

luckable
Members-
Content Count
216 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by luckable
-
Woo Hoo !! I just log HDB website to check my status.. Stated "Your appointment to sign the Agreement for Lease and Take Possession of the new flat is on 30 Oct 2008." This means i can get my key on dat day ???? Anybody can help ???
-
ohhh. we will be locking our dog in the kitchen and hopefully he will be good enough to pee & poot poot in the toilet cause part of the reason we reserved the squatting toilet bowl is because if he pee & poot, we can just use water to rinse into it. and then my dog's fur shed like nobody's business, need to buy a super duper powerful vacum to clean everyday.
-
Heehee no.. it's from Inzen...
-
heehee.. yes.. After comparing with 5 other ID company, i'm quite happy with this quotation. Last week the ID also went to my place to check the condition of my flat, the kitchen floor tiles we dun nd to hack just overlay.. can save some money..
-
Hope my dog dun anyhow pee on the sofa.. Below is the final quotation.. Total reno cost $34,750 Demolition Works 1) To hack off existing floor tiles for living,store room and 2 bedrooms 2) To hack off hollow block wall door and frame for storeroom 3) To hack off hollow block wall at master bathroom 4) To hack off existing wall finish @ 2 Toilets 5) To hack off existing floor tiles @ 2 Toilets 6) To hack off door frame and door for 2 Bedrooms 7) Chipping for top half of wall at kitchen wall 8) Haulage/Loading and unloading of material 9) Clearing of debris under renovation Masonry Works 1) To supply and lay 600mm x 600mm polished homogeneous tiles with skirting for living/dining,store room and 2 bedrooms only. (Tiles price up to $3.10psf)(Area -680sqft) 2) To supply and install new 3ft x 7ft solid naytoh doors frame for 2 bedrooms 3) To supply and overlay 12" x 12" unpolished homogeneous tiles for kitchen flooring 4) To do water proofing for kitchen floor 5) To cement screed top half of kitchen wall 6) To plaster smooth on to cement screed and existing wall tiles at kitchen wall 7) To construct cabinet base with side tiles 7) To construct fridge and washing machine base with tiles 8) To supply and lay ceramic/homogeneous wall tiles for 2 toilets 9) To supply and lay 12" x 12" unpolished homogeneous tiles for 2 toilet flooring 10) To do water proofing for 2 toilets floor 11) To supply and install new stainless steel rubbish chute 12) To make good hack off wall at storeroom 13) To supply and contruct L-shape wall at using 63mm hollow block at master bathroom 14) To top up partial flooring at dining and master bathroom using epf (Tiles price up to $2.60psf for kitchen and 2 toilets wall and floor tiles) Aluminium/Timber/Glass Works 1) To supply and install 1nos of white powdered coated aluminium bi doors for common bathroom 2) To supply and install 3ft x 7ft wrought iron gate for main entrance 3) To supply labour and material to reinstall existing doors for 2 bedrooms c/w new stainless steel lever handlers 4) To supply and install 1 set of design 3ft x 7ft veneer main door c/w lock set for main entrance 5) To supply and install aluminium bronze/sliver frame windows grilles for whole house except 2 bathrooms (Area -104sqft) 6) To supply and install 10mm thick top hung tampered clear glass (1 fixed c/w 2 sliding doors) c/w metal support at kitchen entrance 7) To supply and install L-shape 10mm thick tampered clear glass shower screen c/w swing door at master bathroom 8) To supply and install 1nos of frosted 10mm thick tampered glass swing door c/w lock and stainless steel H-Handler for master bathroom entrance 9)To supply and install new bronze adjustable louver windows for 2 bathrooms Plumbing Works 1) Whole house change to stainless steel pipes 2) To supply labour only to install 2 nos toilet bowls 3) To supply labour only to install 2 nos wash basins 4) To supply labour only to install kitchen sinkl including connection of inlet and outlet pipe 5) To supply labour only to install 1 nos storage heater 6) To supply and install washing machine tap 7) To supply labour to install 2 spray jet for 2 bathrooms 8) To supply labour to install 2 set of bathroom acc 2 bathrooms 9) To run 2 nos of hot pipe for 2 shower area Cornices/Painting Works 1) To supply and install L-Shape false ceiling c/w cove lighting at foyer,living room and master bedroom 2) To supply and install false ceiling for dining room (Price include box up piping **** room) 3) Painting for whole house using ICI/Nippon paint including all frames and piping 4) Plastering for whole house and ceiling except those while tiles Capentry Works Kitchen 1) To design and fabricate top & bottom kitchen cabinet , finish in laminate with solid plywood , include handles, drawers, cutlery tray and 2 nos Glass Doors (L-28ft) Price include 1nos of tall unit and box up piping. 2) To supply and install a stainless steel dish rack 3) To supply and install stainless steel sheet for kitchen cabinet work top (L8ft X 2ft) 4) To supply and install stainless steel backing in between kitchen cabinet(L-8ft X H-2.5ft) 5) To design and fabricate full ht divider finish in laminate and frosted glass in between washing machine and kitchen cabinet(L-700mm X Full Ht) Bedroom 1) To design and fabricate full ht built in wardrobe finish in laminate c/w sliding doors for master room(L-10ft X Full Ht) Living Room 1) To design and fabricate full ht shoe cabinet finish in laminate **** room beside TV console(L-4ft X Full Ht) 2) To design and fabricate low suspended TV console finish in laminate **** room beside shoe cabinet(L-6ft) Electrical Works 1) 7 nos of new 13A X 2 new double $50/pt 2) 5 nos of new 13A X 1 single plug $40/pt 3) 3 nos of new SCV pt $90/pt 4) 2 nos of new heater pt $90/pt 5) 1 nos of new 15a X 1 air con pt $90/pt 6) 1 nos of new tel pt $45/pt 7) 2 nos of new earth pt $70/pt(For water pipe and earth pipe) 8) New MCB main db box $300/set 9) 22 nos of new lighting pt (Prices include switches) $30/pt 10) 22 nos of installation of light $10/pt 11) 1 nos of connection heater wire $30/pt 12) 1 nos of new hood pt Miscellaneous 1) To lay protection cardboard for living and 2 bedrooms 2) Acid washing and general cleaning for whole house
-
thanks .. i bought this 3 seater for $1240..
-
GOOD NEWS!! After waiting for so long, 2day we got the letter from HDB.. Our AHG approved!!! We got a $20k grant.. Very soon we can get our keys and start reno..
-
Just back from Marina Square John Little sale, we bought 2 sets of Akemi bed sheet, 2 pillows & 1 quilt all at $267 coz they're having 30% off + 30% rebate...wooohooo. after that we went to king koil shop for a walk and eventually bought a 3 seater white half leather sofa after comparing it with the black half leather sofa behind it...
-
Hihi.. how much u paid for this hob? look nice...
-
hi jasch, may i noe how much u bought ur sofa ??? Looks nice..
-
The other will be study room.. actually wanted to hack the wall to combine into 1 big MBR but scare nxt time sell no value.. Haiz.. just called up HDB to ask abt my AHG.. Oready more den a mth and they tell me still processing haven approve.. Y they take our money so fast but they give money so slow ?? hahaha... My dream kitchen Hope my kitchen can do like this.. white cabinet with stainless steel top and backing..
-
and very notti also... hahaha..
-
Ya i agree with u.. most impt is the owner like it.. many id told me stainless steel top no gd but i still like it coz i work as a chef.. i love stainless steel..
-
the living room quite nice.. but the kitchen abit dark.. i prefer my kitchen to be white with stainless steel counter top but Roy haven get back to me on dat..
-
Hi neighbour, i staying at blk 107, just beside u.. hahaha.. ur hse very nice !!
-
yeah, chong pang is nice. very convenient but pretty far from MRT station and stupid to take bus because just 2-3 bus stops away. but no more worries for breakfast, lunch & dinner. we just have to take lift down and walk not more than 50 steps can buy food already! MUHAHAHA...
-
sorry, wrong post.. any moderators can delete this? Thanks..
-
We have been waiting for the AHG for a month time but no news yet. SO FRUSTRATING! called HDB to check the status of our AHG but they patronize us...what the. i wonder when r they sending us the status of our AHG. so far we have met all of the ID of our choice, real tiring!!! esp sitting and repeating what we want to each ID, i respect those who have 10 IDs on their list. RESPECT!!! some ID talk way tooo much, i know i'm bad but i really can't stand until...i keep checking on my hp, get ready my handbag and give a nonchalant look. muhaha. final quotation is really about 34K. now we'll have to go up to our new flat with ID to see any defects, hopefully not then we'll be able to save a lot! apparently, hubby wanted to box up toilet pipe but after serious thinking, it's really redundant so he finally gave up on that boxing up but he insist on having stainless steel top which our ID says none of his customer requested that so he doesn't know how to put up one. -_- then how?! if find an ID, ID also dunno...what i do?! our dream kitchen is STAINLESS STEEL KITCHEN. sleek, OK! but way too ex...talk is cheap! anyway, we've pretty much decided on our kitchen appliances. ta dah!!! microwave oven
-
Wat the HDB officer told me abt the "Quarterly sales" is dat dun care u first time apply or u apply many times, the chances still the same.. Ballot by computer, so hv to see ur luck... We r quite lucky, first time queue no 130+ but no chance to select flat den 2nd time we got queue no 80+ When we go down to select flat, we only left with Yishun.. We wanted to give up our chance den the officer say if we give up and ballot again, nxt time we wun be so lucky to get a good queue no.. So we bought our Yishun 3rm flat for $130k..
-
Hi, Instead of doing solid surface for kitchen cabinet, anyone noe how much is it to do stainless steel top ??
-
Hahah.. ur dog is cute !! This is my notti spitz !! LOL !
-
heehee... i think when ur reno finish, mine just start... hahaha... any 3D to share ??
-
yes.. http://www.renotalk.com/forum/index.php?showtopic=16609
-
Oh ic.. I think we going to sign with Inzen.. Our quotation abt $36k.. Post more pics... heehee..