Chubbs
Members-
Content Count
7 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout Chubbs
-
Rank
Member
Previous Fields
-
Gender
Female
-
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi Chronograph and all, Here's my quote from Prestige for the 42K Design Services Space planning and furniture layout F.O.C Design Consultation F.O.C Material and colour proposal F.O.C Perspective drawing on carpentry works F.O.C Site supervision F.O.C Demolition Works Supply labour & tools to Dismantle of existing toilets bowls and wash basins for 02 toilets. $120.00 Supply labour & tools to Dismantle of existing kitchen cabinet. $150.00 Supply labour & tools to Dismantle of existing toilets doors. $120.00 Supply labour & tools to hack off existing floor tiles @ 02 toilets.(Upper Floor). $250.00 Supply labour & tools to hack off existing floor tiles @ kitchen. (Lower Floor). $380.00 Supply labour & tools to hack off existing wall tiles @ 02 toilets. (Upper Floor). $420.00 Supply labour & tools to hack off existing wall tiles @ kitchen. (Lower Floor). $480.00 Supply labour & tools to hack off existing floor tiles @ balcony area. (Lower Floor). $220.00 Supply labour & tools to hack off existing floor tiles @ wash area. (Lower Floor). $180.00 Supply labour & tools to hack off existing wall Tiles @ wash area. (Lower Floor). $250.00 Supply labour & tools to hack off existing floor tiles @ living hall. (Lower Floor). $560.00 Supply labour & tools to hack off existing floor tiles @ Dining, foyer & Utility area. (Lower Floor). $640.00 Supply labour & tools to hack off existing floor tiles @ stairscase & landing area. $240.00 Supply labour & tools to hack off existing floor tiles @ passage way. (Upper Floor). $100.00 Supply labour & tools to hack off existing skirting @ master & common bedrooms. (Bedrooms 2 and 3). $180.00 Wet Works Supply labour & material to lay K11 waterproofing & up-turn 0f 150mm from floor to wall level @ kitchen, $280.00 Wash area & Balcony. Supply labour & material to lay presure grout waterproofing & up-turn of 150mm from floor to wall level @ $350.00 Kitchen,Wash area & Balcony. Supply labour & material to lay 3in1 prepack waterproofing membrane & up-turn of 150mm from floor to $380.00 wall level @ Kitchen, Wash area & Balcony. Supply labour & material to lay K11 waterproofing & up-turn 0f 150mm from floor to wall level @ 02 toilets. $180.00 Supply labour & material to lay presure grout waterproofing & up-turn of 150mm from floor to wall $240.00 level @ 02 toilets. DESCRIPTION Supply labour & material to lay 3in1 prepack waterproofing membrane & up-turn of 150mm from floor to $280.00 wall level @ 02 toilets. NOTE: The above waterproofing material are approved by HDB. Supply labour & material to cement screed floor area @ living hall. $450.00 Supply labour & material to cement screed floor area @ dining, foyer & utility $550.00 Supply labour & material to cement screed floor area @ passage way. (Upper Floor). $240.00 Supply labour & material to cement screed floor area @ stairscase & landing. $350.00 Supply labour & material to lay 600x600mm honogeneous polished floor tiles @ Living hall. $750.00 Supply labour & material to lay 600x600mm honogeneous polished floor tiles @ dining, foyer & utility. $920.00 Supply labour & material to lay 600x600mm homogeneous polished floor tiles @ passage way.(Upper Floor). $380.00 Supply labour & material to lay 600x600mm homogeneous polished floor tiles @ stairscase steps. $480.00 Supply labour & material to lay 600x600mm homogeneous polished floor tiles @ stairscase Landing. $320.00 Supply labour & material to lay ceramic/homogeneous anti-slip floor tiles @ Kitchen & Wash area. $680.00 Supply labour & material to lay ceramic/homogeneous anti-slip floor tiles @ 02 toilets. $480.00 Supply labour & material to lay pebble wash @ Balcony floor area. $450.00 Supply labour & material to cement screed wall @ Kitchen & Wash area. $600.00 Supply labour & material to cement screed wall @ 02 toilets. $520.00 Supply labour & material to lay ceramic/honogeneous wall tiles up to ceiling height @ Kitchen & Wash area. $1,380.00 Supply labour & material to lay ceramic/homogeneous wall tiles up to ceiling height @ 02 toilets. $1,150.00 Supply labour & material to cement smooth skirting area @ master & common bedrooms.(Bedrooms 2 & 3). $240.00 Supply labour & material to construct kitchen cabinet base finishing with matching tiles. $120.00 Supply labour & material to construct washing machine & fridge base finishing with matching tiles. $100.00 Bedrooms Floor Works Supply labour & material to overlay laminate floorboard @ master bedroom. $450.00 Supply labour & material to overlay laminate floorboard @ common bedrooms.(Bedroom 2 & 3). $580.00 Supply labour & material to install lamiante floor skirting @ master bedroom. $280.00 Supply labour & material to install lamiante floor skiritng @ common bedrooms. (Bedroom 2 & 3). $350.00 Plumbling Works Supply labour & material to re-run stainless-steel cold water piping for kitchen, wash area & 02 toilets. $800.00 Supply labour & material to install 02 nos of toilet bowls @ master & common toilets. (Upper Floor). $760.00 Supply labour & material to install 02 nos of wash basin @ master & common toilets. (Upper Floor). $260.00 Supply labour & material to install 01 nos of wash basin @ Wash area. (Lower Floor). $130.00 Supply labour & material install 02 nos of instant heater @ master & common toilets. $480.00 Supply labour & material to install 01 nos of stainless-steel double sink @ kitchen. $280.00 Supply labour & material to connect inlet/outlet piping for 03 nos of wash basin @ 02 toilets & Wash area. $90.00 Supply labour & material to connect inlet/outlet piping for kitchen sink & washing machine. $60.00 Aluminium & Door Works Supply labour & material to install 02 nos of aluminium bi-fold door @ master & common toilets. $360.00 Supply labour & material to install 01 nos of aluminium bi-fold door @ wash area. (Lower Floor). $180.00 Supply labour & material to install aluminium casement windows with tinted glass for whole house. $3,620.00 Supply labour & material to change 02 sets of aluminium loovre windows for master & common toilets. $480.00 Supply labour & material to install aluminium window grilles for whole house. $1,620.00 Supply labour & material to install 03 nos of veneer designer doors c/w lockset & stopper for all bedrooms. $960.00 Note: Frame colours for Aluminium windows & window grilles - (Bronze or Sliver). Carpentry Works Design fabricate & to install 27ft laminated solid plywood with internal white PVC kitchen cabinet c/w $2,906.00 postform worktop, designer handles, ABS trimming, dish rack, cuterly tray & 01 glass panel. ($118 P.F.R). Note: Promotion for Kitchen cabinet ($90 P.F.R for the first 10ft). Design fabricate & to install 7ft laminated solid plywood with internal white PVC sliding wardrobe @ $1,540.00 master bedroom. ($220 P.F.R) Design fabricate & to install 7ft laminated solid plywood with internal white PVC sliding wardrobe @ $1,540.00 common bedroom. ($220 P.F.R) Design fabricate & to install 7ft laminated solid plywood with internal white PVC Feature wall @ $1,260.00 living hall. Design fabricate & to install 7ft laminated solid plywood with internal white PVC TV console @ $1,120.00 living hall. Painting Works Supply labour & material to do whole house plastering smooth using plastering compound. $2,600.00 Supply labour & material to paint whole house using Nippon 3in1/ICI Duluxe including of painting all $1,520.00 exposed pipes, doors & door frames. Electrical Works DB Box 12 way to 16 way - ($420) Per Point- Lighting point $43, Single power point $58, Double power point $74, Telephone point $58, N.A Aircon point $110, Heater point $110,SCV point $120.(For Additional Point). Other Supply labour & material to do Acid washing for whole house. $350.00 Lay corogated paper @ newly tiles area. F.O.C HDB Permit Handling Fees. F.O.C Haulage Uploading of goods, sands & material to jobsite. $350.00 Downloading of debris clearing offsite using container/truck after renovation. $450.00 Total $41,536.00 NOTE : Exclude any other dismantle costs Optional Carpentry Works Design fabricate & to install 7ft laminated solid plywood c/w frosted glass door sliding wardrobe with $1,995.00 aluminium trimming @ master bedroom. Design fabricate & to install 7ft laminated solid plywood c/w frosted glass door sliding wardrobe with $1,995.00 aluminium trimming @ common bedroom. Window Grilles Supply labour & material to install wrought iron casement window grilles for whole house. $3,180.00 Supply labour & material to install wrought iron fixed window grilles for whole house. $2,920.00 Stairscase Works Supply labour & material to install wrought iron design railings support for stairscase. $2,180.00 Supply labour & material to install timber handlers railing for stairscase. $780.00 -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi, I just got a quote from Prestige Image. I am doing quite a major overhaul. Hack everything except for bedrooms , redo whole kitchen n toilets, balcony my quote from them was abt $42K -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Wow, the valuation so high man Btw, some posted Collin from prestige image as a good ID. Any reccomendations abt him cos although the company seems to have a bad image? -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi Virgo, O, I know where. Do u mind if I ask u how much roughly u paid for it? -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi Virgo, Oh, I did some research too U bought a Jurong East EM? I was aiming one at blk 410 , but it was sold after I called Owner wanted 45K COV but I managed to get it at 30K COV. Basically, there are parks and bbq facilitites just beside my blk and there is an EC development just a few blks away in the same EM estate. Am glad to find so many Jurong EM owners here. Looking forward to sharing of ideas... -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi Hi,I wanted to buy around blk 471 too. But husband says that the traffic lights there too many... I bought after the Jurong Lake development Just sign the option to exercise 2 days ago. Is the price reasonable? I thought it was quite reasonable for 150sqm and undergoing lift upgrading.... Hi Hi,I wanted to buy around blk 471 too. But husband says that the traffic lights there too many... I bought after the Jurong Lake development Just sign the option to exercise 2 days ago. Is the price reasonable? I thought it was quite reasonable for 150sqm and undergoing lift upgrading.... -
Mansionette Owner
Chubbs replied to tristesse's topic in HDB New/Resale Flats, Executive Condominiums
Hi, This is my first time here Bought an EM at Jurong West Blk 558 Valuation 318K and COV 30K = $348K in all and 1% agent commission. Is that Cheap? Looking for a contractor now. Any reccomendations, pls let me know. Heard it cost a lot to renovate an EM I basically have to REDO everything cos its in "Not nice" condition. Thanks Thanks