yup. now have unpack everything. still have some minor works this friday to rectify all defects. till all defects done then will post pictures.
-
Have shifted in last saturday. look at the mountian of bxes. 40 plus of them in the living room.
-
Today went down again to check on progress, it was like a war zone. Electricians fixing the power sockets, lightings and fan, while the painters were painting the house, and the MBR shower screen was being fix by another group of people. My ID said he tried to finish by this thursday and i really hope for the best he can do it. Most of the carpentry will be installed this wed.
-
yup smell very strong, see a while left liao. Everything should be up by tuesday (i hope).
-
this afternoon went down to take a look. The bedrooms paquet floor been sand down and varnished. Painting still in progress. Hope to see most things to be up on monday.
-
your eyes are good, the picture not so clear you also can see the design...
-
which one you refer to , the grey with many circles or the glossy one with lines?
-
1/4 pack...still got so many things
-
your quote seems high. my 5rm spent last than $40k to reno.
-
Just now went up to new house at 7 plus, very dark lights not installed yet. Using my hp torchlight able to figure that the bedrooms are painted, the marble flooring is polished. Oh, my main gate also changed. Hope tomorrow can see more progress.
-
L box for living amd dinning done, MBR almost done.
-
like that died liao... got sensitive nose measurement and construction all done, just waiting to install in house.
-
tell him almost everyday, the answer always "can lah"... still got things not done yet: 12) main gate 13) polish marble flooring 14) sand and varnish palquet floor
-
Today went down to check on the progess (going everyday), many items not done/completed yet. Now i have serious doubt that my reno can complete on 17 dec but i have to move in on 19 dec (feng shui). Things not done/completed yet: 1) painting 2) MBR L-box 3) both toilets shower screen 4) kitchen entrance sliding door 5) kitchen carpentry 6) service yard window and door 7) MBR toilet vainty top 8) MBR wardrobe, tv shelf, study table and divider 9) shoe rack cum divider 10) living room tv feature wall 11) all lightings haizz, the list so long. Really hope he can do magic and complete everything by 17 dec.
-
yup, buy the shower set foc the storage heater. tiling takes around two week to complete.