isc90152
Members-
Content Count
116 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by isc90152
-
Testing ;p
-
Sorry pple, I'm lost. What banner are you talking about. Is it a sticker kinda thing yeah? Kinda like "neighbourhood watch " that police post give out?
-
CrookedHeart: Finally, someone from 221A Yup at least the windows are done and half the block has been painted. It will be soon for us to get our keys too Eipsy: I am planning for a feature wall in living room with wallpaper to mount the TV. Guess it would be better to put out all the requirements on the table first before deciding on an ID. Nevertheless, 221A is still not ready, have not gone all out to scout for ID yet
-
I balloted for the flat without indicating anything. Does it mean that my flat comes with no tiles and other stuff? thks
-
36 families here now. Great way to get to know the neighbourhood before actually moving in An article for mattress shoppers. http://www.slate.com/id/93956/
-
Ok joining soon DSA, let me update my face book profile first, still empty with ? as the photo
-
I'm a 4 roomer (87m sq). The living room is 3 m wide. I reckon that a 37 inch TV should be still comfortable to watch. wow episy, u got the nearest block to the MRT , high floor somemore If I remember correctly, your block should be the only one that can catch the sun, others are all enclosed facing other balconies
-
Hi guys, are there particular things to look out for? I can only think of 1 open close doors/windows. 2 check whether scv cable/electrical cable working 3 flush toilet 4 flood the toilet to see whether the water follows towards drainage. er tats it
-
called thru the hotline. Refund of option fee takes 4-6 weeks
-
2018? By that time I could have children attending primary school! Then I can tell my children that last time bedok is like that like that.. wait a minute, its actually the same all thru ~40 years.
-
Hi darcbleu. I have signed the agreement during the HDB first appointment and paid the 5%. Its will be 2 weeks this Thursday and I have not got the refund. The hotline is very hard to get thru. End July means I can only start work in Sep (Aug 1st is Chinese Seven Mth). Give or take 2-3 mths renovation, I can only move in Dec or next year. Btw, anyone knows when govt is upgrading bedok interchange? I am very envious of mature estates like amk & toa payoh which have sa sa bo chio interchanges. Bedok one has not been renovated since I was in Primary school.
-
This is an incredible thread still trying my best to revised what the neighbours have discussed so far. I'm 221A 8 floor facing away from MRT. Anyway, any one know how long HDB takes to refund the option fee? Its been 2 weeks and no news at all. Their construction works seems to have slowed down. I am not optimisstic that HDB can give me the keys before lunar 7 mths
-
Hi all, I'm new. In 221A. My keys are not ready though. should be somewhere in July or August
-
Wow, hello neighbour. Can I join? I am in 221C also looking for contractors/IDs. Anybody asked "lobby by the tree" at bedok north block 126? I am surprised by the proximity to our new flats but no mention of them whatsoever. corrections. 221A, they are still painting the place, looks like i will only be asking contractors to work only in september as August is Chinese 7th month.
-
Darwin Interior
isc90152 replied to veroni's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
thanks honey club, can you pm me the guy who served u for reference? keep us updated on the workmanship -
Darwin Interior
isc90152 replied to veroni's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi bro, Thanks for sharing. My flat at Bedok is also 87sqm => interior 85sqm. I cannot comment on your quotations yet as I am just starting to do some scouting myself