mwerkz
Members-
Content Count
994 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by mwerkz
-
erms.. but i doubt i will have this prob la. cos basically my hm is everything old all go. so all stuffs are buillt from scratch n done thru my ID. so anything spoil cannot blame me n say de thing was originally spoiled. cos everything is new from them (not sub-contract out by myself). if spoil means they give me lousy thing, n cannot expect me to pay for the damages
-
maybe din upgrade insulation, piping n no need the s/s brackets? cos my sys 3 inverter was actually 2799+120(insulation)+60(piping)+150(s/s bracket)+foc(5yr extended warranty)
-
den u shuld use white for ur solid top?
-
erms. by right not ur fault, shuld not be u pay? i havent get my VO, so i can't comment on what my ID will be asking me to pay?
-
wow. i love ur dining set. simple, clean n sleek. de living area oso. de floating tv console n the sofa = a perfect combination
-
hehe. u r abt 1wk+ ahead of me in terms of schedule. i'm somewhere in de plastering stage. electrical starting on friday.
-
yup. winter n red apple is de same
-
hehe. thanx all. reno seems to progress quite nicely now. as for pics? the next time i'll post pics shuld be sat liao. cos wun have time to visit my place till sat when i go meet my ID. by than masonry work shuld complete, plaster oso likely to have been completed. shuld be at electrical n pumbling works stage, juz the laying of cable n installing of new water pipes, so i guess wun be able to see much in pics
-
ya. tat was my main concern the first time i saw the floorplan too. dun really like to see trunking running all over the place
-
hehe. as i was still on off today, i dropped by my home to take a look again. so it's pic time again! plastering begins: (dunno wat's dat they lay along the walls) my smooth wall in bedroom 2: (dunno y de workers only manage to do up like 2/5th of one room in de whole house ) my old wall: (see so ugly n dirty with all the spots ) yeah! wall tiles in mbr completed: (left with flooring to go) see my new wall in kitchen erected n with tiles: (new accomplishment!! a little more tiling for the wall in kitchen to go before they are done) tiling for my island cabinet base completed: ops. realise my kitchen behind the wall not laid with floor tiles yet: (so sad ) common toilet flooring done: (ops. realise one tile still not up )
-
erms.. so my 8ft at 960 is overquoted. zzz. ok lo. anyway i still thinking whether or not to do
-
previously was 2288 for r410 unit. but i went to cancel it, use de deposit to buy a washing machine. den purchase a new aircon mit sys 3 inverter at 3129 comes with 5yr extended warranty, upgrade copper pipe, insulation to 1/2" n s/s bracket. i think more worth it?
-
seems like all the tiles i selected are pretty popular hehe. electrical works will begin this friday! but for the new lights to all go up, that'll take another 2more weeks? anyway my lights are all pretty simple. no fancy lights. juz bright enugh to light up the house. so sometimes i still wonder y i m spending like 1110bucks for lights not inclusive of the cost of t5/t8/floresent lights, cos for those i got my electrician to buy
-
hehe. actually all the tiles equally nice. but must let them clean up the tiles n install the lights first. now too dark still hehe. ya. cos we're all lucky to meet kind ID =p
-
hehe. thanx. will check out those shops. but u got the price breakdown?
-
u mean this one? actually the cost of this decorative tile is the same as the rest of the mbr common tile. 3.60psf. definitely not as expensive as my common bathroom decorative tiles love this the most. with both toilets almost completed. i m happy but today daddy drop in with me to see the flat, initially din wan let anyone come in, cos too much black tiles, scared kena scolded. haha. heng he nag awhile he tired liao
-
wow. 1.2k? how big is the table? i was quoted 960 for 8ft study table. still considering whether to do it.
-
omg.. so nice.. esp love ur cement screeding wall n floor at the foyer. de dining chair looks so comfy. where u got the following items n how much 1) main entrance carpet 2) dining chair 3) entertainment room bean bag couch 4) kitchen red man (wat's tat btw?) 5) common toilet sink+cabinet
-
since i was on off today, decided to drop by my new home to see the progress. kinda surprised to see so much work done just from 1+ i left my flat on sat till today anyway work done today (1day): - forget to check if all the skirting done up - approx 50% of wall tiling done in kitchen - approx 95% of floor tiling done in kitchen (left with the cabinet base for the island) - common toilet fully tiled on wall n floor (except the mosaic again ) - all electrical wiring removed (i think electrician oso pulled some new wires for the workers to on one light) - approx 60% of wall tiling in mbr bathroom done up at the speed things are going, it shuldn't be a problem to complete masonry work by wed so for now, it's pics time! tiling begins in the mbr bathroom: closeup on the tiling worksmanship: my decorative tile for mbr bathroom: my kitchen flooring done n laid with some protection sheet n lots of dust!! suspended cabinet base laid with tiles at the side: (left with island cabinet base tiles to be done for kitchen flooring) flooring for common bathroom oso done: (whole toilet done! except for the mosaic)
-
Impress21 Design And Build - My Home Makeover
mwerkz replied to oogachaga's topic in Reno t-Blog Chat
wow. de marble look brand new now -
ya. i oso love ur study. how much u paid to customise tat table?
-
wow. very relaxing. feels so cosy =)
-
this wk oso ok ma. de gain city fair prices went back to all gain city showroom =p
-
hhaa. interesting. devil or angel. get 2 n put side by side
-
hey. nice n cheap clock. where did u get it from/