m3wrx
Members-
Content Count
54 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by m3wrx
-
Welcome to Segar Road, Neighbour....I'm at Blk 466. Will be finishing the Reno soon. Hope to see more pics.
-
Hei Reiki..... I think Your Place is really fantastic. Love your Kitchen....Great design.
-
Thanks pinkpetter. I love the lightings too. But still got more to buy. (The dining and the 2 common rooms). I think Joven i quite reliable, so won't leak so easily. If don't box-up it's quite ugly, so we box up everything including all the aircon trunking
-
Joven Water Heater is Up. Wll need to box it Up soon. (JH25-25 Litres)
-
The Living Room The Room area The Master Bedroom The Study Area
-
Lighting and Doors are up. So far everything is going quite smoothly with just little hiccups here and there. Master Bedroom Door Mom's Sliding Door (She insisted on this hehehe) Lightings The Entrance
-
Balcony Forgotten to take the rest of the pictures caused busy talking hehehehe..........
-
Tiles for the Toilets are up and the false ceiling as well.
-
Nope didn't make the service balcony bigger. Everything is still the same size, only the Master bedroom slightly bigger.
-
Things We bought so far : De Dietrich Oven, Hood and Gas Hob Samsung Fridge Sony LCD TV FHD Hans Grohe Rain shower x2 Sinks for the Toilets (Duravit & Art Ceram) Blanco sink Joven Water Heater (JH25) Grohe sink mixer Grohe Basin Mixer x2
-
Change the doorway for the Kitchen. And the common toilet door to be in the living room instead of inside the kitchen. Easier for my in laws to go to the washroom during the night time hehehehe. Made the master slightly bigger by hacking into the other common room. Will post more pictures when it's possible.
-
Kitchen Before Hacking After Door way to the Rooms Before Hacking After Gosh Have been so busy I really didn't have much time to come to Reno Blog. It's been almost 2 weeks since I last seen the house but it seems to be going slow. They are done with Hacking, waiting for the cement to dry up before they can proceed with the rest Bought almost everything..but the list still goes on *sigh*. Will be going lighting shopping with my ID on the 23rd. Hope to update more when time permits. Till then....
-
Reno started on the 1st Dec Hacking of walls
-
THANKS...Can't wait till they really start hacking and all hehehehe
-
So Happy that we've finally found our ID. Should start work soon after four months of doing homework. Bought 2 rain shower last week from Hansgrohe. 20% offer was a good bargain
-
Bought The Simple Human Trash Bin. Original Price was about $168, after discount was $134. Good Bargain. Must Buy..
-
Some Drawings from the ID
-
Yes it's an Executive Apartment. The place is big but rooms are quite small *sigh* Hi Hi Neighbour..Yeah husband and I got it from HDB and it's been around for 6 years liow. We haven't really check the tiles and all...looks alright to me though hahahaha. Hahaha...My mother in-law fell in love with the windows too. It's full lenght for the whole house including the rooms.
-
Hmm...It's Exciting seeing people doing reno from scratch to something so beautiful. How amazing it can turn out. I'm waiting to find the right ID and I can start doing my Reno too. Pictures Of my Place Entrance Kitchen Living sand study area
-
Love the Design Reiki....Like it Bright. Hope I'll be able to post more pictures here once my place is done up too.