Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

MACC

Members
  • Content Count

    3
  • Joined

  • Last visited

Posts posted by MACC


  1. Hi as the title suggests, my new house has existing false ceiling with cornice on the false ceiling. But problem is ex-owner did not install lights in the false ceilings....

    Can i just remove the cornices which are sitting on the FC and just add wiring and lights? Tearing down and re-doing is going to cost alot i think.

    yes you can. all false ceiling, L-box, cornices can open holes to run wires and patched back with a new coat of paint, they will appear like new.


  2. Hi, I'm only doing mino reno works for hall, dining, MBR and 2 toilets but got quoted $25k.

    Is this a ripoff?

    HACKING WORKS

    1 Supply labour to remove existing master toilet floor & wall tiles $450

    2 Supply labour to remove existing master toilet PWC F.O.C.

    3 Supply labour to remove existing master toilet basin & tap F.O.C.

    4 Supply labour to remove existing bath tub at master toilet $ 80

    5 Supply labour to remove existing partials wall at master toilet $100

    6 Supply labour to remove existing door & door frame at master toilet $ 80

    7 Supply labour to remove existing common toilet floor & wall tiles $450

    8 Supply labour to remove existing common toilet PWC F.O.C.

    9 Supply labour to remove existing common basin & tap F.O.C.

    1 lot $2,100.00

    LIVING AREA WORKS

    10 Supply labour & materials to install 1800mmL by 2400mmH feature wall to conceal $2,369.00

    security phone with glass TV console & mirror c/w laminate / veneer $ 1900

    11 Supply labour & materials to install false ceiling with light holder **** area $718.00 $ 718

    DINING AREA WORKS

    12 Supply labour & materials to install 1500mmL by 2400mmH feature wall with mirror $1,056.00 $ 900

    at centre of feature wall c/w laminate / veneer

    13 Supply labour & materials to install wall paper at dining area $ 800 $970.00

    MASTER ROOM WORKS

    14 Supply labour & materials to sand down & vanish of parquet flooring at master room $340.00 $ 250

    15 Supply labour & materials to install 3600mmL by 2400mmH bed head with 2 side $2,330.00 $2330

    mirror c/w laminate / veneer

    16 Supply labour & materials to install false ceiling with light holder at master room $595.00 $ 595

    17 Supply labour & materials to install 3000mmL by 1800mmH wrought iron window $850.00 $800

    grille at master room

    18 Supply labour & materials to install 2400mmL by 600mmW solid plywood at bay $280.00 $ 240

    window c/w laminate / veneer

    BEDROOM 2 WORKS

    19 Supply labour & materials to sand down & vanish of parquet flooring at bedroom 2 $223.00 $200

    20 Supply labour & materials to install suspended shelving with design c/w laminate $515.00 (how long?)

    / veneer

    BEDROOM 3 WORKS

    21 Supply labour & materials to sand down & vanish of parquet flooring at bedroom 2 $223.00 $ 200

    MASTER TOILET WORKS

    22 Supply labour & materials to lay homogeneous floor tiles at master toilet area $328.00 $ 328

    ( base on $2.60 materials )

    23 Supply labour & materials to lay ceramic wall tiles at master toilet area ( base on $1,080.00 $ 1080

    $2.60 materials )

    24 Supply labour & materials to lay water proofing

    $150.00 $ 150

    25 Supply labour & materials to re-locate conceal stainless steel water piping $480.00 $480

    (cold water piping only)

    26 Supply labour & materials to 02 x fix tempered clear glass at in-between master room $985.00 (how big?)

    & master toilet area

    27 Supply labour & materials to install 01 x sling tempered clear glass door at master $695.00 $695

    toilet

    28 Supply labour & materials to install 01 x fix tempered shower clear glass at master $560.00 (if 2-ft wide) $ 300

    toilet shower area

    29 Supply labour & materials to install 1200mmL by 900mmH by 500mmW $520.00 $520

    vanity counter c/w laminate fins at master toilet

    30 Supply labour & materials to install 1200mmL solid surface on top vanity counter $320.00 $280

    31 Supply labour & materials to install 1200mmL top cabinet with mirror door c/w $480.00 $480

    laminate fins at master toilet

    32 Supply labour to install 01 x PWC $80 $120.00

    33 Supply labour to install basin & tap $60

    $80.00

    34 Supply labour to install 01 x heater $60

    $80.00

    35 Supply labour & materials to install false ceiling at master toilet $260 $310.00

    COMMON TOILET WORKS

    36 Supply labour & materials to lay homogeneous floor tiles at master toilet area $364.00

    ( base on $2.60 materials )

    37 Supply labour & materials to lay ceramic wall tiles at master toilet area ( base on $1,404.00

    $2.60 materials )

    38 Supply labour & materials to lay water proofing $150.00

    39 Supply labour & materials to re-locate conceal stainless steel water piping $480.00

    ( cold water piping only)

    40 Supply labour & materials to install 1200mmL by 900mmH by 500mmW $390.00

    vanity counter c/w laminate fins at master toilet

    41 Supply labour & materials to install 1200mmL solid surface on top vanity counter $240.00

    42 Supply labour & materials to install 01 x sling tempered glass door $635.00

    43 Supply labour & materials to install mirror with frame c/w laminate $290.00

    44 Supply labour to install 01 x PWC $120.00

    45 Supply labour to install basin & tap $80.00

    46 Supply labour to install 01 x heater $80.00

    PAINTING WORKS

    47 Supply labour & materials to paint whole house using ICI / NIPPON paint $1,350.00 $ 1280

    HAULAGE / DEBRIS / WASHING

    48 Washing / debris / protection of flooring & haulage $890.00 $890

    Grand Total: $25,230.00


  3. Isn't this expensive or reasonable

    Will list down the item

    1)Hack kitcehn wall + service balcony $1800 -- ( Hack Kitchen, Balcony & 2-Toilet\

    2)Hack kitchen floor + service balcony $780 -- FLOOR & WALL TILES = $2900,

    3)Hack toilet wall for 2 bathroom $600 -- include dismantling Kitchen Cabinet.)

    4)Hack toilet floor for 2 bathroom $400

    5)Dismantle kitchen cabinet $150

    6)Lay kitchen wall + balcony $4000 -- ($ 3500)

    7)Lay kitchen floor + balcony(incl waterproof) $1250 -- (this one he is cheaper $ 1450)

    8)Toilet Package(include sink,bowl incl waterproof)x2 $5600 -- ($ 4500)

    9)Shower screen for master toilet $420 -- (OK)

    10)Kitchen cabinet 22ft $2420 -- ($ 2200)

    11)Solid surface work top 11ft $680 -- (OK)

    12) Run copper pipe for kitchen & toilet $450 -- (OK)

    Est about 18.5k

×