Regarding quotations....
As mine is low budget (unlike some of you) was looking for ID's and comparing cost....
Just wanted basic's reno only... done first... so i came up with a need list of rennovation.... (and send it to 20 ids, five of them replied back ( D'espirit, Promax Homemakers, Weikie, Sk Interior, Artthouts).
Not sure how to attach a word or excel file here... so its all 5 ID's quote are in order but messed up.... try to make sense...If not give me your email id and i will send the comparison chart... in excel format.
The quotation vary from 18k to 24 K. The quote includes aricon, which i just added in the list for fun, as may not be getting the ID to do it
Here's the comparisson, of the five id's, (the tables have disappeared)
D'espirit Promax Homemakers Weikie Sk Interior Artthouts
Masonry Work
1 Supply & lay 60x60 polished homogenous floor tiles with skirting for living & dining hall also for the 3 bedroom homogenous floors
4700 5480 4680 5000 5000
3 Construct cabinet base c/w side tiling. 180 280 460 200 180
4 Construct fridge base c/w full tiling. 100 140 NA 90 80
5 Construct washing machine base c/w full tiling. 100 100 inc 90 80
6 Construct shower kerb c/w full tiling at two bathrooms. 200 NA 160 na 100
Plumbing Work
7 Supply & extend of copper pipes at kitchen. 250 160 250 120 120
8 Supply & extend of outlet pipes for kitchen sink & washing machine. 120 100 60 60
9 Supply labour to install water heater at our 2 bathrooms. 80 FOC 100 50 160
10 Supply labour to install 2 bathrooms accessories. 120 FOC 120 60 80
Ceiling Work
11 Supply & construct simple design cornice **** and dinning area 450 500 420 600 280
12 Supply & construct simple design cornice at 3 bedrooms 480 FOC 400 inc 450
13 Supply Labour to install all ceiling lights 144 FOC 60 FOC 200
100
Aluminum Work
14 Supply & install Whole House Aluminium Window Grilles 1521 980 1700 1295 1347
15 10mm Tempered Glass Shower Screen for Master Bathroom 420 960 400 600 650
16 10mm Tempered Glass Shower Screen for common Bathroom 420 inc 400 inc 650
Painting Work
17 Supply & paint whole unit wall & ceiling using ICI or NIPPON emulsion paint. 1200 1100 1200 1250 1300
18 Supply & paint pipe & gate using gross paint. 180 FOC inc 180
Carpentry Work/ Kitchen
19 Design & fabricate 20ft(L) top & bottom kitchen cabinet c/w solid laminated doors with ABS trimming, 2 nos glass panel, drawers & design handles. 1 set of Cutlery Tray 2200 2000 2400 3200 1800
20 Supply & install 10ft (L) solid surface worktop c/w front profile & backsplash. 850 700 900 840 800
21 Supply & install 2 tier stainless steel dish drainer at kitchen cabinet. 120 inc inc 250
22 Supply & install cooker hood and hob FOC FOC NA NA FOC
23 Design and fabricate 6ft (L) full height wardrobe with sliding door, full mirror at main bedroom 1980 1440 1620 2100 1680
24 Design and fabricate 6ft (L) full height wardrobe with sliding door at another bedroom 1680 1440 1620 1500 1440
Miscellaneous Work
25 Supply & install Mitsubishi ELECTRIC system 3 Split-unit aircon for 3 bedroom.(with 5 yrs compressor and 3 yrs parts warranty by agent). 1999 2050 2050 NA 3650
26 Supply & lay protection covering for floor finishes. 100 FOC FOC 200 120
27 Haulage & debris fees 800 FOC 260 1100 260
28 Acid chemical washing for whole unit. 200 FOC 600 200 150
Hope the above will help give you something to compare with your ID's quote. This is just a intro search to get a feel of the cost price of rennovation.
If any of you have any other quotations, we can add more of this compare list.