  1. wah! this is really 'chop' ppl price!......it's a very very big markup on their end. Courts only have furniture. The rest of the items are really very expensive. Shop around more. This forum will provide you with tons of information.
  2. I heard Closet Robe staff actually came from Closet Design? I tried getting a quote from Seng Kwong before but it's on the high side.
  3. I agree with you that prices are going up and contractors will have to push their costs to us. Which was why I told my wife that we had to start our renovations asap although I am currently based overseas. So now in the midst of renovations and should be completed by end of July.
  4. Is Homeway the one from Queensway? If yes, i tried getting a quote from them previously and I went down personally with my floorplan. The ID promised to email me the next day with a layout plan. The next day, i saw in my email only a scanned version of what we had talked about and everything on the floorplan were sketches which I had drawn out. There was no input from him at all and when i emailed him to propose a layout as well as the quotation, there was completely no reply after that. Just relating my experience here.
  5. Hi Moderators, Please kindly close this thread as I have confirmed my renovation with another ID firm. Price is slightly higher but the service and response time is much better (keeping my fingers crossed ). Thanks.
  6. Hi I have PM you the reply. Feel free to let me know your comments as I wanna make a comparison and hear all views. Thanks
  7. Hi, this is my quotation. Will appreciate if members here can help to advise on the pricing and will value any feedback. thanks, _________________________________________________________________________________________ 1.00 DESIGN SERVICES 1.01 Interior design & space planning with furniture layout plan FOC 1.02 Perspective drawings, materials & colours proposal FOC 1.03 Site co-ordination to oversee the renovation FOC 1.04 Application of HDB renovation permit FOC 1.05 Arrangement for PUB gas pipe installation & connection FOC 2.00 GENERAL WORKS 2.01 Chemical cleaning upon completion of renovation works $ 1 50.00 2.02 Protection of new flooring with corrugated paper $ 1 50.00 3.00 MASONRY & FLOORING WORKS 3.01 Supply & lay 600mm X 600mm China polished homogeneous floor tiles ****/dining hall & household shelter c/w Teakwood timber skirting $ 1 ,950.00 3.02 Supply & lay laminate flooring at 3 nos bedrooms c/w Teakwood timber skirting (Supreme, cement screeding will be done by HDB contractor) $ 2 ,385.00 3.03 Supply & construct 50mm kitchen cabinet, fridge & washing machine cement mortar base c/w matching tile finish $ 3 00.00 4.00 PAINTING WORKS 4.01 Supply & apply ICI Pentalite or Nippon Super Vinilex 5000 emulsion paint to whole house internal walls & ceilings (unlimited colour choice, oil paint for all exposed pipes & door frame if necessary) $ 1 ,050.00 5.00 CARPENTRY WORKS 5.01 Design & fabricate U-shape kitchen cabinet c/w high-pressure laminate, ABS trimming, designer handles, a chest of drawers, a pair of glass doors, stainless steel dish rack & cutlery tray (22ft total length) $ 2 ,250.00 5.02 Supply & install solid surface worktop at kitchen cabinet c/w backsplash (13ft length) $ 9 75.00 5.03 Design & fabricate L-shape full height wardrobe at main bedroom c/w aluminium framed sliding frosted glass door (9ft length) $ 2 ,250.00 5.04 Design & fabricate half height feature wall for LCD TV **** hall c/w high-pressure laminate finish (7ft length) $ 9 80.00 5.05 Design & fabricate suspended TV console **** hall c/w high-pressure laminate finish (7ft length) $ 7 70.00 5.06 Design & fabricate feature wall cum shoe cabinet at entrance of household shelter c/w highpressure laminate finish (6.5ft length) $ 1 ,430.00 5.07 Design & fabricate wooden plank at window ledge of main bedroom c/w high-pressure laminate finish (L-shape, 10ft length) $ 4 00.00 5.08 Design & fabricate wooden plank at window ledge of bedroom 2 c/w high-pressure laminate finish (9ft length) $ 3 60.00 5.09 Design & fabricate wooden plank at window ledge of bedroom 3 c/w high-pressure laminate finish (9.5ft length) $ 3 80.00 6.00 PLUMBING WORKS 6.01 Supply labour to run extension copper piping for kitchen sink $ 8 0.00 6.02 Supply labour for installation of kitchen sink including tap & drainage piping $ 8 0.00 6.03 Supply labour for installation of storage heater at common toilet $ 9 0.00 7.00 FITMENT WORKS 7.01 Supply & install 10mm clear tempered glass shower screen at main toilet c/w swing door (5.5ft length) $ 5 00.00 7.02 Supply & install aluminium sliding windows with 3-way track at service yard c/w natural anodized frames & normal tinted glass pane (casement window at one side only) $ 7 50.00 7.03 Supply & install aluminium sliding window grilles **** hall & 3 nos bedrooms c/w anodized finish & normal square design (upper portion for full window) $ 9 80.00 7.04 Supply & install top-tracked aluminium sliding door (2-panel) at kitchen entrance c/w white powder coated frame & clear glass panel $ 6 20.00 8.00 AIR-CON WORKS 8.01 Supply & install Mitsubishi Starmax Inverter system 4 air-conditioner ****/dining hall & 3 nos bedrooms (22,000 BTU & 9,000 BTU X 3 respectively) $ 3 ,900.00 9.00 FIBROUS WORKS 9.01 Supply & install false ceiling at dining hall & foyer $ 2 80.00 9.02 Supply & install L-box cornice **** hall $ 4 20.00 10.00 ELECTRICAL WORKS 10.01 Supply labour for installation of 22 nos light fittings for whole house $ 2 20.00 10.02 Supply & install 9 nos new lighting points for living/dining hall $ 3 15.00 TOTAL AMOUNT ………………………………………………………………………………………………… $ 2 4,015.00 NOTES: a The above quotation is subject to revision upon confirmation of dimensions & materials b Polished homogeneous floor tiles for living/dining hall & household shelter are base on $2.50 psf c Haulage & any fees payable to the relevant authorities shall be billed separately base on the amount charged
×