroom Walkway Master Bedroom Bedroom 1 : As big as Master Bedroom Bedroom 2 : Medium Room Bedroom 3 : Smallest Room
  2. hihi, so far not bad.. can say to be 95%, next up with be my supreme flooring and my carpentary. Hope it can still hit the 95% range.. Lol.. Ya, my id quote me quite a reasonable price, I went down to at least 15 companies, out of so many, I selected Ken Home Design (Thomas) cos I find him more earnest.. Unlike some other IDs, everything also say OK, everything also add $$$, most are empty say only.. If my carpentary are up to my expectation, will surely recommend him in this forum.. Wait for my pictures ba!
  3. Homogenous Tiles after Acid Wash False Ceiling with Lightings Installed Kitchen Light Dining Light
  4. Hihi, how much did you buy the clock in your living room? Where did you buy it?
  5. Homogenous Tiling works all done. Left with laminated floorings for bedrooms. Wall Colors Choosen
  6. 2nd Bedroom Aircon Piping - The only piping in the common rooms. 1st Bedroom Aircon Location (Same as the masterbedroom aircon location) Aircon pipes coming out of the common toilet Master Bedroom Aircon Pipings
  7. Door Kerb Done Ceiling Done Master Bedroom Pelmet Done Stainless Steel Pipes Changed
  8. My mattress after "squeeze out" discount is less than 3K with very tall leather bedhead and divan set.. Lol.. Englander NaturalTech 4.. They say its their highest bed range already..
  9. Ya, think no electrical point is needed with this
  10. Hobz Hob and Hood Package $750 (Stainless Steel - 2 years Warranty)
  11. Renovation has just started. Kitchen Wall Hacked, some tiles are completed.
  12. Hi, whole building around 8 years old. 130sqm
  13. Eh, wahaha, I am "pandang" however, we commenced work (by doing the balcony) before the lunar 7th month. As advised by the geomancer, it is ok to start the renovation before 7th month, then the whole process drag into the 7th month
  14. Tomorrow will be the starting of the renovation. Hope everything goes well.. More photos will be up soon ^.^ New Update : Bed Purchased. Englander 15" mattress (they say it is their highest range mattress) and the emporer bedframe and divan.. Hope I didnt make a wrong choice!
  15. Ya, Thanks! Tiles already chosen.. Starting to lay tiles on 1st Sept. Haven take the photos of the tiles yet.. Next week ba.. Lol
  16. Eh, haha, starting 1st September ID says enough time to complete.. Haha.. Hopes so!
  17. Sofa from Uninnova (Sungei Kadut) $1207 3 Seaters Adjustable Headrest Half Leather (Italy) Mitshubishi Fridge from Gain City $999 2 Doors 510L Graphite Grey Mitshubishi StarMex Aircon from Creation Air $1499 x 2 System II x 2 sets for 4 rooms
  18. Thanks! Was quite excited about the whole thing. Lol. A lot of things are not finalised yet. *Faint* Need to finish the whole reno by end Oct. Haha.. Pray hard
  19. Proposed Layout Plan (Subjected to Changes) Glass Panel "Open Concept" Kitchen Feature Wall - Master Bedroom Feature Wall - Living Room 8Ft Feature Wall - Bomb Shelter Feature Wall - Dining Area
  20. Living Room + Balcony Living Room + Bomb Shelter + Dining Room
×