Dear experts, i was being quoted for a major a&a via a direct builder (no external archi, but they have in house archi) for an existing 3 storey and an addition of an attic. there is no rebuilt as we trying to avoid that. there is no change of # of rooms. we did req for an addition ensuite toilet for master and walk in closet. on first look, it looks on the high side. so want to know from you guys which of these big item cost is off grid or optional. thanks alot!
1. Authorities fees :
URA $ 6.5k
BCA $ 2k
Submission by Architect & PE $ 35k
2. prelim works (incl pest control, pre con survey, rto fees, temp toilets, topo survey cost etc) : $65k
3. demolition and excavation : 30k
4. anti termite 2.5k
5. rc sub structure and super structure : ~ 80k
6. steel works ~50k
7. internal and ext wall 30k
8. metal roof 20k
9. waterproofing 7k
10. wall finishes 100k
11. floor finishes 80k
12. ceiling finishes 20k
13. doors, windows, panels 50k
14. external works (walls, gate, drain) 20k
15. m&e 115k
this all excludes carpentry and sanitary fitings. adds up to 713k,
thanks alot