Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

findclarence

Members
  • Content Count

    13
  • Joined

  • Last visited

Community Reputation

0 Neutral

About findclarence

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male
  1. Hi All, I guess my uploaded photos not not have significant changes.. Therefore, I will upload only those major changes for viewing interest...lolz. Ok, This is the Bath Tub partition which is created: Cant wait to see the finished product... The laying of flooring tiles : Kitchen Floor tiles : hope u can see the black tiles which will border the kitchen...
  2. PM me so that I can give u his contact. Cheers!
  3. Yes yes, little princess wanabe...lolz.. My toilet is small, so no choice... Hee... hope to have a cosy feeling when in bedroom thus the yellow combination...lolz. Ok, more pic on my unit... Wiring @ Living room Wiring @ MBR Toilets Service Balcony Area Kitchen Area
  4. Hi all, Some design I have done for the contractor: MBR Toilet Design, initially want to include a bath tub for the toilet, but due to the small area, no tub can fit. thus we asked to build up a tub (tank ...lolz) as replacement... Here are the colour scheme which I have selected : More Pic update coming soon.. 10 more days to unit handover... cheers!
  5. Debris Cleared: Toilet...eerk! MBR MBR Toilet Future BB room.. Living Room. Kitchen Area The real work starts... Living Rm Service Balcony Kitchen Wall; Initially we planned for a half height mirror to be on this wall, but the cost is high n serve not much practical purpose, so we decided to abolish the idea... hee... re-wiring work ... halfway done..
  6. My wife intend to keep her woks etc into the drawer... also city gas so no gas cylinder... (scare got cockroaches attached to the tanks...)... Anyway, 2 more weeks to my reno completion delivery...
  7. Hey, Ur unit looked like mine but yours is larger lah..... especially the kitchen its the same layout... hope to share reno ideas... Cheers My reno link is http://www.renotalk.com/forum/index.php?showtopic=18176 if u wan to see my kitchen before state...Cheers!
  8. Hi All, Some 2D Drawing from Contractor to show you... Firstly, The following are the 2 Aircon System whihc I will get... The System 2 is for Living Rm n Kitchen...System 3 are for the 3 Bedrooms: Kitchen Area: TV Console MBR Cabinet Sorry for the resolution... Share Share Share... Cheers!
  9. Hi All, No 3D drawing... Getting a Contractor straight does not provide for good 3D drawing... they often show me only 2D drawing... More Pic to Share The Hacking and Demolision work starts!.... Hee Study Room... Living room area Another view from Living Room Kitchen Area... Finally all the tiles n old cabinets are gone... Old windows grills are gone... Cant imagine How much debris a house can have... Okay, more coming up...
  10. Yes nesh, Its a total Tranformation lolz... -------------------- Type: HDB 4A 108 sqm ID: No ID, Direct Contractor Est Total Cost: ~45,000++ including purchases below & Aircon Reno Start: 12.11.08 Reno Completion: est 17.12.08 Move In: 19 ~ 20 Dec 08 Purchases: - Electronic Product: (Harvey Norman @$3833) > LG 42" LCD TV (ext warranty) > LG 32" LCD TV > LG 22" LCD TV > LG Home Threatre System (4 standing speaker) > 2 x LG DVD Player - Aircon ($5200 including bracket & installation) > Mitsubishi Inverter System 3 (for bedrooms) > Mitsubishi Non-Inverter System 2 (for Living & Kitchen) - Rain Shower ($350) - 5 Ceiling Fan (~$400) - 5 Lights (1 Store, 2 Toilets, 1 Kitchen, 1 Service Balcony) (~$240) - Whole Unit Grills, Gate, 2 bifold toilet door, Kitchen window & Masterbedroom windows ($3250) [color=#3333ff]
  11. Hi all, Lets see the original state when we visit the unit on our first visit... Built in cabinet at bedroom... Service Balcony Bedroom window area Common Toilet Kitchen.... ok, Thats all for now, next post is on emptied unit:... Cheers! Hi All, Now for the Pic after the unit is being emptied: Bedroom 2 Storeroom Bedroom 3 ... future study room Master Toilet Master Toilet again More Coming up.... Masterbed room flooring Common Toilet Common Toilets... Lots of exposed pipings Service Balcony View On Kitchen right On Kitchen left Living Room Living Room again Ok for your comments if any! Cheers!
  12. Hi all, Will like to share my units' renovation journey with all of you. Hope that everyone can comment on things to lookout, Cheers! Firstly my floorplan: Its a resale 4Rm unit @ Bedok Reservoir, 12yrs of age, 108 sqm.
×