  1. Room cabinets up today. A lot of coordination with electrical and carpenter.
  2. Fans and lights are up!
  3. Hard to look for sleek looking stainless steel toilet fittings. Finally found it at Asia Excel. Not cheap though?
  4. Got our toilet bowl and stuff from Kian Shen at AMK. Good price and ladies there were very patient and knowledgeable. They allowed us to plow through their catalogues to slowly choose. Didn't know it will take so long
  5. Hall cabinets almost done!
  6. Cupboards coming in!! It’s a war zone!
  7. Mitre Joints for the tiling work. No joint lines:)
  8. Plastering is done!! Super smooth and classy!
  9. Very nice wardrobe. Did you knock down one room to accommodate this?
  10. Box up all done to hide all the aircon trunking!! Resale flats are a pain to do wiring, piping and trunkings. Box up cost is
  11. Drove all over Singapore to find a nice dining table, and just when we were about to give up, we saw this table at 5.55pm. Shop sales person stayed back to serve us and we bought it. Whew!!
  12. ID brought us to JB to do shopping. We navigated a 2 hour jam to come back. Super tired. We got our sofa from JB, we got it customised without the L and has an awesome feature, the leg segment can slide out and it’s Ultra comfy. Saved about 1k from local price. We also got our lights and ceiling fans too. The price difference is too attractive. Super deals available in JB.
  13. Painting Work started today. So far so good. Whew!
  14. All piping done. Box up done to conceal the pipings. Now to finish the tiling. Go go go!
  15. Partitions done and door frames up.
  16. Hole cut in the glass to have the exhaust fan for the toilet.
  17. Thought it will be good to have new pipes. Stainless Steel Piping in progress. Unfortunately older flats need to have exposed piping.
  18. Boxing up the ugly aircon trunkings. Window replacement in progress
  19. Screeding of the wall starts. It’s a slow and labour intensive work.
  20. Changing all the windows now. Cost more than I expected. Guess it comes with resale flats.
  21. Tiling all done! Looks very classy and they even did the mitre joint for the tiles!
×