Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Goldlim

Members
  • Content Count

    60
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Goldlim

  • Rank
    Silver Member

Previous Fields

  • Renovator Engaged
    Zhiseng
  • Gender
    Male
  1. Thanks for the compliment... Been very busy recently... Last sat my furnitures arrived.. hardly have time to take photo.. went down today to take some photo. master bedroom wardrobe finally finished... by closet robe.. More pics to share..
  2. Huh really ar? but my fren used few years le still ok leh... dunno if gt pour hot water or not.. I think if pour then hold the hot water there long2 then may be not good lah. if pour the hot water then drain should be OK. After your advice I think every time pour hot water then have to flush with tap water..
  3. Thankss.. regarding the kitchen sink u din miss it. It was not there yet.. My kitchen sink is made together with the solid top. One whole piece de.. so coming together with the solid top
  4. Thanks for the compliment. of coz have to look pretty lah. otherwise will be heartache if spend so much money still looks normal.. At least I know the money spend is worth it.. hehehe
  5. We cook moderately.. we have to sacrifice out kitchen as we want to move the dining area into the kitchen space so our living is big... those guys were waiting for their boss to pick them up.. looking at the parking lots downstairs. hahaha is it? hehehe we make it small also so we dont need to move around much when cooking. all ingredients will be at the surrounding ...
  6. movin in tis sun... furniture comin tis sat.. hopefully everything works out well more pics for todae... kitchen cabinet in progress.. enjoy
  7. Thanks Thanks.. Hopefully reno can finish in time and all ends well..
  8. Indeed lor... But want whole house nice nice mah. bo bian lor.. whole house light cost me around 2.3K
  9. More pictures from master bedroom after today visit... Living room carpentry works in progress.. feature wall half way done... Feature wall finally up up.. almost done... Contractor measuring the depth and sticking laminate..
  10. The master bedroom and living room lights havent fully installed yet. The crystals not hanged yet. Also waiting for the cove lighting to be finished tomorrow. My living room (covelighting not installed yet) ...
  11. Master bedroom: Common rooms
  12. Yesterday went down... Lighting were installed halfway through.. Cleaning of floor was in progress. Today went down to take a look. Whole house was clean although the acid wash will be on tuesday. take a look at the lighting effect. Here are some of the pics taken today. Enjoy Part of the feature wall (Waiting for carpentry): Pics of master bathroom..
  13. Thanks.. Ya loh.. doing windows is always expensive. I also never think of changing it initially, but it was sponsored by in laws. Today lighting delivery and installation.. going down to take some pics today.. Hood and hob also delivered by today. Moving in on 18th of Jan
  14. Mine one toilet got 6 louver. three on each side. But the windows are joined together. so one panel
  15. Your windows are made of wrought iron or aluminum? I think that should be the case (based on square feet). although mine, my contractor never give me the details of how many sqft for my unit. I just told him that we want the whole unit windows replaced. Btw, my price also include window grills. My windows are all aluminum. Wrought iron will cost more. We also cut down alot from their initial quotation for the windows. Also, Casement windows cost more than sliding ones. Mine are the sliding ones, so cheaper. However, I feel that your louver windows at 2 bathroom slightly overpriced. Mine same as u but was quoted 250dlr for 2 bathroom. Just my 2 cent worth
×