tittieal 0 Report post Posted June 4, 2008 (edited) Hi everyone. I'm new here to the forum. Greatly needed yr kind advice on the quotation tat i've just rec'd frm my id. Is it reasonable? Thanks in advance! DEMOLISH WORKS Hacking of both bathrooms floor & wall finish Hacking of kitchen’s floor & wall finish Hacking of cement motar bases & dapoh slap Hacking of bathroom’s door & frames Hacking of bathroom’s fitting & accessories Hacking of kitchen cabinet MASONRY WORKS Laying of homogenous floor @ kitchen Laying of homogenous floor @ bathrooms Laying of waterproofing membrane @ kitchen & bathrooms Laying of ceramic wall finish @ kitchen Laying of ceramic wall finish @ bathrooms Construct 50mm cabinet base Construct 50mm washer base Construct 50mm fridge base Construct 50mm shower kerb @ bathrooms PLUMBING WORKS Replacement of standard copper piping Supply & install 2 sets of sitting water closets Supply & install 2 sets of wash basins Labour for installation of storage or instant heater Labour for installation of bathroom accessories Labour for installation of kitchen sink Laying concealed drainage pipe for kitchen sink Laying concealed drainage pipe for bathroom wash basin Laying concealed drainage pipe for washer CARPENTRY WORKS Design & fabricate 20ft kitchen cabinet in ABS trimming laminated doors c/w - Solid surface worktop, designed handles & cutlery tray - Supply & install stainless dish rack - Labour to install cooker hood & hob - Stainless steel panel backing at cooker hob MISCELLANEOUS/GENERAL SERVICES WORKS Supply & install 2 sets of powder coated bi-fold doors @ bathrooms Painting of kitchen & bathroom’s ceiling with ICI emulsion paint Painting of all pipes with gloss paint Laying of floor protection @ affected area flooring Chemical washing Total: 13188.00 (package price for kitchen & bathroom works) ADDITIONAL KITCHEN WORKS To install 11ft solid top for the kitchen cabinet – normal solid top - $770 To add 2ft kitchen cabinet - $200 LIVING ROOM/ HALL AREA Design & fabricate 11ft TV feature wall with laminated finishes (2 layers) - $1650.00 Design & fabricate 7ft TV console with laminated finishes - $980 Design & fabricate 3ft shoe cabinet with laminated finishes - $600 Design & fabricate 7ft feature wall with swing doors for the bomb shelter dorring with laminated finishes - $980 To install 5ft clear mirror on to the dinning hall wall - $840 To install L-box for the dinning hall - $550 To install L-box for the Living hall - $500 MASTERBEDROOM AREA Design & fabricate 6ft wardrobes with ABS trimming sliding laminated doors - $1320 Design & fabricate5ft TV feature wall with laminated finishes with storage space - $800 Design & fabricate 5ft TV console with laminated finishes - $650 Design & fabricate 2ft concealed dressing table with laminated finishes - $400 Design & fabricate 10ft bed head feature wall with laminated finishes with a conceal door for the window - $1400 Design & fabricate 5ft of vanity top with suspended cabinet in laminated finishes with light - $1200 BEDROOM #2 Design & fabricate 5.5ft wardrobe with ABS trimming sliding laminated doors - $1210 OTHERS To run hot water supply from to 2 toilets - $380 To plaster the hall gaps - $60.88 Grand Total: 27600 + 1930 (gst) = $29500 Edited June 4, 2008 by tittieal Share this post Link to post Share on other sites
tittieal 0 Report post Posted June 8, 2008 Anyone can give any kind advice on my above quotes? TIA Share this post Link to post Share on other sites
happywheel 0 Report post Posted June 8, 2008 Hi everyone. I'm new here to the forum. Greatly needed yr kind advice on the quotation tat i've just rec'd frm my id. Is it reasonable? Thanks in advance! DEMOLISH WORKS Hacking of both bathrooms floor & wall finish Hacking of kitchen’s floor & wall finish Hacking of cement motar bases & dapoh slap Hacking of bathroom’s door & frames Hacking of bathroom’s fitting & accessories Hacking of kitchen cabinet MASONRY WORKS Laying of homogenous floor @ kitchen Laying of homogenous floor @ bathrooms Laying of waterproofing membrane @ kitchen & bathrooms Laying of ceramic wall finish @ kitchen Laying of ceramic wall finish @ bathrooms Construct 50mm cabinet base Construct 50mm washer base Construct 50mm fridge base Construct 50mm shower kerb @ bathrooms PLUMBING WORKS Replacement of standard copper piping Supply & install 2 sets of sitting water closets Supply & install 2 sets of wash basins Labour for installation of storage or instant heater Labour for installation of bathroom accessories Labour for installation of kitchen sink Laying concealed drainage pipe for kitchen sink Laying concealed drainage pipe for bathroom wash basin Laying concealed drainage pipe for washer CARPENTRY WORKS Design & fabricate 20ft kitchen cabinet in ABS trimming laminated doors c/w - Solid surface worktop, designed handles & cutlery tray - Supply & install stainless dish rack - Labour to install cooker hood & hob - Stainless steel panel backing at cooker hob MISCELLANEOUS/GENERAL SERVICES WORKS Supply & install 2 sets of powder coated bi-fold doors @ bathrooms Painting of kitchen & bathroom’s ceiling with ICI emulsion paint Painting of all pipes with gloss paint Laying of floor protection @ affected area flooring Chemical washing Total: 13188.00 (package price for kitchen & bathroom works) ADDITIONAL KITCHEN WORKS To install 11ft solid top for the kitchen cabinet – normal solid top - $770 To add 2ft kitchen cabinet - $200 LIVING ROOM/ HALL AREA Design & fabricate 11ft TV feature wall with laminated finishes (2 layers) - $1650.00 Design & fabricate 7ft TV console with laminated finishes - $980 Design & fabricate 3ft shoe cabinet with laminated finishes - $600 Design & fabricate 7ft feature wall with swing doors for the bomb shelter dorring with laminated finishes - $980 To install 5ft clear mirror on to the dinning hall wall - $840 To install L-box for the dinning hall - $550 To install L-box for the Living hall - $500 MASTERBEDROOM AREA Design & fabricate 6ft wardrobes with ABS trimming sliding laminated doors - $1320 Design & fabricate5ft TV feature wall with laminated finishes with storage space - $800 Design & fabricate 5ft TV console with laminated finishes - $650 Design & fabricate 2ft concealed dressing table with laminated finishes - $400 Design & fabricate 10ft bed head feature wall with laminated finishes with a conceal door for the window - $1400 Design & fabricate 5ft of vanity top with suspended cabinet in laminated finishes with light - $1200 BEDROOM #2 Design & fabricate 5.5ft wardrobe with ABS trimming sliding laminated doors - $1210 OTHERS To run hot water supply from to 2 toilets - $380 To plaster the hall gaps - $60.88 Grand Total: 27600 + 1930 (gst) = $29500 Hi I'm also looking for contractor to renovate my house care to share which ID u approach Mine also coming up to 30k additonal items 1) L Box 2) false celing 3) build in wardrobe 4) shoe cabinet with wooden beam 5) tampered glass door for kitchen 6) Feature partition wall c/w shelf in MBR yours is cheaper than mine... cheers Hi I'm also looking for contractor to renovate my house care to share which ID u approach Mine also coming up to 30k additonal items 1) L Box 2) false celing 3) build in wardrobe 4) shoe cabinet with wooden beam 5) tampered glass door for kitchen 6) Feature partition wall c/w shelf in MBR yours is cheaper than mine... cheers Share this post Link to post Share on other sites
tittieal 0 Report post Posted June 9, 2008 Hi I'm also looking for contractor to renovate my house care to share which ID u approach Mine also coming up to 30k additonal items 1) L Box 2) false celing 3) build in wardrobe 4) shoe cabinet with wooden beam 5) tampered glass door for kitchen 6) Feature partition wall c/w shelf in MBR yours is cheaper than mine... cheers Hi happywheel, Hv just PM you my ID. Actually he's quite a nice guy and told us tat he has given us a very reasonable quote. He did mention tat bcoz we are doing quite a few big feature walls tat's why the quote went up. Is carpentry works really tat ex? Share this post Link to post Share on other sites
happywheel 0 Report post Posted June 9, 2008 Hi happywheel, Hv just PM you my ID. Actually he's quite a nice guy and told us tat he has given us a very reasonable quote. He did mention tat bcoz we are doing quite a few big feature walls tat's why the quote went up. Is carpentry works really tat ex? currently everything seem to increase..no respite at all Actually yr ID is not in my list....went passed the shop but didn't bother to go in Share this post Link to post Share on other sites
tittieal 0 Report post Posted June 9, 2008 currently everything seem to increase..no respite at all Actually yr ID is not in my list....went passed the shop but didn't bother to go in Oh, i only request for quotation frm 1 ID so i'm unsure if my quote is reasonable. I've got mixed comments from my friends so was hoping to get some more advice here. Was hoping to commence works before 7th mth Share this post Link to post Share on other sites
JCase 0 Report post Posted June 14, 2008 Looks a bit pricey. Don't be in a hurry, look around. Can't believe that th ID is charging $60 to do some patch work. Calculative. I would drop them on the shortlist for this alone. Hi happywheel, Hv just PM you my ID. Actually he's quite a nice guy and told us tat he has given us a very reasonable quote. He did mention tat bcoz we are doing quite a few big feature walls tat's why the quote went up. Is carpentry works really tat ex? Carpentry is really ex but you need to see the quality of the materials used. Check on few completed projects and specify the quality you require. Document and get this signed off as proof. Share this post Link to post Share on other sites
happywheel 0 Report post Posted June 15, 2008 Hi Titteal Believe your quote is before electrical wiring & lightning . How about the WC & acessories...everything would add up to 35k liao Still thinking who to engage.... Share this post Link to post Share on other sites
tittieal 0 Report post Posted July 12, 2008 Looks a bit pricey. Don't be in a hurry, look around. Can't believe that th ID is charging $60 to do some patch work. Calculative. I would drop them on the shortlist for this alone. Hi JCase, I also asked my ID why he's charging me mere $60 for the patchwork. He told me coz he still has to pay the workers to do the patching so he needs to charge me. He also say coz the patchwork is to be done for the whole hse including the ceilings, living & dining area and MBR. Share this post Link to post Share on other sites
tittieal 0 Report post Posted July 12, 2008 I decided to do up the whole hse including floorings coz i calculated if i take up their other promotion package for living rm & bedrm, it's more worth it than i chose to do the works individually like the feature walls, tv console n shoe cabinet as the cost differs. But there are also certain works which i do not require so i asked the ID if he can let me deduct out the cost for the items that i dun need and he said okie. This is my final quotation. Anyone any advice? TIA greatly Kitchen & Bathroom Package (Total works stated in detailed in post 1) - $13688 Additional items (Kitchen & Bathroom) 10ft Kitchen Solid Top $770 MBR vanity top $1200 2ft kitchen cabinet $200 Hotwater Supply $380 Total for Kitchen & Bathrooms - $ 16238 Flooring Hacking of living and dining floor finish and skirting - 700.00 Hacking of all bedrooms skirting - 100.00 Laying of 600mmx600mm polished homo tiles flr c/w skirting @ Living & Dining area - 2,660.00 Laying of HDF Laminated Flooring c/w skirting @ all Bedrooms - 1,600.00 Make good to hacked off skirting area @ all bedrooms - 150.00 Construct main entrance kerb - 40.00 Alteration of all doors - 50.00 Alteration of existing main gate - 30.00 Living & Dining Area Construct false ceiling @ bedroom's passageway - 100.00 Construct L-box light holder **** area - 500.00 Construct L-box light holder at dining area - 500.00 Construct 1 roll of L-box light holder at MBR - 125.00 Design & fabricate 3ft full height shoe cabinet in laminated finish - 600.00 Design & fabricate 7ft feature wall c/w swing door in laminated finish @ household shelter - 980.00 Design & fabricate 7ft suspended TV console in laminated finish @ Living Area - 980.00 Master Bedroom Design & fabricate 6ft wardrobe in laminated door finish @ MBR - 1,200.00 Misc / General Services Painting of Living, Dining & Bedrooms wall with ICI emulsion paint - 800.00 Painting of all pipes, doors, door frames & gate with gloss paint - 150.00 Painting or revarnishing of existing main door - 80.00 Laying of floor protection after completion of flooring - 150.00 Chemical washing for whole unit - 150.00 General cleaning upon completion - 100.00 Total (Prices pro-rated from Living, Dining & Bedroom Promo Package ) - $ 11,745.00 Additional items (Living Rm & Bedrooms) Design & fabricate 7ft TV feature wall with laminated finishes @ Living Area - 980.00 Design & fabricate 2ft Concealed dressing table with laminated finishes - 400.00 Design & fabricate 5ft TV console with laminated finishes @ MBR - 650.00 Design & fabricate 5.5ft wardrobe with ABS trimming sliding laminated doors - 1,210.00 Top-up to alter MBR wardrobe to sliding laminated doors - 120.00 Total for Additional items - 3,360.00 Grand Total = 31,343.00 Share this post Link to post Share on other sites
tittieal 0 Report post Posted July 12, 2008 I hv another query. Most of my friends told me if renovate whole hse for resale hse, usually the renovation cost will be +/- 30k. True? My initial budget is 23k. Seems impossible to me now Share this post Link to post Share on other sites
Bedok North 0 Report post Posted July 14, 2008 Hi Tittieal, Can you PM me for ID Coy? Would like to get a quote from them? Looks reasonable Share this post Link to post Share on other sites
nath.adrie 0 Report post Posted July 15, 2008 Hi Tittieal, Can PM or mail me (nath.adrie@gmail.com), the name of your ID and company? Hopefully with his email too. Regards Nathaniel Share this post Link to post Share on other sites
thevert 0 Report post Posted July 16, 2008 Hi Tittieal, Do take some time to look at some completed projects(either new flat or resale flat, according to your flat type) of the ID you are thinking of engaging. Ask them if your quotations will include the same materials / same team of workers, that the "showflat" is renovated with. Sometimes the different teams' workmanship will vary! And also check how long the ID/project manager is willing to followup for you (few months?/weeks?/days) after completion/handover/final payment. It's the best advice I can think of at the moment. Share this post Link to post Share on other sites