Specialkid 0 Report post Posted September 15, 2010 (edited) Renovation Completed see photos attached (will update more once all furnishing arrived ard mid Nov 10) Renovation Period: 8 Sep 2010 - 30 Oct 2010 Floor Plan 3D Design - Part 1 *some changes not updated* Color theme for living and kitchen is black and white Living Room Dining Area Corridor to Storeroom MBR Edited October 31, 2010 by Specialkid Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 15, 2010 3D Design (Part 2) Bedroom 2 Bedroom 3 MBR Toilet Kitchen (LHS) Kitchen (RHS) Share this post Link to post Share on other sites
hippobb 0 Report post Posted September 15, 2010 Welcome to RT!! Nice 3D pics u got there!! ur MBR toilet and Kitchen is also very big... looking forward to more pics!! Share this post Link to post Share on other sites
Banned 1 Report post Posted September 15, 2010 Wow.. Nice nice leh.. Another Tampines neighbour liao! Where is ur place? hardly see any floorplan like this in tampines lehz.. Super spacious lor.. Will be taking note of ur blog.. Haha Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 15, 2010 Must agreed for 4 rooms flat, the size is big compare to those new flats. I'm at Street 91 and I have been staying in this unit for almost 10 years so now we have to shift out for 7 weeks for the renovation to take place. I think the flats here got 20+ years... Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 15, 2010 I'll definitely upload more pics as more renovation progress take place, I'm into the 2nd weeks and looking forward to see the tiling works in another 1-2 weeks time. Lyn Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 15, 2010 (edited) Before & After Pics - Part 1 ** only manage to take some pics ** Part of Living Room Dining Area Part of Kitchen Corridor Leading to Storeroom Edited September 21, 2010 by Specialkid Share this post Link to post Share on other sites
leechaorui 2 Report post Posted September 15, 2010 Welcome to RT. Nice pictures. Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 15, 2010 Before & After Pics - Part 2 Bedroom 2 Bedroom 3 MBR Toilet Share this post Link to post Share on other sites
Banned 1 Report post Posted September 15, 2010 Must agreed for 4 rooms flat, the size is big compare to those new flats. I'm at Street 91 and I have been staying in this unit for almost 10 years so now we have to shift out for 7 weeks for the renovation to take place. I think the flats here got 20+ years... Lyn Oh.. Tampines is really a nice place to stay right.. Its nice to revamp everything once in a while.. Hope u have a smooth reno journey! Share this post Link to post Share on other sites
bangbang 0 Report post Posted September 15, 2010 welcome to RT..i luv ur 3D design...cant wait to see the transform.. Share this post Link to post Share on other sites
marshmallow 0 Report post Posted September 16, 2010 (edited) yay... finally a t-blog with photos that i can see in office... welcome and enjoy your reno journey~ Edited September 16, 2010 by marshmallow Share this post Link to post Share on other sites
sgnick 0 Report post Posted September 16, 2010 Very nice 3D designs. U have lots of carpentry work. Is Willie or Vincent that is overseeing the reno? Share this post Link to post Share on other sites
gals_mama 0 Report post Posted September 16, 2010 Happy renovation! Mine is also 4 room and we took abt 4 weeks plus to finish reno. However, certain things go to close 1 eye and rectifications to be done after HO. Basically we hack kitchen, 2 toilets wall and fl tiles. Laminate 2 rooms flooring, L box the whole hse and carpentry wk. Share this post Link to post Share on other sites
Specialkid 0 Report post Posted September 16, 2010 Very nice 3D designs. U have lots of carpentry work. Is Willie or Vincent that is overseeing the reno? Yes and we are praying that Willie who's over seeing our renov can ensure that by 30 Oct, the house is at least ready for move-in with minor touch-up work. Lyn Share this post Link to post Share on other sites